Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078R512 + (05:10:54, 15 December 2024)
- ML20078R508 + (05:10:55, 15 December 2024)
- ML20078R504 + (05:10:55, 15 December 2024)
- ML20078R503 + (05:10:56, 15 December 2024)
- ML20078R496 + (05:10:57, 15 December 2024)
- ML20078R502 + (05:10:57, 15 December 2024)
- ML20078R476 + (05:10:58, 15 December 2024)
- ML20078R480 + (05:10:58, 15 December 2024)
- ML20078R464 + (05:10:59, 15 December 2024)
- ML20078R471 + (05:10:59, 15 December 2024)
- ML20078R459 + (05:11:00, 15 December 2024)
- ML20078R452 + (05:11:01, 15 December 2024)
- ML20078R455 + (05:11:01, 15 December 2024)
- ML20078R442 + (05:11:02, 15 December 2024)
- 05000313/LER-1983-024-03, /03L-0:on 830926,control Rod Assembly 10 Found Misaligned from Group Average by Greater than 9 Inches. Caused by Pole Slippage on Out Command.Control Rod Drive Malfunction Procedure Will Be Revised + (05:11:04, 15 December 2024)
- ML20078R438 + (05:11:05, 15 December 2024)
- RBG-16-293, Interim Deficiency Rept DR-123 Re Mccrosky Sheet Metal HVAC Ductwork Fabrication.Investigation Incomplete. Next Rept Will Be Submitted by 840103 + (05:11:05, 15 December 2024)
- ML20078R408 + (05:11:06, 15 December 2024)
- ML20078R421 + (05:11:06, 15 December 2024)
- ML20078R405 + (05:11:07, 15 December 2024)
- RBG-16-280, Interim Deficiency Rept DR-89.Investigation Re Residual Total Elongation Primary knife-type Disconnect Used on Standby Diesel Generator Incomplete.Interim or Final Status Rept Expected by 831215 + (05:11:07, 15 December 2024)
- ML20078R400 + (05:11:08, 15 December 2024)
- ML20078R397 + (05:11:09, 15 December 2024)
- ML20078R398 + (05:11:09, 15 December 2024)
- BVY-94-127, Transmits Addl Drawings Re ISI Program Review + (05:11:10, 15 December 2024)
- ML20078R357 + (05:11:10, 15 December 2024)
- ML20078R337 + (05:11:11, 15 December 2024)
- ML20078R329 + (05:11:11, 15 December 2024)
- B14203, Proposed Tech Specs Re Flood Protection Consistent at Plant for Each Unit + (05:11:12, 15 December 2024)
- ML20078R327 + (05:11:12, 15 December 2024)
- ML20078R299 + (05:11:13, 15 December 2024)
- ML20078R276 + (05:11:14, 15 December 2024)
- ML20078R277 + (05:11:14, 15 December 2024)
- ML20078R257 + (05:11:15, 15 December 2024)
- ML20078R272 + (05:11:15, 15 December 2024)
- ML20078R240 + (05:11:16, 15 December 2024)
- PY-CEI-NRR-1892, Application for Amend to License NPF-58,proposing Addition of Alternative to Requirement for Operations Manager to Obtain Senior Reactor Operator License by Aug 1995 + (05:11:16, 15 December 2024)
- ML20078R233 + (05:11:18, 15 December 2024)
- ML20078R235 + (05:11:18, 15 December 2024)
- ML20078R222 + (05:11:20, 15 December 2024)
- ML20078R229 + (05:11:20, 15 December 2024)
- ML20078R184 + (05:11:21, 15 December 2024)
- ML20078R173 + (05:11:22, 15 December 2024)
- ML20078R145 + (05:11:26, 15 December 2024)
- ML20078R160 + (05:11:26, 15 December 2024)
- ML20078R125 + (05:11:27, 15 December 2024)
- ML20078R143 + (05:11:27, 15 December 2024)
- ML20078R116 + (05:11:28, 15 December 2024)
- ML20078R093 + (05:11:29, 15 December 2024)
- ML20078R114 + (05:11:29, 15 December 2024)
- 3F0295-05, Monthly Operating Rept for Jan 1995 for Crystal River Unit 3 + (05:11:30, 15 December 2024)
- ML20078R092 + (05:11:30, 15 December 2024)