Monthly Operating Rept for Dec 1990 for Wolf Creek Generating Station
ML20070A569
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/31/1990
From: Bailey J, Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NO-91-0011, NO-91-11, NUDOCS 9101230217
Download: ML20070A569 (7)


Text

. ,' ,

l W%F CREEK NUCLEAR OPERATING CORPORATION l

John A Bailey w.m a n.,c w op.,.i.on.

January 15. 1991 NO 91-0011 U. S. Nucleat Regulatory Commission ATTH: Document Control Desk Mail Station F1-137 Washington, D. C.- 20555

Subject:

Docket No. 50 482: December 1990 Monthly Operating Report Gentlemen:-

Attached is the Decembst, 1990. Monthly Operating Report for Wolf Creek Generating Station. This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.

Very truly yours, p (* ,

John A. Bailey Vice President

' Nuclear Operations JAB /aem Attachment cci A. T. Howell (NRC). w/a R. D. Martin (NRC), w/a D. V. Pickett (NRC), w/a M.'E. Skov (NRC) w/a 9101230217 901231 (DR ADOCT 0500043: FDR RO= Box 411/ Burkngton, KS 66839 / Phone. (316) 364-6831 4 .

Attachment to NO 91-0011 HOLP OtEIE 11UCLIW1 OPDWTitG (XIIIGWTIOt1 WOLP OtEEK GDIDWTIlU STRI'IOt1 N0fflitLY OPDW1'DG RIGOtT Hatf111: thetrinr YIWl 1990 1

Docket Ib. : 50-402 Facility Operating Idconno Ib.: 187-42 Report 1b. 70 Ptiqntui by:

Merlin G. Williana l

  • Atto'hment c to NO 91-0011 Sit 4WlY

'lhe follwing report. liighlights the oterating experience of ib1f Crook Generating Stat. ion for the nunth of Iturrinr,1990. 4his report is Ining providal mruuant I to 'Ibchnical Specification 6.9.1.0.

I. St19WlY OF OPIstATI!C EXPERIl2CE Tho unit operatnd at or noar full pcMur throughout the nonth of Docminr, 1990 with the exception of cmnenament of a plant shutdown at 4:00 pn on Ibcmber 23 as a result of the froozing of a recirculation line serving both Safoty Injoction (SI) pumps. The plant shutdwn was requixo1 by Soction 3.0.3 of the Walf Creek 7bchnical Specifications. The SI purps were returned to an operablo condition before a total plant shutdown was attained, with reactor pcwor dropping to a 1cw of 65% during the event and i

full power balng restored at 10:35 pu the sann day.

II. !%JOR SAFETI'Y RFIATED MAINIDWCE ICI'IVITJES 16 najor safety 191ated nnintenance activitics woro perfonmd in Docmber.

l l

[

l l

l ib1f Creek Generating Station l tenthly-Operating Itoport ILuxntnr 1990 Pago l of 5 l

l

Att'achment to NO 91-0011 OPFJMT1tG IRTA REIORT DOC'10?P 10. ,_50-482 VOIE OtEI2; GI2112tATIIG STATIO4 VOIE CREI2( liUCIEAft OPf3MTI!G COIIIORATIQ1 LWTE 01-01-91 EI4PIJ11'ED BY li. Williams TELEPil0NE 316-364-883J OPETtATIlG f71'A'IUS

1. Reparting Pericd: twxsnhor, 1990 Gross Iburn in Reparting Ibriod: 744
2. Curruntly Authorizod Pcwar Invol(IMt): 34U, thx. Dapand. Capacity (Mh-!)3t):_1135 Danign Electrical Rating (Mhb-14at): 1170
3. Pcuor Invol to Witich Restricted (If Any)(Mb-!&at): N/A
4. Roanons for restriction (If Any): N/A l 'Ihis Month Yr. to Dato Cumulativo l

S. Ihnnbar of Ilours Reactor was Critical 744,0 7,096. E 37,395.5

6. Reactor Reservo Shutdown Iburn 0.0 0.0 339.8
7. Ilours Generator on Idno 744,0 7,036.7 36,823.8 O. Unit Ileservo Shutdown Iburs 0.0 0.0 0.0
9. Gross 'Ihornnl Energy Gancrated, (IMI) 2,531,359 23,587,770 122,065,025
10. Gross Electrical Energy Generated (!MI) 894,599 8,235,822 42,514,769
11. 14at Electrical Energy Generated (IMI) 858,650. 7,874,487 40,596,858 I
12. Reactor Servico Factor ,,, 100.0 81.0 80.1
13. Reactor Availability Factor 100.0 81.0 80.8
14. Unit Servico Factor 100.0 80.3 78.8
15. Unit Availability Factor 100.0 80.3 _ 78.8
16. Unit Capacity Factor (Using MDC) 101.7,_ 79.2 76.9

,_ 17. Unit Capacity Factor (Using Design IMo) 98.6 ,_ 76.8 74.3_

L

18. Uni.t Forced Outage Itato 0.0 1.7 _

4.1

! 19. Shutdcuns Schedulod Over thxt 6 Manths (Type, nato, arxi Duratian of each): N/A

20. If Shut Down at Ihd of Report Porlod, Eatinuted Date of Startup: N/A Wolf Creek Generating Station Monthly Operating Report December 1990 Page 2 of 5

l Attachment to NO 91-0011 i

AVDIN38 IR1LY INIT IOG3t IJWil DCCl;171' !D. 50-482 VOIE CllEf2C GDJUMTI!G STATIQ1 VOIE CREE 2; 1ACLIW1 OPD&TI!G CGtIGINI'IQ1 IWPE 01-01-91 i

034PIEI'ID DY li. Williann T12231 DIE 316-364-8831 i

imI1L ticotbrir, 1990 DAY AVDt/GE IRILY 1U101 ILVIL IWY AV17ttGE LWILY 10101 ILVEL (IM>-lbt) (1490-!bt) 1 1156 __ 17 1154 2 1156 18 _ 1152 3 1156 19 1156 4 1356 20 1154 l 5 1156 21 1156

6 1156 22 1154 l 7 1156 23 1104 l

! 8 1157 24 1155 9 1157 25 1156 10 1155 26 1157 11 1156 27 1157 13 1153 28 1157 13 1156 29 1157 14 1157 30 1156 15 _ 1157 ,, 31 1156 l '16 1

1157 W31f Creek Generating Station bbnthly Operating Report Decantnr 1990 Page 3 of 5

Attachment to NO 91-0011 .

UNIT SHUTDOW AND POWER REDUCTIONS -' i DOCRET NO. 50 f82 WOLF CREEK GENERATING STATICN WOLF CPIEK NUCLEAR CPERATING CORPCPJ. TION .

DATE 01-01-91 COMPLETED BY M. Williars REPORT MONTH December. 1990 TriveEONE 316-364-6S31 I TYPE METHODS SuunING F: FORCED DURATION REASON DOWN TEE PIACTOR CCERECTIVE ACTIONS / COMMENTS No Date S: SCHEDULED (EOURS) (1) OR REDUCING POWER (2) -

i I

EID9 FART: The unit operated at or near 100% power throughout the month of December with no power reductions that resulted in a greater than 20% reduction in average daily pcwer level as compared to the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXMiINATION (2) P2TEOD: 1. MA';UAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2. MAI.TAL SCEMi C: REFUELING G: GPERATIONAL ERROR (EXPLAIN) 3. AUICMATIC SCPM i D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4. CCNTII,v:.a
5. PIDUCED LOAD
9. OTHER i

Wolf Creek Generating Statien Monthly Operating Report

Dece=ber 1990 Page 4 of 5

\

i-

. . . . - - - - . . - _ ~ _ - - . - . - - . - - . - . _ . . - _ - - ~ - - - . . . . . - .

I' ,

At'tachment to NO 91-0011 l

.i .

WJIE OtF3X !!lCLEWt OPERATl!G CGllGRTIGJ WJIE CRF:F:K GENFRATI!G F71WI104 Uti1T 10.1

140tfl11 Dxrmher, 1990 SlFFJulY OP OPFRATIPG FNPFRIF2CE List <xi bolcw in chrono 1cxjical soquence is a sununry of operating exparlancos for this nonth which regulrod load miuction or resultod in significant non-1cnd related incidents.

.DATE TI!4F; FNF27P DIconbar 1,1990 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 100% pcwr.

Docanbar 23, 1990 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> !btification of Unusual Event (11UE) declared as tho Safety Injoction (SI) laps are declami inopozable as a result of freezing of the pumpa' recirculation line. Walf Creek 'Ibchnical Specification 3.0.3 entered.

1603 hours0.0186 days <br />0.445 hours <br />0.00265 weeks <br />6.099415e-4 months <br /> Unit at 100% gwr, v. nuanced plant shutdcun.

1705 hours0.0197 days <br />0.474 hours <br />0.00282 weeks <br />6.487525e-4 months <br /> Unit at 65% power.

1735 hours0.0201 days <br />0.482 hours <br />0.00287 weeks <br />6.601675e-4 months <br /> SI Pump *A" operability restored, exited 3.0.3, i tenninated NUE.

1745 hours0.0202 days <br />0.485 hours <br />0.00289 weeks <br />6.639725e-4 months <br /> Unginning power increase to 100%.

2235 hours0.0259 days <br />0.621 hours <br />0.0037 weeks <br />8.504175e-4 months <br /> Unit at 100% pur.

i Docatnr 31, 1990 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit at 100% g w r.

W31f Crook Generating Station Manthly operating Rcport Decantur 1990 Page 5 of 5