ML20083F935
| ML20083F935 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/21/1983 |
| From: | Wilgus W FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20083F869 | List: |
| References | |
| 3F-0983-16, 3F-983-16, NUDOCS 8401050629 | |
| Download: ML20083F935 (1) | |
Text
,
O
${ son 93WO)dk bf 1!F N;;n
, c., - m%. e
-3 m
n n;L OGg
.LY p 9N!l4;glP 3'i S[p 28 P l l 2 7 QH
,w.
M
.P.o...w..e...r September 21, 1983 3F-0983-16 Mr. James P. O'Reilly Regional Administrator, Region 11 Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30303
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 IE Inspection Report No. 83-18
Dear Mr. O'Reilly:
Florida Power Corporation's response to Inspection Report No. 83-18, due September 21, 1983, will be submitted on or before October 12, 1983.
The additional time is necessary to carefully analyze the cause of this event; since this was a recurrent violation, and the initial corrective action was apparently ineffective. As an interim measure, the four deficient procedures identified by the inspector have been corrected.
Future long-term corrective actions will depend upon the results of the study currently in progress to determine the true cause of this problem. This information
{
will be submitted in the final response to this report.
I l
Sincerely, 0.).O '
W.S. Wilgus Vice President Nuclear Operations h h K 0500o302 29 832221 AEF:jcf G
PDR cc:
Document Control Desk U.S. Nuclear Regulatory Commission
)
Washington, D.C. 20555 General Office 3201 Thirty fourtn street soutn. P O Box 14042, st. Petersburg. Florda 33733 813-866-5151 J