ML20070A543
| ML20070A543 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 12/31/1990 |
| From: | Cottle W, Daughtery L ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GNRO-91-00010, GNRO-91-10, NUDOCS 9101230193 | |
| Download: ML20070A543 (5) | |
Text
O
- - Ent:rgy fatyy=aawiac-i Operations
> -m u m
'fe un.n' u%
W. T. Cottle I
.) V i
\\4 v.
syM th r vu./hser:
i January-15, 1991 U.S. Nuclear Regulatory Comission Mail Station P1-137 i
Washington, D.C.
20555 l
Attention:
Document Control Desk
Subject:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operati.ig Report GNRO-91/00010-Gentlemen:
In accordance with the requirement of Technical Specification 6.9.1.10, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit I for December 1990 (attachment).
If you have any questions or require additional information, please contact this office.
Yours truly, co r Cmst-WTC/RSJ/cg attachments: 1.
Operating Status 2.
Average Daily Power Level 3.
Unit-Shutdowns.and Power Reductions cci (Seenextpage) n n n tdOQPpEC/SCMPFLR
/
9101230193 901231 5
PDR-05000416
'b-.-
ADOCK _, _PDR _.
r 15, 1991 January /00010 GNRO-91 Page 2 of 3 i
Mr.D.C.Hintz(w/a)))
ces' Mr. R. B. McGehee (w/a Mr. N. S. Reynolds (w/a Mr. H. L. Thomas (w/o)
Mr.J.L.Mathis(w/a) i Mr.StewartD.Ebneter(w/a)
Regional Administrator.
1 i
U.S.. Nuclear Regulatory Comission Region II 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 l
Mr. L. L. Kintner, Project Manager (w/a)
'j Office of-Nuclear Reactor Regulation i
V.S.. Nuclear Regulatory Comission.
_j Mail Stop 11D21 1
, Washington, D.C.-:20555 1
.j i
i i
q
.l
-1
.i M00PDEC/SCMPFLR l
L
Att'achment to GNRO-90/00010 i
Page 1 i
DOCKET NO.
50-416
~~
DATE 01/10/91 COMPLETED BY L. F. Daughtery TELEPHONE (601)437-2334 i
OPERATING STATUS.
1.
Unit Name: GGNS UNIT 1-Notes:
- 2.
Reporting-Period:
December 1990-13.- Licensed Thermal Power piWTJ~ T172.5 MWE' 3833 MWT i;
v4.
Nameplate Rating (Gross MWE):
5.
Design Electrical Rating (Not MWe): 1250 MWE 6.
Maximum Dependable Capacity (Gross MWe): 1190 MWE 7.: Maximum-Dependable Capacity (Net MWe)(:
1142 MWE 8.
If Changes Occur in Capacity Ratings Items Number 3 Through 7) Since Last Report.-
-Give Ressons:
N/A
~
= 9.
Power Level To Which Restricted, In.Any.(Net MWe):
N/A
- 10. Reasons.For-Restrictions, If Any:
N/A This Month Yr to-Date-Cumulative 744 8760-54,322
- 11. Hours In Reporting Period.
436.3 6,911.3:
41,966.8 12.; Number of Hours Reactor Was Critical 13.. Reactor Reserve Shutdown Hours 0
0 0
,14. Hours Generator 0;<-Line 362-6.765.9 40,013.7 15.-Unit Reserve Shutdown Hours-0 0
0-
-16'.LGross Thermal Energy-Generated (MWH) 1,262,756 24,342,493 135 908 0/T n
- 17. Gross Electrical Energy Generated (MWH' 407,578 7,739,554
~4, 3,514
.18. Net Elfctrical Energy Generated (MWH) 385,733 7,404,006 41,141,999
~
- 19. Unit. Service Factor 48.7 77.2
-76.6
- 20." Unit Availability Factor 48.7 77.2 76.6
>21. Unit Capacity Factor-(Usin0 HOC Net) 45.4
-74.0 72.1 L22.uunit' Capacity Factor:(Using DER Net) 41.57 67 3 -
65.2-J23.. Unit Forced-Outage Rate 51.3; 9.0 6.4 124.ShutdownsScheduledOverNext6 Months-(Type,Date,andDurationof.Each):-
25.V Shut Down At Erri ofleport. Period.
Estimated Date of-Startup:'
NA 1
l 26.? Units In. Test Status-(Prior to Ccmmercial Operation).
Forecast Achieved o
L INITIAL CRITICALITY 08/18/82' INITIAL ELECTRICITY
.10/20/84 l
~ COMMERCIAL OPERATION
'07/01/85~
M00P9EC/SCHPFLR l
~ +
Attachment to GNRO-90/00010 Page 2 1
j DOCKET NO, 50-416 UNIT 1
DATE 01/10/91 COMPLETED BY L. F. Daughtery TELEPHONE 601-437-2334 MONTH-December 1990 i
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
.1 1198 17 1045.7 2
184.7 18 957.6 3
1196.2 19 0
4-1216.0 20 0
5 1215.5 21 0
6 1211.5 22 0
7 1180.7 23 0
o 1213.7 24 0
1210.0_
25 0
10 519.1 26 0
11-0 27 0
12 0
28 0
13 12.3-29 0
14 652.1 30 0
I 15
'1082.3 31 263.9 16 899.5 i
M00PDEC/SCMPFLR
- Attachment to GNRO-90/00010?
Page'3L UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET No. 416
-UNIT NAME 1
DATE
..01/10/91 COMPLETED BY L. F. Daughtery-REPORT MONTH December'1990..
TELEPHONE-601-437-2334.
l l
l l-l
.l: Method of l Licensee
.l l.
l-Cause & Corrective
-l l No. l. Date l' Type l Duration l Reason.l Shutting.Downl Event l System l Component l Action.To l
i l
l-(1) l Hours _-l (2).:
l
' Reactor l Report #.1 Code-l' Code.
l Prevent Recurrence l
4 l
l
. I i
l'
'l:
.(3) 11
- l (4) l (5) l l
l_
- l i
l' I
I
'l 190-12/10/90l F-81.50 l
.A 3
l 90-028 LD 1
NA:
l Reactor scram due to failed l
l012 l
l-l
'l
,1 l
l l
linstrument air system piping joint l.
. l l
l l
l l
l I-l
.l(defective workmanship).-
-l_
l 1
1 I
-I-I l'
I I
1 i
'l :
l l90-l12/18/90l F
l 300.50 l
-Ar l
3 l 90-029 l
SJ.
l LC lLo-level reactor scram during.
l l
l013 l
l
.l.
l
.l l
l l plant-shutdown to investigate 'B'-l.
l l
j.
l-j.
]
l l
lrecirc pump vibrations.... Scram wasl l
l l
l l
l l
l ldue to feedwater control l.
.l l-l
]
l circuitry.
-l l
l i.
'l l
1 i
i 1.
I i
.I I
I l'
I I
I I
1 l
1 l
I i
i l
- l l
1 l
l
'l
.I
'l l
l l
l l-I l-1 I
I I
-1 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions 5: Scheduled A-Equipment Failure 1-Manual for Preparation 'of Data (Explain)..
2-Manual Scram Entry Sheets for Licensee B-Maintenance or Test -
3-Automatic-Scram Event Report-(LER)-
-C-Refueling 4-Continued File (NURECr0161)'
'D-Regulatory Restrktion -
5-Reduced load E-Operator Trainirsg &'.
6-Other.
Licensing Examiretion.
- F-Administrative.
-5 G-Operational Error Exhibit 1-Same Source.
.(Explain):
H-Other-(Explain)L l
M00PDEC/SCMPFLR h.g
..m..
+L,.
.-~...-.LE=
'