MARCH 1995 - REVISED APPENDIX C APPENDIX C OPERATING DATA REPORT DOCKET NO.
50-254 UNrr One DATE April 6,1995 COMPLETED BY Kristal Moore TELEPHONE (309) 654-2241 OPERATING STATUS 0000 030195
- l. REPORTING PERIOD: 2400 033195 GROSS HOURS IN REPORTING PERIOD: 744
- 2. CURRENTLY ALTTHORIZED POWER LEVEL (MWl): 2511 MAX > DEPEND > CAPACTTY: 769 DESIGN ELECTRICAL RATING (MWe-NET): 789
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): N/A
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE l'
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 744.00 1928.80 154361.30
- 6. REACTOR RESERVE SIIUTDOWN HOURS 0.00 0.00 3421.90
- 7. HOURS GENERATOR ON LINE 744.00 1873.00 1496 %.90
- 8. UNTT RESERVE SHITTDOWN HOURS 0.00 0.00 909.20
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 1812200.80 4358541.50 323514664.90
- 10. GROSS ELEC11tlCAL ENERGY GENERATED (MW10 585866.00 1405894.00 104869748.00
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 563772.00 1346240.00 98934406.00
- 12. REACTOR SERVICE FACTOR 100.00 89.30 76.67
- 13. REACTOR AVAILABILITY FACTOR 100.00 89.30 78.37
- 14. UNIT SERVICE FACTOR 100.00 86.71 74.35
- 15. UNTT AVAILABILTTY FACTOR 100.00 86.71 74.80
- 16. UNTT CAPACTTY FACTOR (Using MDC) 98.54 81.05 63.90 f
- 17. UNTT CAPACITY FACTOR (Using Design MWe) 96.04 78.99 62.28
- 18. UNrr FORCED OUTAGE RATE 0.00 13.29 7.56 i
- 19. SHtTTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 20. IF SHUTDOWN AT END OF REPORT PERIOD < ESTIMATED DATE OF STARTUP:
- 21. UNTTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INTTIAL CRTTICALTTY INITIAL ELECTRICfrY COMMERCIAL OPERATION
O MARCH 1995. REVISED APPENDIX C APPENDDC C OPERATING DATA REPORT DOCKET NO.
50 265 UNTT Two DATE April 6,1995 CO iPLETED BY Kristal Moore TELEPHONE (309) 654-2241 OPERATING STATUS 0000 030195
- 1. REPORTING PERIOD: 2400 033195 GROSS HOURS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUTIIORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACTTY: 769 DESIGN ELECIRICAL RATING (MWe NE'D: 789
- 3. POWER LEVELTO WHICH RESTRICTED (IF ANY)(MWe-Net): N/A
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 100.90 1516.90 151292.75
- 6. REACTOR RESERVE SHITTDOWN HOURS 0.00 0.00 2985.80
- 7. IIOURS GENERATOR ON LINE 98.90 1514.90 147446.55
- 8. UNIT RESERVE SilUTDOWN HOURS 0.00 0.00 702.90
- 9. GROSS TiiERMAL ENERGY GENERATED (MWlO 212329.90 3363599.00 319304303.10
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 66318.00 1064371.00 102578272.00
- 11. NET ELECTRICAL ENERGY GENERATED (MWlO 58157.00 1012484.00 97168393.00
- 12. REACTOR SERVICE FACTOR 13.56 70.23 75.73
- 13. REACTOR AVAILABILITY FACTOR 13.56 71.23 77.23
- 14. UNrr SERVICE FACTOR 13.29 70.13 73.81
- 15. UNTT AVAILABILrrY FACTOR 13.29 70.13 74.16
- 16. UNir CAPACrrY FACTOR (Using MDC) 10.16 60.95 63.25
- 17. UNIT CAPACITY FACTOR (Ushw Design MWe) 9.91 59.41 61.65
- 18. UNTT FORCED OUTAGE RATE 0.00 0.00 9.84
- 19. $11UTDOWNS ScilEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACIO:
- 20. IF SHLrrDOWN AT END OF REPORT PERIOD < ESTIM ATED DATE OF STARTUP: 6-5 95 21 UNrrs IN TEST STATUS (PRIOP TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INTTIAL CRTTICALITY INirlAL ELECTRICirY COMMERCIAL OPERATION 1.16 9 TliCHOP3\\NRC\\ MON 1MLY.RPT
-.