1 4

Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 Docket No. 50-508 October 6,1982 G03-82-1015 Ms. Janis D. Kerrigan,' Chief Licensing Branch No. 3 (Acting)

Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

NUCLEAR PROJECT 3 AMENDMENT #1 TO THE FSAR Pursuant to 10CFR2.101(a) and in accordance with the guidance contained in Generic Letter 82-14, the Washington Public Power Supply System (Supply System) is filing herewith sixty (60) copies of Amendment #1 to the FSAR for Nuclear Project 3 (WNP-3).

This amendment contains the init.ial phase of the WNP-3 Review for Con-formance with the Standard Review Plan (SRP) NUREG 0800, as required by 10CFR50.34 (g).

At the time this rulemaking was promulgated, the WNP-3 Application was 3 dol in the final publication process end it was not feasible to include 5

this information in the tendered dccuments. Discussions with the NRC

/

Licensing Branch indicated the acceptability of presenting the required f/ @

information in phases. The first phase in this amendment #1, provides statements of conformance with each SRP acceptance criteria for the WNP-3 design.

w.

d Where differences exist between the WNP-3 design criteria and the ac-ceptance criteria identified in the SRP, a schedule has, in most cases been provided. This schedule shows when the bases will be presented for concluding that the WNP-3 design criteria are in compliance with the Commission's Regulations.

8210120194 821006 DR ADOCK 05000

Ms. Janis D. Kerrigan Page 2 October 6, 1982 G03-82-1015 NUCLEAR PROJECT 3 AMENDMENT #1 TO THE FSAR In those few cases where the Supply System has not completed the confor-mance review, the missing information or a schedule for providing it will be presented in the next Anendment.

Additionally, this Amendment contains information intended to update the design description and correct typographical errors. Should you require further information or clarification, the Supply System point of contact for this action is the WNP-3 Licensing Project Manager, Mr. K. W. Cook (206/482-4428).

Sincerely, S

G. D. Bouchey, Manager Nuclear Safety and Licensing GDB/pm cc: WG Albert - NRC 726 w/o NS Reynolds - D & L w/o D Smithpeter - BPA 762 w/c LL Wheeler - NRC w/o DJ Chin - Ebasco i

N STATEOFWASHINGTON)

Subject:

Amendment #1 FSAR WNP-3 ss COUNTY OF BENTON I G. C. Sorensen, being duly sworn, subscribe to and say that I am the Manager, Licensing Programs for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made ir, it are true..

DATED bCF b

,1982.

/G. C. Sofensen, Manager Licensing Programs On this day personally appeared before me G. G. Sorensen to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIVEN under my hand and seal this b

day of O eA n b.o_3_3 1982.

htilet\\h Notary P6blic in nd f'r the o

State of Washingto Residing at M e ru h,O h.

M.

h36.2.Y M s