Revised Monthly Operating Repts for Mar 1995 for Quad Cities Nuclear Power Station Units 1 & 2
ML20083L414
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 03/31/1995
From: Moore K
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20083L406 List:
References
NUDOCS 9505180352
Download: ML20083L414 (2)


Text

!

I

.g 4 . -

MARCH 1995 - REVISED APPENDIX C APPENDIX C OPERATING DATA REPORT DOCKET NO. 50-254 UNrr One DATE April 6,1995 COMPLETED BY Kristal Moore TELEPHONE (309) 654-2241 OPERATING STATUS 0000 030195 ,

l. REPORTING PERIOD: 2400 033195 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY ALTTHORIZED POWER LEVEL (MWl): 2511 MAX > DEPEND > CAPACTTY: 769 DESIGN ELECTRICAL RATING (MWe-NET): 789
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): N/A
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE l'

5. NUMBER OF HOURS REACTOR WAS CRITICAL 744.00 1928.80 154361.30
6. REACTOR RESERVE SIIUTDOWN HOURS 0.00 0.00 3421.90
7. HOURS GENERATOR ON LINE 744.00 1873.00 1496 % .90
8. UNTT RESERVE SHITTDOWN HOURS 0.00 0.00 909.20
9. GROSS THERMAL ENERGY GENERATED (MWH) 1812200.80 4358541.50 323514664.90
10. GROSS ELEC11tlCAL ENERGY GENERATED (MW10 585866.00 1405894.00 104869748.00
11. NET ELECTRICAL ENERGY GENERATED (MWH) 563772.00 1346240.00 98934406.00
12. REACTOR SERVICE FACTOR 100.00 89.30 76.67
13. REACTOR AVAILABILITY FACTOR 100.00 89.30 78.37
14. UNIT SERVICE FACTOR 100.00 86.71 74.35
15. UNTT AVAILABILTTY FACTOR 100.00 86.71 74.80
16. UNTT CAPACTTY FACTOR (Using MDC) 98.54 81.05 63.90 f
17. UNTT CAPACITY FACTOR (Using Design MWe) 96.04 78.99 62.28
18. UNrr FORCED OUTAGE RATE 0.00 13.29 7.56 i
19. SHtTTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
20. IF SHUTDOWN AT END OF REPORT PERIOD < ESTIMATED DATE OF STARTUP:
21. UNTTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INTTIAL CRTTICALTTY INITIAL ELECTRICfrY COMMERCIAL OPERATION

1. is-9 1TCHOP3\NRC\ MONTHLY.RPT 9505180352 950505 PDR ADOCK 05000254

, R PDR

% O

  • MARCH 1995. REVISED APPENDIX C APPENDDC C OPERATING DATA REPORT DOCKET NO. 50 265 UNTT Two DATE April 6,1995 CO iPLETED BY Kristal Moore TELEPHONE (309) 654-2241 OPERATING STATUS 0000 030195
1. REPORTING PERIOD: 2400 033195 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTIIORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACTTY: 769 DESIGN ELECIRICAL RATING (MWe NE'D: 789
3. POWER LEVELTO WHICH RESTRICTED (IF ANY)(MWe-Net): N/A
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 100.90 1516.90 151292.75
6. REACTOR RESERVE SHITTDOWN HOURS 0.00 0.00 2985.80
7. IIOURS GENERATOR ON LINE 98.90 1514.90 147446.55
8. UNIT RESERVE SilUTDOWN HOURS 0.00 0.00 702.90
9. GROSS TiiERMAL ENERGY GENERATED (MWlO 212329.90 3363599.00 319304303.10
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 66318.00 1064371.00 102578272.00
11. NET ELECTRICAL ENERGY GENERATED (MWlO 58157.00 1012484.00 97168393.00
12. REACTOR SERVICE FACTOR 13.56 70.23 75.73
13. REACTOR AVAILABILITY FACTOR 13.56 71.23 77.23
14. UNrr SERVICE FACTOR 13.29 70.13 73.81
15. UNTT AVAILABILrrY FACTOR 13.29 70.13 74.16
16. UNir CAPACrrY FACTOR (Using MDC) 10.16 60.95 63.25
17. UNIT CAPACITY FACTOR (Ushw Design MWe) 9.91 59.41 61.65
18. UNTT FORCED OUTAGE RATE 0.00 0.00 9.84
19. $11UTDOWNS ScilEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACIO:
20. IF SHLrrDOWN AT END OF REPORT PERIOD < ESTIM ATED DATE OF STARTUP: 6-5 95 21 UNrrs IN TEST STATUS (PRIOP TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INTTIAL CRTTICALITY INirlAL ELECTRICirY COMMERCIAL OPERATION 1.16 9 TliCHOP3\NRC\ MON 1MLY.RPT