Final Deficiency Rept DER 82-18 Re Westinghouse Pump Motors. Initially Reported on 820423.Motors Found W/Deteriorating Epoxy Coatings & Metal Particles in Lube oil.C-E Determined Incident Not Reportable Per 10CFR50.55e
ML20063N938
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 09/16/1982
From: Van Brunt E, Vanbrunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-21850-GHD, DER-82-18, NUDOCS 8210070374
Download: ML20063N938 (5)


Text

Docket nos. 50-528/529/530

50. 55 (e) Report

,-3 LWM lyqFi!Y(RC M M y{qj(Q g y g >'

'~

^

j

~

3003 STA.

p 0,,o x, g, _

pgoon,x,,,y zona ng, Sept'eber 16, 1982 ANP:-21850-Gild /BSK U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Final Report - DER 82-18 A 50.55(e) Report Relating to Unit 1 IIPSI Pump Motors (Westinghouse) Supplied by C. E. llave Metal Particles in Lube Oil and Deterioration of Internal Epoxy Coating.

File:

82-019-026 D.4.33.2

Reference:

(A) Telephone Conversation betveen T. Bishop and G. Duckworth on April 23, 1982 (B) ANPP-20972, dated May 17, 1982 (Interim Report)

Dear Sir:

Attached is our final written report of the deficiency referenced above, which has been determined to be Not Reportable under the requirements of 10CFR50.55(e).

Very truly yours,

\\

F T -

QR1

'~

1 Ll(

E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/ Gild:db Attachement cc: See Attached Page 2 S

l U. S. Nuclear Regulatory Commission September 16, 1982 Attention:

Mr. D. M. Sternberg, Chief ANPP-21850-CHD/BSK Page 2 cc: Richard DeYoung, Director Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

J. A. Roedel D. B.

Fasnacht C. C. Andognini A. C. Rogers B. S. Kaplan W.

E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson-L. E. Vorderbrueggen G. A. Fiorelli i

Lynne Bernabei, Esq.

liarmon & Weiss 1725 "1" Street, NW Suite 506 Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503

.___----_.___J

1 M

FINAL REPORT - DER 82-18 DEFICIENCY EVALUATION 50.55(e)

A'tIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNIT 1 i

l I.

DESCRIPTION OF DEFICIENCY l

During the startup prerequisite test and inspection for the High Pressure Safety Injection system pump motors (Tag Nos. SIA-P02/

SIB-P02) supplied by Combustion Engineering as part of the NSSS contract, a condition of deteriorated epoxy coating was observed on the inside of motor frames. Additional inspection disclosc' ferrous metal chips and filings in the motor oil of both motors.

I II.

ANALYSIS OF SAFETY IMPLICATIONS APS and Bechtel requested assistance from Combustion Engineering in evaluating this condition,and agree with the C-E determination of Not Reportable under the requirements of 10CFX50.55(e).

Should this condition remain uncorrectad7 it would not impair pump operation and would not result iti ~a safety signifiennt condition.

III. CORRECTIVE ACTION The referenced NCR will be dispositioned to flush and replace the motor oil in both motors, i

1


.--_-----__---_______---_-----.-._--u

~

s C-E rev.cr Systsms Tel 203;6SS 1911 Attechment to DER 82-10 Co-c.snon E n;ineering. Inc Telex 99297 1000 Prespe : Hm Reac Windsor Connecticut 06095 7f7 POWER' cL SYSTEMS

'/4d%G m i.e ufMO W r

Mr. W. G. Bingham June 16, 1982

~--

Bechtel Power Corporation M21 '82 12400 East Imperial Highway V-CE-16588 Nomalk, CA 90650 7 ~ '- ~~

K... uv.

SUBJECT:

Bechtel Power Corporation Wf Zam. L y

Unit #1 HPSI Pump Motors DER No. 82-18

- -1",'

J

_~

'u

References:

Bechtel Power Corporation Letters g?{ -~ T

1) B/CE-E-39547, dated 4/22/82.

t7.

2) B/CE-E-40198, dated 6/9/82.

~

(* m

-~

(itCl

Dear Mr. Bingham:

h5Tw

(

-J_ %,( '

5 The subject DER refers to two separate issues, deterioration of an

-y;',

Z.

epoxy coating and oil impurities in the HPSI pump motors. These E Rn issues will be addressed individually.

S [byg; Ecoxy Deterioration The introducing statement alludes to a deterioration of the epoxy coating "inside the motor frames" while the final statement would make one believe there was deterioration within the bearing housing.

The interior of the bearing housing is not meant to be painted. Some paints might enter the sight glass port when the exterior of the housing is painted. Deterioration of this paint or other paint within the motor will not interfere with its function.

Oil Impurities The bearing housings on these motors are of sufficient size to allow settling of metal chips and filings. Lubrication of the sleeve bearings is via oil rings which would not recirculate the settled particles. The attached NCR describes satisfactory bearing surface examination under the direction of a Westinghouse representative.

This examination occured after pumps operation.

These conditions have been reviewed, and in C-E' s opinion, is not reportable under the requirements of 10CFR50.55(e) or 10CFR Part 21.

N

~

~ - ' ~ - -

Attachment to DER 82-18 2

(

C-E's evaluation has been performed in accordance with our Quality Ass ~urance.of Design Manual as demonstrated by FAR 14273-438, which is available for review at C-E Windsor offices.

If there are any further questions, please fee.1 free to contact us.

Very truly yours, COMBUSTION ENGINEERING INC.

e F6 C. Ferguson Project Manager CF/JS:kis

(

xc: Messrs:

E. E. Van Brunt, Jr.

G. C. Andognini J. Vorees W. H. Wilson R. H. Holm J. W. Dilk G. A. Butterworth S. N. Mager D. B. Amerine W. L. MacDonald w

-