Responds to IE Insp Rept 50-302/83-18.Requests Extension Until 831012 to Analyze Cause.Initial Corrective Action Ineffective
ML20083F935
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/21/1983
From: Wilgus W
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20083F869 List:
References
3F-0983-16, 3F-983-16, NUDOCS 8401050629
Download: ML20083F935 (1)


Text

,

O

${ son 93WO)dk bf 1!F N;;n

, c., - m%. e

-3 m

n n;L OGg

.LY p 9N!l4;glP 3'i S[p 28 P l l 2 7 QH

,w.

M

.P.o...w..e...r September 21, 1983 3F-0983-16 Mr. James P. O'Reilly Regional Administrator, Region 11 Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30303

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 IE Inspection Report No. 83-18

Dear Mr. O'Reilly:

Florida Power Corporation's response to Inspection Report No. 83-18, due September 21, 1983, will be submitted on or before October 12, 1983.

The additional time is necessary to carefully analyze the cause of this event; since this was a recurrent violation, and the initial corrective action was apparently ineffective. As an interim measure, the four deficient procedures identified by the inspector have been corrected.

Future long-term corrective actions will depend upon the results of the study currently in progress to determine the true cause of this problem. This information

{

will be submitted in the final response to this report.

I l

Sincerely, 0.).O '

W.S. Wilgus Vice President Nuclear Operations h h K 0500o302 29 832221 AEF:jcf G

PDR cc:

Document Control Desk U.S. Nuclear Regulatory Commission

)

Washington, D.C. 20555 General Office 3201 Thirty fourtn street soutn. P O Box 14042, st. Petersburg. Florda 33733 813-866-5151 J