TENNESSEE VX1' LEY AUTHORITY E
l'UH ATTANOOG4."T'EN N ESSEE 37401 400ChestnutStreegTowerII a.; "i m 3 P2 3i December 27, 1983 BLRD-50-439/83-56 U.S. Nuclear Regulatory Commission Region II Attn:
Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNIT 2 - VALVE FLOODED IN REACTOR BUILDING NORMAL SUMP
- UNIT 2 - BLRD-50-439/83 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector P. E.
Fredrickson on December 1, 1983 in accordance with 10 CFR 50.55(e) as NCR 2549 Enclosed is our first interim report. We expect to submit our next report by March 28, 1984.
If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Licensing Enclosure cc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Records Center (Enclosure)
Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8401050581 831 gDRADOCK0500
[ ICTAL r(',py 9
PDR Mb 7 1983-TVA 5OTH ANNIVERSARY a i An Equal Opportunity Employer
,~
_g.
ENCLOSURE BELLEFONTE NUCLEAR PLANT UNIT 2 VALVE FLOODED IN REACTOR BUILDING NORMAL SUMP - UNIT 2 BLRD-50-439/83-56 10 CFR 50.55(e)
NCR 2549 FIRST INTERIM REPORT Description of Deficiency The motor-operator of valve (2WL-IFCV-068-B) in the liquid waste system was damaged by flooding of the reactor building normal sump tank room. The flooding was initially attributed to a system flush. An investigation, however, was made into the apparent cause of this deficiency by Bellefonte's Division of Construction (CONST) and revealed that other conditions could have caused the flooding instead of a system flush. An additional investigation is being performed to determine the apparent cause of this deficiency.
Interim Progress The valve motor operator will be disconnected and sent to Bellefonte's electric shop for cleanup and inspection. If the motor operator cannot be refurbished onsite, the motor operator will be returned to the vendor (Limitorque) for rework.
e
%