Revised Monthly Operating Rept for Mar 1995 for Ja FitzPatrick NPP
ML20083L391
Person / Time
Site: FitzPatrick 
Issue date: 03/31/1995
From: Flagg R
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20083L378 List:
References
NUDOCS 9505180317
Download: ML20083L391 (1)


Text

.

NEW YORK POWER AUTHORITY JANES A. PIT 5 PATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT DOCKET NO.:

50-333 UNIT NAME:

FITEPATRICK DATE:

APJtIL 1995 I

COMPLETED BY: RUSSELL FIAGG TELEPHONE:

(315)349-6766 OPERATING STATUS 1.

Unit Names FITZPATRICK 2.

Reporting Period 950301 - 950331 NOTES:

3.

Licensed Thermal Power (MWT): 2436 4.

. Nameplate Rating (Gross MWE): 883.0 5.

Design Electrical Rating (Net MWE):

816.0 6.

Maximum Dependable Capacity (Gross MWE) 801.0 7.

Maximum Dependable capacity (Not MWE) 773.6 8.

If changes occur in capacity ratings (Items 3-7) since last report, give reasons:

9.

Power level to which restricted, if any (Net MWE):

l 10.

Reasons for restrictions, if any:

THIS MONTE YR-TO-DATE CUMULATIVE 11.

Hours in Reporting Period:

744.0 2160.0 172489.0 12.

Number of Hours Reactor was Critical 244.0 244.0 119524.8 1

13.

Reactor Reserve Shutdown Hours:

O O

O

)

14.

Hours Generator On-Line:

132.5 132.5 115393.1 1

15.

Unit Reserve Shutdown Hours:

O O

O 16.

Gross Thermal Energy Generated (MWH):

143038.0 143038.0 254351705.0 i

17.

Gross Electrical Energy Generated (MWH):

35830.0 35830.0 86428640.0 18.

Net Electrical Energy Generated (MWH):

34055.0 34055.0 83021930.0 19.

Unit Service Factor:

17.8 6.1 66.9 20.

Unit Availability Factor:

17.8 6.1 66.9 21.

Unit Capacity Factor (using MDC Net):

5.9 2.0 69.0 i

22.

Unit Capacity Factor (using DER Net):

5.6 1.9 59.0 23.

Unit Forced Outage Rates 0.0 0.0 11.7 24.

Shutdowns scheduled over next 6 months (type, date, and duration of each):

Shutdown 25.

If shutdown at end of report period, estimated date of startup:

26.

Units in Test Status (prior to commercial operation):

FORECAST ACHIEVED Initial criticality Initial Electricity Commercial Operation

~

9505180317 950508 PDR ADOCK 05000333 R