Requests Commitment to Replace Transmitter O-rings During Yearly Instrument Calibr Checks,Be Changed to Replace O-rings on Same Frequency as Tech Spec Required Equipment Calibr Frequency
ML20083F909
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 12/12/1983
From: Cutter A
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-SSINS-6820 IEB-79-01B, IEB-79-1B, LAP-83-449, NUDOCS 8401050615
Download: ML20083F909 (1)


Text

.

CD&L Carolina Power & Light Company SERIAL: LAP-83-449 Mr. James P. O'Reilly, Regional Administrator

-United States Nuclear Regulatory Commission Suite 2900-101 Marietta Street, NW Atlanta, GA 30303 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 ENVIRONMENTAL QUALIFICATION OF ELECTRICAL EQUIPMENT RESCHEDULING TRANSMITTER 0-RING REPLACEMENTS

Dear Mr. O'Reilly:

Following a review of Carolina Power & Light Company's (CP&L's)

January 30, 1981 response to IEB 79-01B (Rev.3) titled "HBR Environmental Qualification of Electrical Equipment," CP&L requests that our commitment to replace transmitter 0-rings during yearly instrument calibration checks be changed. It was CP&L's intent in this earlier correspondence to replace the 0-rings on the same frequency as the Technical Specification required equipment calibration frequency which is refueling and not yearly. Based on a recent review of the vendor recommendations, CP&L believes.that the appropriate replacement frequency is each time the transmitter cover is removed or each refueling outage, whichever comes first.

Carolina Power &

Light Company will, by the next refueling outage, require that transmitter 0-ring replacement be predicated on each transmitter cover removal or refueling interval.. For these reasons, and because the replacement of the 0-ring will be performed on a more frequent interval than the qualified life of the 0-ring, CP&L believes that 0-ring replacements based on each cover removal pose no increased hazTrd to plant or personnel safety and will lead to more efficient plant operations.

If you have any questions, please contact a member of my staff.

Yours ery tr A. B. Cutter Vice President Nuclear Engineering & Licensing PM/tda (8014NLU)

~

8401050615 831212 cc:

Mr. S. A. Varga (NRC)

PDR ADOCK 05000261 Mr. G. Requa (NRC)

P PDR i

Mr. Steve Weise (NRC-HBR) if"I f

411 Fayetteville Street

  • P O. Box 1561
  • Raleigh, N. C. 27602
nWnB%MK GM GSLA10%'MWdMA

.~-