ML20054D268
| ML20054D268 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 04/07/1982 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20054D269 | List: |
| References | |
| NUDOCS 8204220498 | |
| Download: ML20054D268 (2) | |
See also: IR 05000461/1982004
Text
.
E
e
APR 7
882
- h
o
C
q
-
Docket No. 50-461(DPRP)
C[,
,-j
f ,D
Docket No. 50-462(DPRP)
.C(
4-
V
j .:
s
,y
,
p
-
--
Illinois Power Company
T
g; [gh)* g
'
ATTN:
Mr. W. C. Gerstner
5
4 '[..,9%p"
Executive Vice President
J
4
s
500 South 27th Street
/
4
Decatur, IL 62525
g
Gentlemen:
This refers to the routine safety inspection conducted by Mr. H. H. Livermore
of this office on February 16 through March 31, 1982, of activities at the
Clinton Power Station, Unit 1, authorized by NRC Construction Permit
No. CPPR-137 and to the discussion of our findings with Mr. C. Hollon at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven (7)
days are available for your review, please notify this office promptly so that
a new due date may be established.
Consistent with Section 2.790(b)(1), any
such application must be accompanied by an affidavit executed by the owner of
the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons which are the bases for the
claim that the ini~or.iation should be withheld from public disclosure. This
@I
8204220498 820407
s
PDR ADOCK 05000461
i/
0
- _ . _ .
g'
PINK COPY
4
.
i
Illinois Power Company
2
o
f
/
/
C
~,/
section further requires the statement to address with specificity the con-
1,
siderations listed in 10 CFR 2.790(b)(4). The information sought to be
- !
,
withheld shall be incorporated as far as possible into a separate part of the
j!
If we do not hear from you in this regard within the specified
j;
periods noted above, a copy of this letter and the enclosed inspection report
^j
will be placed in the Public Document Room.
'
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Duff ginal s i s:... -j .t.L..Specccrd"
R. L. Spessard, Director
Division of Project and
i
Resident Programs
i
Enclosure:
Inspection Report
i
No. 50-461/82-04(DPRP)
i
cc w/ enc 1:
DMB/ Document Control Desk (RIDS)
,
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
Gary N. Wright, Manager,
3
Nuclear Facility Safety-
Randall-L. Plant, Prairie - -
l
Alliance
l
,
.
'
.
I
l
f'
(
RIII
RIII
RIII
(
.
Walker /so
Knop
Spessard
i
l
t
4/5/82
i
-
l
l
.
l
!