ML20083F840

From kanterella
Jump to navigation Jump to search
Forwards LERs 83-083/03L-0 & 83-085/03L-0
ML20083F840
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/30/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20083F843 List:
References
NUDOCS 8401100390
Download: ML20083F840 (1)


Text

_ _ _ _ _ _ _. _ _ _ _ _

j MaOng Address Alabama Power Company

,}

600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

Senior Vice President AlabamaPower Flintridge Building 3

g;.g

,,1 the sauttem electnc system December 30, 1983 Docket No. 348 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303

Dear Sir:

Joseph M. Farley Nuclear Plant, Unit 1, Licensee Event Reports Nos. LER 83-083/03L-0 and LER 83-085/03L-0 are forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9.1.13 to provide thirty (30) days written notification of the occurrences.

If you have any questions, please advise.

Yours very truly, F. L. Clayto, J r. p FLCJr/KWM:nac/F-6 Enclosures xc: Director, IE (30 copies)

Director, MIPC (3 copies)

I e401100390 831230 f ADEK 0500034 g g g.. Q f.g,.

TklL lII

- - - -