Monthly Operating Rept for Nov 1994 for Oyster Creek Npp.W/
ML20078R276
Person / Time
Site: Oyster Creek
Issue date: 11/30/1994
From: J. J. Barton, Edelmann P
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C321-94-2304, NUDOCS 9412270001
Download: ML20078R276 (7)


Text

.

f.

GPU Nucteer Corporation

= Nuclear

en:r **

o Forked River. New Jersey M731-0388 609 971-4000 Wnter's Direct Dial Number:

C321-94-2304 December 13, 1994 U.S. Nuclear Regulatory Commission ATrN: Document Control Desk Washingtoa, D.C. 20555

Dear Sir:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Monthly Operating Report - November,1994 In accordance with the Oyster Cmek Nuclear Generating Station Operating License No.

DPR-16, Appendix A, Section 6.9.1.C, enclosed are two (2) copies of the Monthly Operating Data (gray book information) for the Oyster Creek Nuclear Generating Station.

If you should have any questions, please contact Brenda DeMerchant, Oyster Creek Licensing Engineer at (609) 971-4642.

Sincerel 1L aiton i

resident and Director Oyster Creek JJB/BDEM: jc Attachment cc:

Administrator, Region 1 Senior NRC Resident Inspector Oyster Cmek NRC Project Manager (C:\\wp51\\demercha\\MOR RPT.NOV) 9412270001 941130 4

PDR ADOCK 05000219 0 19

"" """ ' ' '" ' 'R pga gu s

J.

SUMMARY

NOVEMBER,1994 Oyster Creek continued the 15th refueling outage dunng the entire month of November.

1 1

MONTHLY OPERATING REPORT LICENSEE EVENT RF10RT i

l The following Licensee Event Report was submitted during the month of November,1994:

LER 94-019 On October 19, 1994, a Station Blackout (SBO) power supply failed to start during a functional test. Subsequent investigation determined a control power modification made in May,1994 without GPUN review prevented the unit from starting in a loss of power mode.

Interniption of AC power to a trip circuit caused a unit trip. An uninterruptible power supply (UPS) was installed to maintain the trip circuit energized. The agreement betwegn GPUN and the operator of the power supply (JCP&L)was revised to include review and testing of unit modifications.

9 i

o l

e Oyster Creek Station #1 I

Docket No. 50-219 l

REFUELING INFORMATION - NOVEMBER, 1994 Name of Facility: Oyster Creek Station #1 Scheduled date for next refueling shutdown:

September, 1996 Scheduled date for restart following refueling: Currently projected for November, 1996 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

1 No Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

1.

General Electric Fuel Assemblies - Fuel design and performance analysis methods have been approved by the NRC.

The number of fuel assemblies (a) in the core 560

=

(b) in the spent fuel storage pool-2048

=

(c) in dry storage 24

=

The present licensed spent fuel pool ' storage capacity and the size of any increase in licensed storage t :p J ty that has been requested or is planned, in number of fuel assemblies:

Present Licensed Capacity:

2600 Planned Increase in Licensed Storage Capacity:

45 The actual fuel storage capacity of the spent fuel pool is 2645 assemblies.

The projected date of the last refueling that can be discharged to the spent fuel pool asscming the present licensed capacity:

Based on a reload of 172 bundles, full core discharge capacity to the spent fuel pool will be lost after the 1994 refueling outage.

I n

w---

e e

~&e,

-,--,,e,-

" i AVERAGE DAILY POWER LEVEL NET MWe DOCKET #.

.50-219 UNIT.

. OYSTER CREEK #1 REPORT DATE.

12-05-94 COMPILED BY

. PAUL G.

EDELMANN TELEPHONE #

.609-971-4097 MONTH:

NOVEMBER, 1994 116Y M

DAY g

1.

0 16.

0 2.

0 17.

0 3.

0 18.

0

.4.

0 19.

0 5.

0 20.

0 6.

0 21.

0 7.

0 22.

O I

8.

0 23.

0 l

9.

0 24.

0 l

I 10.

0 25.

0 11.

0 26.

0 12.

0 27.

0 13.

0 28.

0 l

14.

0 29.

0

)

l 15.

0 30.

O i

J l

.. e e

OPERATING DATA REPORT OPERATING STATUS

'1.

DOCKET:

50-219

2. REPORTING PERIOD:

11/94

{

3.

UTILITY CONTACT:

PAUL G. EDELMANN (609-971-4097) 4.

LICENSED THERMAL POWER (MWt):

1930

5. NAMEPLATE RATING (GROSS MWe):

687.5 x 0.8 = 550

'6. DESIGN ELECTRICAL RATING (NET MWe):

650

7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

632

8. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

610 9.

IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

NONE

10. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NONE i

11. REASON FOR RESTRICTION, IF ANY:

NONE MONTH Y.E. AR CUMULATTyg

12. REPORT PERIOD HOURS 720.0 8016.0 218616.0
13. HOURS RX CRITICAL 0.0 5776.0 145375.0
14. RX RESERVE SHUTDOWN HRS 0.0 0.0 918.2
15. HRS GENERATOR ON-LINE O.0 5717.4 141929.1
16. UT RESERVE SHTDWN HRS 0.0 0.0 0.0
17. GROSS THERM ENERGY (MWH) 0 10785232 243898629
18. GROSS ELEC ENERGY (MWH) 0 3571502 81815816
19. NET ELEC ENERGY (M.GI)

-3537 3427270 78474984

20. UT SERVICE FACTOR 0.0 71.3 64.9
21. UT AVAIL FACTOR O.0 71.3 64.9
22. UT CAP FACTOR (MDC NET) 0.0 70.1 58.6
23. UT CAP FACTOR (DER NET) 0.0 65.8 55.2
24. UT FORCED OUTAGE RATE 0.0 5.5 10.3
25. FORCED OUTAGE HRS 0.0 332.5 16289.8
26. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION)r NONE
27. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:

12 DEC 94

i!f I

R 5

1 S

1 T

f N

o t

E e

n r

o Eo i

VC t

I/

a TS u.

CN ne EO i g RI t a

~

RT nt OC ou CA CO 4

9 9

1 R

n GO) a N

2 k

m IR(

e 2

e 1

E TO r

TTR C

r 8

UCE e M 1

HAW 9

r b 8

SEO 1

1 e

m d 4

RP 2

t e

i F

s c v 1

OEG 0

y e

a 7

HN 5

O D D 9

DTI O

C HNU TWD EOE S :

MDR T

OE E

NM

  • O DN A

TN TH E

LP m)

KTEPE an

)

CI TML 1

ri ONAOE mca

(

S DUDCT aSl N

N e

r p

O O

ccm S

SiE I

A t(

T E

Dl1 n CU R

O a = er D

H u e e E

T n~

th R

E a-ut MMP AO e

8 R

EW

)

O 21234 P

(

D N

N A

O )s I

r 0

c 5

T u 2

3 A o 7

w R h i

U m

D(

ea

)

t x

n u

r E

i S

a e

l T

i p

I L

z N

Z U

(

g r

n o

i r) nern ivEi ai a

rtll d

E e

T aaprnx P

l S

rt oE Y d u T ed osi(

ti t c e rL anar ri r e oc FS e meh pd pt OAOO FS ef gh

)

n 6

9 i

9 E

0 a

9 T

9 l

1 A

0 p

n D

4 x

o r

9 E

i e

( t t

b s

c m

ee i

e rT r

v u

t o

l r s

N i o e

a R

F ec y

t ng r nano n

enit i

mel a m

o 7

N pt el u

N O inuu r

S uif g YA qae e T

RE

EMRR, R

A R O

t P

e). e..

P E

U1 ab cd R

S(

s

?

L 4

l 4

5' a i i1j1,.

.