, f "LCF Southem Califomia Edison Company 23 PA19KEH S1 AEET tRVINE, CAltF'ORNIA 92718 une 24, 1994 WAMER C. MARSH m,-
a naa, or u n tan nea a a w n an a..
<mm.-m U. S. Nuclear Regulatory Commission Attention: Document Control Desk l
Washington, D.C.
20555 Gentlemen:
i
Subject:
Docket Nos. 50-361 and 50-362 Technical Information to Support Review of Technical Specification Improvement Program (TSIP) Submittals San Onofre Nuclear Generating Station Units 2 and 3
Reference:
Amendment Applications No.137 and No.121 (PCN 299) for San Onofre Unit 2 and Unit 3, respectively i
As requested by Mr. T. R. Tjader, Review Coordinator for the San Onofre Technical Specification Improvement Program (TSIP) submittal, enclosed are copies of:
e The Pressure / Temperature (P/T) Limits calculation (M-0011-063, Revision 1,
" Revised P-T Curves for 20EFPY, SONGS 2 & 3"), and e PLG-0575 (" Methodology for Developing Risk-Based Surveillance Programs for Safety-Related Equipment at San Onofre Nuclear Generating Station Units 2 and 3").
J The calculation M-0011-063, evision 1, " Revised P-T curves for 20EFPY, SONGS 2 & 3," supersedes the previously submitted calculaton M-0011-063, " Revised i
P-T curves for 8FFPY, SONGS 2 & 3."
Both calculations use the same methodology for calculating P-T limits.
1 These documents were requested to facilitate the review of the San Onofre 2 & 3 TSIP submittal, (PCN 299).
Should you have any comments or questions concerning this submittal, please call Brian Woods at (714) 454-4555.
Sincerely, athh0 1
Enclosures 1
...i 00 9406290105 940624
\\g PDR ADOCK 05000361 p
^1
Document Control Desk cc:
L. J. Callan, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 i
M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 C. I. Grimes, Chief, NRC Technical Specifications Branch i
M. W. Weston, NRC Techical Specifications Branch T. R. Tjader, Review Coordinator - CE0G STS, NRC Technical Specifications Branch H. Kocol, California Department of Health Services e