Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083L517 + (10:31:17, 14 December 2024)
- ML20083L516 + (10:31:19, 14 December 2024)
- ML20083L513 + (10:31:20, 14 December 2024)
- ML20083L514 + (10:31:20, 14 December 2024)
- ML20083L511 + (10:31:21, 14 December 2024)
- RBG-17-522, Interim Deficiency Rept DR-141 Re Internal Attachment Bolts in Check Valves Supplied by Velan Engineering Co. Investigation Incomplete.Next Rept Will Be Submitted by 840530 + (10:31:21, 14 December 2024)
- ML20083L510 + (10:31:22, 14 December 2024)
- ML20083L506 + (10:31:23, 14 December 2024)
- ML20083L501 + (10:31:28, 14 December 2024)
- ML20083L497 + (10:31:29, 14 December 2024)
- ML20083L494 + (10:31:30, 14 December 2024)
- ML20083L484 + (10:31:31, 14 December 2024)
- ML20083L481 + (10:31:32, 14 December 2024)
- ML20083L477 + (10:31:33, 14 December 2024)
- ML20083L468 + (10:31:34, 14 December 2024)
- ML20083L472 + (10:31:34, 14 December 2024)
- ML20083L466 + (10:31:38, 14 December 2024)
- ML20083L462 + (10:31:39, 14 December 2024)
- ML20083L459 + (10:31:43, 14 December 2024)
- ML20083L456 + (10:31:44, 14 December 2024)
- ML20083L454 + (10:31:45, 14 December 2024)
- ML20083L447 + (10:31:46, 14 December 2024)
- ML20083L448 + (10:31:46, 14 December 2024)
- ML20083L440 + (10:31:47, 14 December 2024)
- ML20083L436 + (10:31:48, 14 December 2024)
- ML20083L432 + (10:31:49, 14 December 2024)
- ML20083L431 + (10:31:50, 14 December 2024)
- RBG-17520, Interim Deficiency Rept DR-123 Re Mccroskey Sheet Metal HVAC Ductwork Fabrication.Interim or Final Status Rept Will Be Provided by 840530 + (10:31:51, 14 December 2024)
- ML20083L420 + (10:31:51, 14 December 2024)
- ML20083L417 + (10:31:52, 14 December 2024)
- ML20083L416 + (10:31:53, 14 December 2024)
- ML20083L414 + (10:31:53, 14 December 2024)
- ML20083L409 + (10:31:54, 14 December 2024)
- RBG-17518, Interim Deficiency Rept DR-154 Re High Voltage Cable Terminations.Interim or Final Status Rept Will Be Provided by 840521 + (10:31:54, 14 December 2024)
- ML20083L404 + (10:31:55, 14 December 2024)
- ML20083L403 + (10:31:56, 14 December 2024)
- ML20083L399 + (10:31:57, 14 December 2024)
- ML20083L391 + (10:31:58, 14 December 2024)
- ML20083L397 + (10:31:58, 14 December 2024)
- SNRC-1036, Provides Addl Response to NRC Questions Re Supplemental Motion for Low Power License.Actual Power Level & Time History of Startup Phase of Plant Difficult to Predict Due to Unplanned Shutdowns During Power Ascension Test Program + (10:31:59, 14 December 2024)
- SECY-20-0034, Staff Approach to Exercise Enforcement Discretion for Noncompliances Caused by the COVID-19 Pandemic + (10:31:59, 14 December 2024)
- ML20083L384 + (10:32:00, 14 December 2024)
- JAFP-95-0213, Forwards Monthly Operating Rept for Apr 1995 & Revised Rept for Mar 1995 for Ja FitzPatrick NPP + (10:32:01, 14 December 2024)
- ML20083L374 + (10:32:01, 14 December 2024)
- 05000325/LER-1995-002-01, :on 950323,found Multiple Cl Sensors Used for Control Bldg Isolation Logic to Be Outside TS Tolerances During Routine Calibr.Caused by Design Deficiency. Re-evaluated Design Changes to Maintain Control Bldg Sensor + (10:32:03, 14 December 2024)
- ML20083L369 + (10:32:04, 14 December 2024)
- ML20083L368 + (10:32:05, 14 December 2024)
- ML20083L367 + (10:32:06, 14 December 2024)
- ML20083L366 + (10:32:06, 14 December 2024)
- AECM-84-0218, Responds to 840130 Request to Perform Survey of Methods of Securing Openings to Vital Areas.Areas Requiring Upgrading Identified.Design Change Packages Initiated.Iron Bars Will Be Welded to Openings + (10:32:07, 14 December 2024)
- BSEP-95-0220, Multiple Chlorine Sensors Used for Control Bldg Isolation Logic Found to Be Outside TS Tolerances During Routine Calibr + (10:32:08, 14 December 2024)