Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20063P063 + (02:21:35, 17 December 2024)
- 0CAN028205, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/81-30 & 50-368/81-29.Corrective Actions:Formal Training Sessions Will Be Conducted W/Appropriate Station Personnel to Stress Importance of Individual Responsibility + (02:21:36, 17 December 2024)
- ML20063P059 + (02:21:36, 17 December 2024)
- ML20063P058 + (02:21:37, 17 December 2024)
- 0CAN078205, Provides Status Update on Gaseous Radioactive Waste Sys Mods,In Response to Violations Noted in IE Insp Repts 50-313/80-20 & 50-368/80-20.High Airborne Activity Incidents in Auxiliary Bldgs Significantly Reduced + (02:21:38, 17 December 2024)
- ML20063P052 + (02:21:38, 17 December 2024)
- JAFP-82-1053, Forwards Monthly Operating Rept for Sept 1982 + (02:21:39, 17 December 2024)
- ML20063P045 + (02:21:39, 17 December 2024)
- ML20063P037 + (02:21:40, 17 December 2024)
- ML20063P040 + (02:21:40, 17 December 2024)
- ML20063P036 + (02:21:41, 17 December 2024)
- ML20063P034 + (02:21:42, 17 December 2024)
- ML20063P026 + (02:21:42, 17 December 2024)
- ML20063N990 + (02:21:43, 17 December 2024)
- ML20063P024 + (02:21:43, 17 December 2024)
- ML20063N988 + (02:21:44, 17 December 2024)
- ML20063N964 + (02:21:44, 17 December 2024)
- ML20063N962 + (02:21:45, 17 December 2024)
- 0CAN108202, Updates 811021 Response to Generic Ltr 81-04, Emergency Procedure & Training for Station Blackout Events. Seal Return Isolation Is Possible During Blackout & Is Provided for in Procedures + (02:21:46, 17 December 2024)
- ML20063N959 + (02:21:46, 17 December 2024)
- ML20063N954 + (02:21:47, 17 December 2024)
- 05000272/LER-1982-071-04, /04L-0:on 820827,control Operator Discovered Increasing Level on Plant Vent Radioactivity Monitor & Issued Significant Event Notifications for Unplanned Releases.Caused by Primary Coolant Leakage from RCS Filter + (02:21:49, 17 December 2024)
- ML20063N951 + (02:21:53, 17 December 2024)
- ML20063N949 + (02:21:53, 17 December 2024)
- 05000272/LER-1982-071, Forwards LER 82-071/04L-0.Detailed Event Analysis Encl + (02:21:54, 17 December 2024)
- 05000272/LER-1982-074-04, /04L-0:on 820903,indication of Unplanned Release Through Plant Vent Received.Three Individuals Contaminated During Attempts to Locate Source.Caused by Door Hitting Against Drain Valve 1CV332,causing Valve to Loosen & Open + (02:21:58, 17 December 2024)
- ML20063N937 + (02:21:59, 17 December 2024)
- ML20063N938 + (02:21:59, 17 December 2024)
- GO2-82-803, Advises That Deficiency Repts Re Electrical Cable Routing, Termination,Labeling,Power Supplies & QC Documentation Have Been Reopened.Interim Repts Will Be Provided by 821218 + (02:22:00, 17 December 2024)
- 05000272/LER-1982-074, Forwards LER 82-074/04L-0.Detailed Event Analysis Encl + (02:22:01, 17 December 2024)
- 05000247/LER-1982-034-03, /03L-0:on 820828,during Normal Operation,Charging Pump 22 Developed Leak & Was Declared Inoperable.Caused by Defective Gasket on Cylinder Head 4.Gasket Replaced & Pump Returned to Svc + (02:22:02, 17 December 2024)
- 05000247/LER-1982-034, Forwards LER 82-034/03L-0 + (02:22:03, 17 December 2024)
- 05000311/LER-1982-098-03, /03L-0:on 820901,indication of Low Svc Water Flow Received on Containment Fan Coil Unit 21.Caused by Silt build-up in Cooling Coils.Svc Water Flow Control Valve Cycled & Coil Unit Tested Satisfactorily + (02:22:05, 17 December 2024)
- ML20063N916 + (02:22:06, 17 December 2024)
- 05000311/LER-1982-098, Forwards LER 82-098/03L-0.Detailed Event Analysis Encl + (02:22:07, 17 December 2024)
- 05000293/LER-1982-035-03, /03L-0:on 820830,during HPCI Surveillance Test, Gland Seal Condenser Gasket Failed.Caused by Overpressure of Gasket During Startup.Gasket Matl Changed to Rubber Bonded Asbestos.Unit Tested & Returned to Svc + (02:22:08, 17 December 2024)
- ML20063N907 + (02:22:09, 17 December 2024)
- ML20063N903 + (02:22:10, 17 December 2024)
- ML20063N894 + (02:22:11, 17 December 2024)
- ML20063N901 + (02:22:11, 17 December 2024)
- ML20063N893 + (02:22:12, 17 December 2024)
- ML20063N892 + (02:22:13, 17 December 2024)
- ML20063N890 + (02:22:13, 17 December 2024)
- ML20063N888 + (02:22:14, 17 December 2024)
- 05000293/LER-1982-035, Forwards LER 82-035/03L-0 + (02:22:15, 17 December 2024)
- ML20063N878 + (02:22:15, 17 December 2024)
- ML20063N877 + (02:22:16, 17 December 2024)
- ML20063N873 + (02:22:16, 17 December 2024)
- ML20063N861 + (02:22:17, 17 December 2024)
- ML20063N862 + (02:22:17, 17 December 2024)
- 05000272/LER-1982-073-03, /03L-0:on 820906,calculation Showed That Quadrant Power Tilt Ratio for Bottom Detector N42 Exceeded Max Allowable Limit.Caused by Failed Milliamp Detector Switch in Current Meter Assembly.Assembly Replaced & Channel Tested + (02:22:19, 17 December 2024)