Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083G022 + (10:53:41, 14 December 2024)
- ML20083G017 + (10:53:41, 14 December 2024)
- ML20083G008 + (10:53:42, 14 December 2024)
- ML20083F999 + (10:53:43, 14 December 2024)
- ML20083G001 + (10:53:43, 14 December 2024)
- U-101112, Interim Deficiency Rept 82-12 Re Binding of Sway Strut/ Snubber Piping Component Supports.Initially Reported on 821021.Defective Parts Tagged & Segregated to Prevent Inadvertent Use.Final Rept Will Be Submitted in 90 Days + (10:53:44, 14 December 2024)
- 05000328/LER-1983-172-03, /03L-0:on 831130,steam Generator Blowdown Containment Isolation Valve 2-FCV-1-182 Failed to Close on Demand.Caused by Valve Limit Switch Misadjustment.Switch Adjusted & Returned to Svc on 831130 + (10:53:46, 14 December 2024)
- ML20083F974 + (10:53:46, 14 December 2024)
- NUREG-2233, EPRI 3002016054 Comments Resolution + (10:53:47, 14 December 2024)
- ML20083F970 + (10:53:48, 14 December 2024)
- B10983, Advises That Weston Geophysical Corp Rept, Seismology & Geological Studies:Miramichi Area,New Brunswick & Central Nh No Longer Treated as Proprietary Info Due to Limited Commercial Marketability + (10:53:54, 14 December 2024)
- 05000315/LER-1983-119-03, /03L-0:on 831123,reservoir & Half of Retaining Clamp for Snubber 1-GRC-S594 Found Detached from Snubber. Caused by Loosening of Clamp Fasteners & Vibration.New Snubber Tested & Installed + (10:53:56, 14 December 2024)
- ML20083F951 + (10:53:57, 14 December 2024)
- ML20083F949 + (10:53:57, 14 December 2024)
- 3F1283-34, Forwards Response to NRC Re Violations Noted in IE Insp Rept 50-302/83-21.Corrective Action Withheld + (10:53:58, 14 December 2024)
- ML20083F935 + (10:53:59, 14 December 2024)
- ML20083F940 + (10:53:59, 14 December 2024)
- ML20083F934 + (10:54:00, 14 December 2024)
- ML20083F933 + (10:54:02, 14 December 2024)
- ML20083F932 + (10:54:03, 14 December 2024)
- ML20083F929 + (10:54:03, 14 December 2024)
- ML20083F927 + (10:54:04, 14 December 2024)
- ML20083F924 + (10:54:05, 14 December 2024)
- ML20083F918 + (10:54:05, 14 December 2024)
- ML20083F916 + (10:54:06, 14 December 2024)
- ML20083F915 + (10:54:07, 14 December 2024)
- ML20083F912 + (10:54:09, 14 December 2024)
- AECM-83-0024, Forwards Response to NRC 831013 Request for Addl Info Re Agastat Relays.Agastat Relay Replacement Program Will Be Performed During Current Outage.Failure Rate of Relays within Design Considerations.Proprietary Figures Deleted + (10:54:10, 14 December 2024)
- ML20083F909 + (10:54:10, 14 December 2024)
- ML20083F906 + (10:54:11, 14 December 2024)
- 3F0184-02, Responds to NRC 831006 Request for Plan of Action Re Improvement of LPIS Availability Per TMI Item II.K.3.17. Primary Reason for High Unavailability Caused by Malfunction of Valves DHV-110 & DHV-111.Analog Control Sys Installed + (10:54:12, 14 December 2024)
- ML20083F905 + (10:54:12, 14 December 2024)
- ML20083F899 + (10:54:13, 14 December 2024)
- 3F1183-25, Responds to NRC Re Violations Noted in IE Insp Rept 50-302/83-18.Corrective Actions:Identified Errors Will Be Completed by 840131 & Addl Deficiencies Corrected by 840917 + (10:54:14, 14 December 2024)
- ML20083F895 + (10:54:14, 14 December 2024)
- ML20083F890 + (10:54:15, 14 December 2024)
- 05000348/LER-1983-085-03, /03L-0:on 831204,Containment Spray Sys Valve Inservice Tests FNP-1-STP-16.7 Not Performed within Allowed Time.Sys Declared Inoperable.Caused by Personnel Error.No Cause Found Re Improper Valve Stroking + (10:54:16, 14 December 2024)
- ML20083F882 + (10:54:17, 14 December 2024)
- ML20083F862 + (10:54:18, 14 December 2024)
- ML20083F879 + (10:54:18, 14 December 2024)
- 05000348/LER-1983-083-03, /03L-0:on 831206,during Auxiliary Bldg Battery Quarterly Verification FNP-1-STP-605.4,train B Auxiliary Bldg Battery Declared Inoperable Due to Voltage Decrease from Original Acceptance Test on Cell 1 + (10:54:20, 14 December 2024)
- TXX-4086, Forwards Addl Info Re TMI Item II.F.2, Instrumentation for Detection of Inadequate Core Cooling & Justification for Proposed Implementation Schedule for Heated Junction Thermocouple Sys + (10:54:21, 14 December 2024)
- 05000395/LER-1983-135-03, /03L-0:on 831201,supports RHH-134,135 & 137 in RHR Sys Declared Inoperable.Cause Under Investigation.Supports Repaired,Tested & Declared Operable + (10:54:22, 14 December 2024)
- ML20083F848 + (10:54:23, 14 December 2024)
- ML20083F839 + (10:54:24, 14 December 2024)
- ML20083F840 + (10:54:24, 14 December 2024)
- ML20083F836 + (10:54:25, 14 December 2024)
- ML20083F834 + (10:54:25, 14 December 2024)
- ML20083F828 + (10:54:26, 14 December 2024)
- ML20083F830 + (10:54:26, 14 December 2024)
- ML20083F827 + (10:54:27, 14 December 2024)