ML20054D203
| ML20054D203 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/31/1982 |
| From: | Little W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Crouse R TOLEDO EDISON CO. |
| Shared Package | |
| ML20054D204 | List: |
| References | |
| NUDOCS 8204220438 | |
| Download: ML20054D203 (2) | |
See also: IR 05000346/1982011
Text
I
l
I.
MAR 31 082
9
A
s?
og
Docket No. 50-346(DETP)
Q
,
- y
q
C.f ,y
9
'
Toledo Edison Company
NITN:
Mr. Richard P. Crouse
T
4
n
Vice President
";j
, ? " .4 ~5"
M
Nuclear
M'
Edison Plaza
X Ev
,W,
N'%' l
300 Madison Avenue
,
Toledo, OH 43652
7 ')
~
Gentlemen:
This refers to the routine safety inspection conducted by Mr. K. D. Ward of
this office on March 15-17, 1982, of activities at Davis-Besse Nuclear Power
Station, Unit 1, authorized by NRC Operating License No. NPF-3 and to the
discussion of our findings with Mr. C. Daf t and others at the conclusion of
the inspection.
The er. closed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel. As part of this inspection, we reviewed your
program and results related to inspections of thermal sleeves, gaps, and
welds in the safe end nozzle area on the makeup system. Our understanding
of your planned efforts in this area were documented in our Confirmation
of Action Letter dated March 11, 1982. No problems were identified and we
have no further questions in this area.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished.
Consistent with Section 2.790(b)(1), any such application must
G204220430 020331
PDR ADOCK 05000346
T O'['3 [
G
L
I
.
'
.
,
.
Toledo Edison Company
2
,yA;( y y
be accompanied b,y an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
h/ p
W i J%
f
W. S. Little, Chief
Engineering Inspection Branch
Enclosure:
Inspection Report
No. 50-346/82-11(DETP)
cc w/ enc 1:
T. D. Murray, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Harold W. Kohn, Power Siting
Commission
Helen W. Evans, State of Ohio
Robert M. Quillin, Ohio
Department of Health
RIII,
RIII
RIII
RI I
fard/so
DIY
%%
'$ g
lV
Dap)ielson
Nelson
L t
J/ J/fV
3&g
gy /d')
3/22/82
'
- _ _ _ _