ML20078R093

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1995 for Wolf Creek Generating Station
ML20078R093
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/31/1995
From: Maynard O
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
WO-95-0029, WO-95-29, NUDOCS 9502220209
Download: ML20078R093 (7)


Text

1 s b W@ NUCLEAR LF CREEK OPERATING l  ;

I Otto L Maynard Vece President Plant Operations February 14, 1995 i

WO 95-0029 '

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, D. C. 20555 i

Subject:

Docket No. 50-482: January, 1995, Monthly Operating Report Gentlemen:

Attached is the Jantary, 1995, Monthly Operating Report for Wolf Creek Generating Station. This sabmittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.

Very truly yours,

,4 .

Otto L. Maynard OLM/jad  ;

e Attachment i i

cc: L. J. Callan (NRC), w/a I D. D. Chamberlain (NRC), w/a D. N. Graves (NRC), w/a J. F. Ringwald (NRC), w/a J. C. Stone (NRC), w/a e , :' *. " ,*~L'

  • 6..

y,.

O Box 411/ Barhngton,

1 1185 17 1186 2 1186 18 1186 3 1185 19 1183 4 1186 20 1178 5 1186 21 1186 6 1178 22 1186 7 1185 23 1167 8 1186 24 1187 9 1185 25 1187 10 1185 26 1177 11 1186 27 1183 12 1186 28 1186 13 1180 29 1186 14 1186 30 1186 15 1188 31 1187 16 1187 1

l Wolf Creek Generating Station Monthly Operating Report January, 1995 Page 3 of 5

1 Attachment to WO 95-0029 .

UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO. 50-492 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 2-07-95 TELEPHONE 316-364-8831 Tfpe METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS No Date S: SCHEDULED (Hours) (1) OR REDUCING POWER (2)

None

SUMMARY

The unit operated at or near 100% for the month of January, 1995.

1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD: 1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2. MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4. CONTINUED
5. REDUCED LOAD
9. OTHER Wolf Creek Generating Station Monthly Operating Report January, 1995 Page 4 of 5

At,te..chnient to WO 95-0029 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION UNIT NO. 1 MONTH January, 1995

SUMMARY

OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reduction or resulted in significant non-load related incidents.

DATE TIME EVENT None None None t

i Wolf Creek Generating Station Monthly Operating Report January, 1995 Page 5 of 5