Submits Attached Revised Chapters of Util QA Plan in Accordance w/10CFR50.54
ML20078R240
Person / Time
Site: South Texas  
Issue date: 12/13/1994
From: Cottle W
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF THE SECRETARY (SECY)
Shared Package
ML20078R194 List:
References
NUDOCS 9502220273
Download: ML20078R240 (3)


Text

7l

.l

,I RECEIVED 75 NRC

'/

The Light

" =o 9 m c16 2 2 26 f

C O mp anysouth Tem Prejat Electne Generattog Stataos P.O. Box 2s9 Wadsworth,Temas r748s Houston Lighting & Power E l 31994 ST-HL-AE-4948 File No.: G09.11 10CFR50.54 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Submittal of Revised Operations Ouality Assurance Plan In accordance with 10CFR50.54, Houston Lighting & Power submits the attached resised chapters of the South Texas Project Operations Quality Assurance Plan. The revision is a consolidation of the change notices which have been submitted to the NRC during the last two years. Houston Lighting & Power has reviewed the revised chapters and has determined that there is no reduction in the effectiveness of the Operations Quality Assurance Plan, there are no unreviewed safety questions, and the information accurately presents changes made since the previous submittal.

In one change notice, QA-023, four paragraphs in Chapter 2.0 which describe the mmunum requirements for the General Manager, Nuclear Assurance, were to be replaced with new information. The paragraphs were deleted and the new information was added to the chapter. but the inserts were not reflected in the change notice description. This oversight has been corrected by this submittal.

tf there are any questions regarding this submittal, please contact Mr. Lawrence Ma: tin at (512) 972-7827 or me at (512) 972-8434.

e.c FCd22:tr' W. T. Cottle Group Vice President, Nuclear JTC/ pas Attachments:

1. Description of Changes
2. Revised Operations Quality Assurance Plan Chapters 1, 2, 4, 7, 13, 15, 16, 17, and 18 Pro;ect Manager on Behalf of the Participanu its the South Tcmas Project nzse.ne w,.>< a.een 1

950222027395021k98 DR ADOCK OS000 PDR

I TT

.! ~

FEB-16-95 THU 08:34 REG 1014 IV WCF0 FAX 110. 5109750356 P.03

.t ST-HL-AE-4948 File No.: G09.11 Page 2 Attachments only to those with "*"

c:

L. J. Callan

  • Rufus S. Scott Regional Administrator, Region IV Associate General Counsel U. S. Nuclear Regulatory Commission Houston Lighting & Power Company 611 Ryan Plaza Drive, Suite 400 P. O. Box 61867 Arlington, TX 76011-8084 Houston, TX 77208 Thomas W. Alexion Institute of Nuclear Power Project Manager Operations - Records Center U. S. Nuclear Regulatory Commission 700 Galleria Parkway Washington, DC 20555-0001 13H15 Atlanta, GA 30339-5957 David P. Loveless
  • Dr. Joseph M. Hendrie Sr. Resident Inspector 50 Bellport Lane clo U.S. Nuclear Regulatory Comm.

Bellport, NY I1713 P. O. Box 910 Bay City, TX 77404-910 J. R. Newman, Esquire Richard A. Ratliff Newman, Bouknight & Edgar, P.C.,

Bureau of Radiation Control STE 1000,1615 L Street, N.W.

Texas Department of Health 1615 L Street, N.W.

1100 West 49th Street Washington, DC 20036 Austin, TX 78756-3189 K. J. Fiedler/M. T. Hardt U. S. Nuclear Regulatory Comm.

Atta: Document Control Desk City Public Service P. O. Box 1771 Washington, DC 20555-0001 San Antonio, TX 78296

3. C. Lanier/M. B. Lee Joseph R. Egan, Esq.

City of Austin Egan & Associates, P.C.

Electric Utility Department 2300 N Street, NW 721 Barton Springs Road Washington, DC 20037 Austin, TX 78704 G. E. Vaughn/C. A. Johnson Central Power and Light Company P. O. Box 2121 Corpus Christi, TX 78403