Docket.Nos. 50-528/529/530 E U~_ND o
50.55(e) Report i
- '^
s
\\
d
,.,.,~3
...it.
c l l M S M ' M MidST8 '
3003 STA.
P.o. sox 21666 PHOENIX. ARIZONA 85036 September 15,.i1982 ANPP-21835-GHD/BSK U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:
Mr. D. M. Sternberg, Chief Reactor. Projects Branch 1
Subject:
Final Report - DER 82-24 A 50.55(e) Report Relating to Weld Procedure Not Prequalified by Ametek-Straza for Reactor Hot Leg Pipe Stops.
File: 82-019-026 D.4.33.2
Reference:
(A) Telephone Conversation between T. Bishop and G. Duckworth on May 14, 1982 (B) ANPP-21154, dated June 8, 1982 (interim Report)
Dear Sir:
Attached is our final written report of the deficiency referenced above, which has been determined to be Not Reportable under the requirements of 10CFR50.55(e).
Very truly yours,
._\\
4.LL rx E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/GHD:db Attachment cc: See Attached Page 2
\\
p-...
IT8210070320 820915
~
E,5 N ADDCK 05000528 i
F
- g m
cel i
e i
e U. S. Nuclear Regulatory Commission Septeinber 15, 1982 Attention:
Mr. D. M. Sternberg, Chief ANPP-21835-GHD/BSK l
Page 2 i
r cc: Richard DeYoung, Director Office of. Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
J. A. Roedel D. B.-Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J..A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen-G. A. Fiorelli Lynne Bernabei, Esq.
Harmon & Weiss 1725 "1" Street, NW Suite 506 Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 q-l
' +.
-r y-r.
.p i
_m,m_
_____a_..--m i
o O
FINAL REPORT - DER 82-24 DEFICIENCY EVALUATION 50.5S(e)
ARIZONA PUBLIC SERVICE COMPANY (APS) l.
PVNGS UNITS 1, 2 & 3 I.
DESCRIPTION OF DEFICIENCY j
Project procurement specification 13-CM-125B for miscellaneous Structural Steel awarded to Ametek Straza, paragraph 4.13.4 requires that "Al' weld procedures shall be submitted and approved prior to the start of fabrication... Welding procedures which conform with Sections 2, 3, 4'and 8 of the Structural Welding Code AWS Dl.1, shall be deemed as prequalified and are exempt from tests for qualification. Other procedures shall be qualified by tests as prescribed in Section 5 of AWS DI.l."
The reference drawing specifies a shop weld between ASTM A514 Grade F and ASTM A579 Grade 12 material for the NSSS "E" (Hot Leg Pipe) stops.
ASTM A579 is not a material listed under Section 8 of AWS DI.1, hence qualification tests are required.
A review of the welding procedures applicable to this order revealed that the weld between the above materials was made without the supplier submitting the required weld procedure to Bechtel for review prior to welding.
II.
ANALYSIS OF SAFETY IMPLICATIONS This condition is evaluated as not reportable. Ametek Straza has submitted Supplier Deviation Disposition Request (SDDR) Log No. 3340 documenting that a non-qualified weld procedure AWS #1 was used. The SDDR also documents the Post Weld Qualification Test Records for AWS #1.
The acceptance of the SDDR was based on the satisfactory results of the tests. This information documents that a safety significant condition never existed and that no rework is required.
III. CORRECTIVE ACTION Bechtel has accepted SDDR Log No. 3340 dispositioned use-as-is by Ametek Straza, and has retained the weld procedut submittal in Drawing and
-Data Control. A review of all the documentacion related to this specification did not reveal any additional documentation deviations.
>