ML20063P036

From kanterella
Jump to navigation Jump to search
Advises That Fuel Load Date Scheduled for Dec 1985,per NRC Request.Schedules Do Not Preclude Achieving Fuel Load 6 Months Earlier.Planning Details Provided Basis for Discussions W/Nrc Caseload Forecast Panel on 820831-0902
ML20063P036
Person / Time
Site: Satsop
Issue date: 10/01/1982
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
GO3-82-999, NUDOCS 8210120197
Download: ML20063P036 (1)


Text

. _.

. Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 Docket No. 50-508 October 1, 1982 G03-82-999 Mr. D. G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Eisenhut:

\\

i

Subject:

FUEL LOAD SCHEDULE FOR WNP-3 i

At the request of Mr. L. L. Wheeler, Project Licensing Manager for WNP-3, the following infonnation is provided relative to the WNP-3 fuel load schedule.

The project target fuel load date for WNP-3 is December 1985. All project construction schedules and contracts are geared to support this date.

In fact, schedules have been set so as not to preclude achieving fuel load six (6) months earlier (i.e., June 1985). Details of our planning to meet or better the project target date provided the basis for our discussions witti the NRC Caseload Forecast Panel on August 31 -

September 2, 1982.

Very truly yours, G. D. Bouchey, Manager Nuclear Safety & Licensing GCS/sm 3oo/