Application for Amend to License DPR-65,revising LCO 3.7.5.1.b.3 & 3.7.5.1.b.4 of Plant,Unit 2 TS by Changing Elevation That Average Wind Speed & Average Wind Direction Measured
ML20078R299
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/16/1994
From: Opeka J
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
Shared Package
ML20078R305 List:
References
B14203, NUDOCS 9412270011
Download: ML20078R299 (7)


Text

_ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _

Northeast ' i *d"" 8""' 8"'", m, 37 l- Utilities System uth-t uuhee. sne. comp.oy

[ P.O. Box 270 Itartford, CT 06141-0270 (203) 665-5000 i

December 16, 1994 Docket No. 50-336 B14203 i

Ret 10CFR50.90 1 U.S. Nuclear Regulatory Commission Attantion: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specifications service Water Pn=n Flood Protection Pursuant to 10CFR50.90 Northeast Nuclear Energy company (NNECO) I hereby proposes to amend its Operating License No. DPR-65 by )

incorporating the attached proposed changes into the Technical l Specifications of Millstone Unit No. 2. The principal purpose of '

this proposed license amendment is to revise the Millstone Unit l No. 2 Technical Specifications, so that the operator actions l regarding flood protection are consistent for each of the units j at the Millstone Nuclear Power Station. Specifically, NNECO l proposes to revise Limiting Conditions for operation (LCOs) l 3.7.5.1.b.3 and 3.7.5.1.b.4 of the Millstone Unit No. 2 Technical Specifications by changing the elevation that the average wind speed and average wind direction are measured. Also, NNECO proposes to corr 2ct a typographical error on Table 3.3-8 of the Millstone Unit No. 2 Technical Specifications. i These prope, sed changes are discussed in detail below. The marked-up technical specification pages are provided in Attachment 1, and the tetyped technical specification pages are provided in Attachment 2.

Background

The Millstone Nuclear Power Station meteorological program meets the requirements of NRC Regulatory Guide (RG) 1.23 (originally issued as safety Guide 23). This RG requires wind conditions to be monitored at 10 meters e.bove grade (approximately 33 feet) and at elevations where potentially radioactive releases could occur.

Wind speed and direction measurements are currently monitored at four elevations above the meteorological tower base. These elevations are 33 feet, 142 feet, 374 feet, and 447 feet.

Elevation 142 feet approximates the plant vent heights for both Millstone Unit Nos. 2 and 3. Elevation 374 feet corresponds to the height of the Millstonn Unit No. 1 stack.

9412270011 941216 PDR ADOCK 05000336 P PDR )

00422 RW. l 94 i l

h......,.

93CO3 ._

4 e

U.S. Nuclear Regulatory Commission i B14203/Page 2 December 16, 1994 Millstone Nuclear Power Station operating and emergency plan ,

procedures for all three units require wind data to be taken from the elevation 142-foot . sensors to determine actions required to '

preclude flood damage during severe weather conditions. The Millstone Unit No. 2 service water pump motors are normally protected against water damage up to an elevation of 22 feet  !

(plant grade level) . If the water level is exceeding plant grade  !

level, or if a severe storm is approaching the plant site, one  !

service water pump motor will be protected against flooding to a  ;

minimum elevation of 28 feet to ensure that this pump will l continue to be capable of removing decay heat from the reactor.  !

In order to ensure operator accessibility to the intake structure, action to provide pump motor protection is initiated when the water level reaches plant grade level.

Descrintion of Pronosed Chances NNECO proposes to revise LCOs 3.7.5.1.b.3 and 3.7.5.1.b.4 of the Millstone Unit No. 2 Technical Specifications by changing the elevation that the average wind speed and average wind direction ,

are measured. Also, NNECO proposes to correct a typographical  !

error on Table 3.3-8 of the Millstone Unit No. 2 Technical Specification.

l Currently, the Millstone Unit No. 2 Technical Specifications require average wind speed and average wind direction measurements be taken at elevation 389 feet above Mean Sea Level (MSL) on the meteorological tower. An elevation of 389 feet MSL corresponds to the instruments located at an elevation of 374 feet above the base of the tower, because the base of the tower is located at an elevation of 15 feet MSL. NNECO is proposing to change the measurement location to an elevation of 142 feet above the base of the tower. The proposed changes will permit the operator actions regarding flood protection to be consistent for each of the units at the Millstone Nuclear Power Station.

NNECO proposes to correct a typographical error on Table 3.3-8 of the Millstone Unit No. 2 Technical Specification. This error was introduced in Amendment No. 45 to the Facility Operating License for Millstone Unit No. 2.m The nominal elevation for entry 3.b i of Table 3.3-8 should be 374 feet not 347 feet. l (1) R. W. Reid letter to Northeast Nuclear Energy Company, Amendment Nos. 56 and 45 to Provisional Operating License No. DPR-21 and Facility Operating License No. DPR-G5, i respectively, for the Millstone Nuclear Power Station, Unit Nos. 1 and 2, December 8, 1978.

U.S. Nuclear Regulatory Commission i B14203/Page 3  ;

December 16, 1994 i

Safety Assessment The proposed changes to LCOs 3.7.5.1.b.3 and 3.7.5.1.b.4 of the Millstone Unit No. 2 Technical Specifications will permit the use ,

of instruments at the 142-foot elevation to monitor wind speed  !

and wind direction in order to predict the potential of a major t storm and flooding. They do not involve any physical l modifications to structures, systems, or components. A review of .

Section 2.5.4.2.1 of the Millstone Unit No. 2 Final Safety i Analysis Report (FSAR), applicable procedures, and docketed <

correspondence did not identify any technical need to take wind data for Millstone Unit No. 2 from a different elevation than that used for Millstone Unit Nos. 1 and 3.

The change to lower the measurement of wind speed and wind i direction from the 374-foot elevation to the 142-foot elevation I is less conservative since wind speeds tend to be greater at i higher elevations. Hence, the frequency of a meteorological event which would trigger the required actions is being reduced.

However, NNECO's proposal to use the same trigger value of 60 miles per hour for wind speed is consistent with that used for each of the other Millstone units to take precautionary steps for a severe storm. Millstone Unit Nos. 1 and 3 use plant procedures  :

to trigger actions for flood protection based on storm wind speed l or forecasted storm track projection. i The proposed changes will permit the operator actions regarding flood protection to be consistent for each of the units at the Millstone Nuclear Power Station. The on-site meteorological program at Millstone Station meets the requirements of Regulatory Guide 1.23 (originally issued as Safety Guide 23). The Regulatory Guide requires wind conditions be monitored at 10 meters above grade (approximately 33 feet) and at elevations where potentially radioactive releases could occur. Currently, wind speed and direction measurements are monitored at four elevations above the meteorological tower base (33 feet, 142 feet, 374 feet, and 447 feet). The 142-foot elevation approximates the plant vent heights for both Millstone Unit Nos. ,

2 and 3. The 374-foot elevation corresponds to the height of the i Millstone Unit No. 1 stack.

In summary, the slight reduction in margin in measuring wind i speed and wind direction does not change the actions Millstone l Unit No. 2 would take for an approaching storm. Furthermore, the proposed change is consistent with the actions previously accepted by the NRC Staff for Millstone Unit Nos. 1 and 3.

i

~ e,-- -- w->e-- , -- - , - - , , - - + . . , ,

, , - n m -- ----------------------- - - - - - - - - - ~ - - -

n U.S. Nuclear Regulatory Commission B14203/Page 4 December 16, 1994 Significant Hazards Consideration NNECO has reviewed the proposed changes in accordance with 10CFR50.92, and has concluded that the changes do not involve a significant hazards consideration. The basis for this conclusion is that the three criteria of 10CFR50.92(c) are not compromised.

The proposed changes do not involve a significant hazards consideration because the changes would not:

1. Involve a significant increase in the probability or consequences of an accident previously analyzed.

NNECO is proposing to revise LCOs 3.7.5.1.b.3 and 3.7.5.1.b.4 and Table 3.3-8 of the Millstone Unit No. 2 Technical Specifications by changing the elevation that the average wind speed and average wind direction are measured and by correct:.ng a typographical error, respectively. The proposed changes have no effect on any of the accidents analyzed in Chapter 14 of the Millstone Unit No. 2 FSAR.

Site flooding is considered in Section 2.5.4.2.1 of the FSAR. Utilizing the wind speed indicator at the 142-foot elevation, in lieu of the indicator on the 374-foot elevation will not significantly change the ability of personnel to predict the potential for a major storm with flooding.

The proposed changes do not alter the intent of the surveillances, do not involve any physical changes to the plant, do not alter the way any structure, system, or component functions, and do not modify the mannar in which the plant is operated.

Based on the above, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously analyzed.

f-

2. Create the possibility of a new or differnnt kind of accident from any previously analyzed.

NNECO is proposing to revise LCOs 3.7.5.1.b.3 and 3.7.5.1.b.4 and Table 3.3-9 of the Millstone Unit No. 2 Technical Specifications by changing the elevation that the average wind speed and average wind direction are measured and by correcting a typographical error, respectively. The proposed changes do not alter the intent of the surveillances, do not involve any physical changes to the plant, do not alter the way any structure, system, or

r J

a ,

U.S. Nuclear Regulatory Commission '

B14203/Page 5 December 16, 1994 e

component functions, and do not modify the manner in which the plant is operated.

While the proposed changes to LCOs 3.7.5.1.b.3 and

- 3.7.5.1.b.4 do change the measurement location stipulated by the technical specifications, this change is insignificant.

Utilizing the wind speed indicator at the 142-foot elevation, in lieu of the indicator on the 374-foot elevation will not significantly change the ability of personnel to predict the potential for a major storm with floo, ding.

Based on the above, the proposed changes do not create the possibility of a new or different kind of accident from any previously analyzed.

3. Involve a significant reduction in a margin of safety.

NNECO is proposing to revise LCOs 3.7.5.1.b.3 and I 3.7.5.1.b.4 and Table 3.3-8 of the Millstone Unit No. 2 '

Technical specifications by changing the elevation that the )

average wind speed and average wind direction are measured  :

and by correcting a typographical error, respectively. The i proposed changes will have no impact on the physical (

protective boundaries (fuel matrix / cladding, reactor coolant  !

system pressure boundary, and containment). The proposed r changes do not alter the intent of the surveillances, do not  ;

involve any physical changes to the plant, do not alter the l vay any structure, system, or component functions, and do ,

not modify the manner in which the plant is operated. '

While the proposed changes to LCOs 3.7.5.1.b.3 and l 3.7.5.1.b.4 do change the manner in which potential flooding l is predicted, this change is insignificant. Utilizing the ,

wind speed and direction indicators at the 142-foot l elevation, in lieu of the indicr: ors at the 374-foot elevation will not significantly change the ability of personnel to predict the potential for a major storm with

, flooding.

Based on the above, the proposed changes do not involve a significant reduction in a margin of safety.

The Commission has provided guidance concerning the application of standards in 10CFR50.92 by providing certain examples (March 6, 1986, 51 FR 7751) of amendments that are considered not likely to involve a significant hazards consideration. While the proposed changes to LCOs 3.7.5.1.b.3 and 3.7.5.1.b.4 are not l

l

~ ,__._ __ ,_ __

U.S. Nuclear Regulatory Commission B14203/Page 6 December 16, 1994 i

l enveloped by any of the examples, correcting the typographical error in Table 3.3-8 is enveloped by . example (i), a purely j administrative change to technical specifications. The proposed  !

changes to LCOs 3.7.5.1.b.3 and 3.7.5.1.b.4 result in an l insignificant change to the manner in which potential flooding is predicted. Utilizing the wind speed and direction indicators at the 142-foot elevation, in lieu of the indicators at the 374-foot elevation will not significantly change the ability of personnel to predict the potential for a major storm with flooding.

These proposed changes do not constitute a significant hazards consideration, because they do not alter the intent of the LCo, do not involve any physical changes to the plant, do not alter ,

the way any structure, system, or component functions, and do not modify the manner in which the plant is operated.

Environmental Consideration  ;

NNECO has reviewed the proposed license amendment against the ,

criteria of 10CFR51.22 for environmental considerations. The  !

proposed changes do not involve a significant hazards  :

consideration, do not increase the types and amounts of effluents  !

that may be released offsite, nor significantly increase .!

individual or cumulative occupational radiation exposures. Based on the foregoing, NNECO concludes that the proposed changes meet i the criteria delineated in 10CFR51. 22 (c) (9) for a categorical  ;

exclusion from the requirements for an environmental impact  !

statement. ,

i Nuclear Review Board Review The Millstone Unit No. 2 Nuclear Review Board has reviewed the proposed amendment and has concurred with the above determination.

Pronosed Schedule for License Amend ==nt Issuance l This request is not necessary for continued plant operation and i as such no specific schedule for approval and issuance is requested. However, it is appropriate that this change be ,

implemented within thirty days of issuance of the license '

amendment.

l In accordance with 10CFRSO.91(b), we are providing the State of Connecticut with a copy of this proposed amendment. ,

l

U.S. Nuclear Regulatory Commission B14203/Page 7 December 16, 1994 Should the NRC Staff have any questions regarding this submittal, please contact us.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY i

}$

J. F. OpeWa Q Executive Vice-President cc: T. T. Martin, Region I Administrator G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 i P. D. Swetland, Senior Resident Inspector, Millstone Unit Nos. 1, 2, and 3 Mr. Kevin T.A. McCarthy, Director Monitoring and Radiation Division Department of Environmental Protection 79 Elm Street P.O. Box 5066 Hartford, Connecticut 06102-5066 Subscribed and sworn to before me thi _/M day of h/h[t h ,1994 l 7 L k ruk, hd71 W 1(ptary Public Data Commission Expirest 8/ 6 l