OPERATING DATA REPORT DOCKET NO. 333 DATE Octoher 1982 J. Cook COMPLETED BY(315) 342-3840 TELEPilONE OPERATING STATUS FITZPATRICK Notes

1. Unit Name:
2. Reporting Period:

820901 - 820930 2436

3. Licened Thermal Power (MWr):

883

4. Nameplate Rating (Gross MWe):

821

5. Design Electrical Rating (Net MWe):

830

6. Maximum Dependable Capacity (Gross MWe):

810

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Gise Reasons:

~

None

9. Power Lesel To Which Restricted,If Any (Net MWe):

None

10. Reasons For Restrictions,if Any:

This Month Yr.-to-Date Cumulatise i1. Ilours in Reporting Period 720 6551 62928

12. Number Of flours Reactor Was Critical 720 4882.4 44433.6
13. Reactor Reserve Shutdown liours 0

0 0

14.11ours Generator On.Line 720 4779.C 43223.2

15. Unit Reserve Shutdown flours 0

0 0

1724304 11045640 89446954

16. Gross Thermal Energy Generated (MWil) 576460 3741900 3050?S10
17. Gross Electrical Energy Generated (MWill
18. Net Electrical Energy Generated (MWil) 559945 3631145 29535875 100%

73.0%

68.7%

19. nit Service Factor 100%

73.0%

68.7%

i

20. Unit Availability Factor 96.0%

68.4%

62.1%

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 94.7%

67.5%

.57.2%

23. Unit Forced Outage Rate 0

2.8%

15.6%

24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each t:

11aintenance outage scheduled for 29 October, 1982 for a period of 10 days.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed j

INIllA L CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPER ATION f 8210120243 821004 i POR ADOCK 05000333

-R PDR

AVERACE DAILY UNIT POWER LEVEL 50-333 DOCKET NO.

UNIT JAFNPP DATE October 1982 CON!PLETED BY J. Cook TELEPilONE (315)342-3840 510 NTH _ September 1982 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (h!W -Net)

(51We Net) 788 786 17 2

784 18 791 3

783 19 788 4

787 20 792 783 21 793 5

792 6

786 22 786 23 791 7

8 787 24 791 795 785 25 9

784 26.

792 10 791 in 591 27 683 792 12 28 792 13 776 29 780 793 30 14 is 784 3

4 700 16 t

SUMMARY

The unit operated at near 100% full rated thermal power for this entire reporting period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-333 UNIT N AME FitzPatrich DATE ncenhov log?

COMPLETED BY J. Cook' REPORT MONTil _ September, 1982 TELEPilONE ( 31 'il 149-1R40 n.

','5eaE E

c es

.s 4 Licensee Ev c

Cause & Corrective a

.2 e s

8. ".

o N" -

D't e i

li ?

iii

.5 s 5 Event sT Action to c$ E 5

j5g Reporia iN G Prevent Recurrence

~

6 6

820911 S

0 H

4 N/A N/A N/A Reduced Power for Rod Sequence Exchange and Scram Time Testing b

l 2

3 4

F: Forced Reason:

Method:

Exhibit G. instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets l'or Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG.

D Regulatory Restriction 4 01her (Explain) 0161)

E-Operator Training & License Examination F Administrative 5

G Operational Error (Explain)

Exhibit I S.ime Source Il Other (E xplain)

-POWER AUTHORITY OF THE STATE OF NEW YORK

-JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE ~

SUMMARY

OF OPERATING EXPERIENCE SEPTEMBER, 1982

-The unit operated at near full thermal power during this reporting period.

At the end of the reporting period the unit is operating at approximately 793 Mwe.

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR. POWER PLANT SAFETY RELATED ELECTRICAL & MECHANICAL MAINTENANCE

SUMMARY

SEPTEMBER 1982 O

DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T

ET 8/23 10 20938 OPS Manual brake release Replaced knob 12 MOV-25B knob fell off 8/25 13 20959 OPS Deteriorated 'O' ring Replaced 'O' ring.with Ethylene-4 RCIC Turb.

caused sight glass to Propolene leak 9/11 01-107 20931 OPS None Replaced desicant in^ drying 60 D6 A & ~d towers old desicant was dry - no evidence of wetting 9/11 10 19249 OPS Motor burned up while Replaced motor 30' MOV-25A operating the valve -

1 possibly improper operation 9/14 24 19077 OPS Motor limits and Readjusted 6

EOD-2 linkage out of ad-justment 9/24 27 18161 OPS Valve closed by itself Troubleshoot and found no problem 4

SOV-122A for no apparent reason 9/21 27 18744 OPS Valve would not shut Operations could not duplicate 0

l AOV-126A fully problem - they are satisfied with valve operation 9/21 70 18117 VISUAL Broken belt Replaced belts 3

i KhU-3B 9/21 70 18133 OPS Improper valve line up Operations relabled air lines 6

FN-6A and opened valves I

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT

~

MAINTENANCE

SUMMARY

I&C SEPTEMBER 1982 WORK REQUEST #

DATE SYSTEM TECTED CAUSE OF RESUETS OF ACTION TAKEN REPAIR COMPONENT #

MALFUNCTION MALFUNCTION TO PRECLUDE TIME RECURRENCE HOURS 19216 Test button 9/14 02 VMR-71G OPS Bias drift Blas too low must be held 1

9/8 02 R-1F OPS Bias drift as reading Adjusted bias-2 20866 9/1 02 VMR-71E OPS Bias drift Bias low Adj usted 2

19108 Cold solder Indicator does' Resoldered 9/1 02-3 LI-85A I&C connection not respond joint

,10 13664 Defective Q14 Replaced Q14, 9/10 07 SRM Spare I&C in pulse ht No indication performed 63-disc IMP-7.1 l

I&C lowered set Reset set point

~

18144 9/21 07 APRM E OPS Point for None to normal

.3 OPS valve 18187 Dirty slide Recorder is Cleaned and

~9/28 07 PR-46D OPS wire erratic calibrated 2

19195 Count trip set Unit inop with Reset count l9/1 07 APRM E OPS high proper count trip 1

l 19229 Drive mechanism Recorder rightened, j9/27 07 PR-46A OPS loose

$f[ age d

erratic 2

t 20957 Low clutch TiP probe won't Increased torque i9/13 07 Tip B RXA torque drive in fully value 15 20987

!9/10 07 Tip A RXA L w c utch rip probe won't Increased torquo drive in fully setting 9

I

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C SEPTEMBER 1982 1

WORK REQUEST #-

CAUSE OF RESULTS OF ACTION TAKEN REPAtR

,, AT E SYS T E',1 D

COMPONENT #

MALFUNCTION MALFl)NCTION TO PRECLUDE TIME RECURRENCE HOURS 20988 Normal Several lights Replaced burnt 8/30 07 Tips All RXA burnout out out lights 30 19203 Defective pen Recorder Replaced motor, 9/7 20 FR-528 OPS drive motor response too cleaned gears 16 slow 81210 Differential Sump integrator 9/29 l

20 FQX-530 OPS pressure in None required 1

pipe creeps 19201 Recorder drive Recorder stucN Cleaned 9/3 i

23 VM/VR OPS mechanism dirty upscale drive 6

l TE connectors 16858 Descrepancies Reconnected TE lugged in 2/19 i

68 TR-103 OPS in temperatures in drywell 1-D I

20956 Cold solder Point 15 Resoldered 9/1 i

68 TR-103 OPS joint unreasonably defectiv 48 I

hich loint f[ces 9/2 76 1

3 TON I&C

^'