- ML20070A785 + (15:07:50, 16 December 2024)
- ML20070A781 + (15:07:57, 16 December 2024)
- ML20070A779 + (15:07:58, 16 December 2024)
- W3P90-1549, Application for Amend to License NPF-38,consisting of Tech Spec Change Request NPF-38-113,revising Surveillance Requirements of Tech Spec 4.4.8.3.1 to Reflect Design of Shutdown Cooling Sys Suction Line Isolation Valves + (15:07:59, 16 December 2024)
- ML20070A752 + (15:08:06, 16 December 2024)
- ML20070A748 + (15:08:07, 16 December 2024)
- 0CAN019106, Responds to Violations Noted in Insp Repts 50-313/90-42 & 50-368/90-42 on 901017-1207.Corrective Actions:Activities Involving Radioactive Matl Processing Outside Controlled Access Area Halted & Health Physics Training Revised + (15:08:07, 16 December 2024)
- ML20070A740 + (15:08:09, 16 December 2024)
- ML20070A742 + (15:08:09, 16 December 2024)
- ML20070A733 + (15:08:10, 16 December 2024)
- ML20070A735 + (15:08:10, 16 December 2024)
- ML20070A725 + (15:08:11, 16 December 2024)
- ML20070A728 + (15:08:11, 16 December 2024)
- ML20070A716 + (15:08:15, 16 December 2024)
- ML20070A701 + (15:08:16, 16 December 2024)
- ML20070A686 + (15:08:24, 16 December 2024)
- ML20070A677 + (15:08:25, 16 December 2024)
- 05000324/LER-1982-124, Forwards LER 82-124/01T-0.Detailed Event Analysis Encl + (15:08:32, 16 December 2024)
- ML20070A636 + (15:08:33, 16 December 2024)
- 0CAN128203, Forwards Emergency Operations Facility (EOF) Summary Info, Per G Vissing 821203 Request & Generic Ltr 82-10.Const of Permanent Backup EOF Completed + (15:08:40, 16 December 2024)
- AECM-82-427, Responds to NRC Re Violations Noted in IE Insp Rept 50-416/82-58.Corrective actions:10CFR50.59 Evaluation Required Prior to Mod of Radwaste Solidification Sys Will Be Performed & Procedures Revised + (15:08:41, 16 December 2024)
- GO2-91-008, Forwards Rev 8 to Guard Training & Qualification Plan.Rev Withheld + (15:08:41, 16 December 2024)
- ML20070A618 + (15:08:42, 16 December 2024)
- ML20070A621 + (15:08:42, 16 December 2024)
- ML20070A609 + (15:08:43, 16 December 2024)
- ML20070A614 + (15:08:43, 16 December 2024)
- AECM-82-425, Responds to NRC Re Violations Noted in IE Insp Rept 50-416/82-58.Violation Denied as Stated.Caused by Misinterpretation of Plant Administrative Procedure 01-S-08-5, Radiological Surveys & Surveillance + (15:08:44, 16 December 2024)
- NRC-90-0189, Suppls 890301,0616 & 901004 Responses to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Last Outstanding Item from Ltr Re Accumulator Isolation Capability Testing Completed on 901224 + (15:08:44, 16 December 2024)
- ML20070A584 + (15:08:45, 16 December 2024)
- ML20070A581 + (15:08:46, 16 December 2024)
- 05000364/LER-1982-046, Forwards LER 82-046/03L-0 + (15:08:47, 16 December 2024)
- ML20070A578 + (15:08:47, 16 December 2024)
- ML20070A573 + (15:08:48, 16 December 2024)
- ML20070A572 + (15:08:48, 16 December 2024)
- ML20070A569 + (15:08:49, 16 December 2024)
- ML20070A566 + (15:08:49, 16 December 2024)
- 2CAN019106, Monthly Operating Rept for Dec 1990 for Arkansas Nuclear One Unit 2 + (15:08:50, 16 December 2024)
- ML20070A561 + (15:08:56, 16 December 2024)
- ML20070A560 + (15:08:56, 16 December 2024)
- ML20070A559 + (15:08:57, 16 December 2024)
- NRC-91-0002, Monthly Operating Rept for Fermi 2 for Dec 1990 + (15:08:57, 16 December 2024)
- LIC-94-0141, Discusses Investigation Re 940422 Discrepancy in Potentiometer & Attachable Switches + (15:08:58, 16 December 2024)
- AECM-82-424, Responds to NRC Re Violation Noted in IE Insp Rept 50-416/82-58-02.Corrective actions:10CFR50.59 Safety Evaluation of Chem-Nuclear Solidification Sys Performed & Personnel Instructed to Perform Evaluation Prior to Mod + (15:09:06, 16 December 2024)
- 1CAN019106, Monthly Operating Rept for Dec 1990 for a Arkansas Nuclear One Unit 1 + (15:09:06, 16 December 2024)
- BSEP-82-2365, Responds to NRC Re Violations Noted in IE Insp Repts 50-324/82-37 & 50-325/82-37.Corrective Actions:Eight Addl Spare Cylinders Purchased & Weekly Review to Be Conducted to Ensure Fire Brigade Training Current + (15:09:07, 16 December 2024)
- PY-CEI-NRR-1289, Monthly Operating Rept for Perry Nuclear Power Plant Unit 1 for Dec 1990 + (15:09:07, 16 December 2024)
- ML20070A545 + (15:09:08, 16 December 2024)
- ML20070A543 + (15:09:09, 16 December 2024)
- 05000339/LER-1982-013-03, During Periodic Surveillance Test,One Diesel Generator & One Offsite Power Supply for Emergency Bus 2H Became Temporarily Inoperable. Caused by Deficiency in Procedure.Periodic Test Changed + (15:09:11, 16 December 2024)
- ML20070A539 + (15:09:12, 16 December 2024)
- ML20070A529 + (15:09:13, 16 December 2024)
- ML20070A535 + (15:09:13, 16 December 2024)