NEW YORK POWER AUTEORITY JANES A. PIT 5 PATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT DOCKET NO.:
50-333 UNIT NAME:
FITEPATRICK DATEt May 1995 COMPLETED BY: RDSSELL ELAGG TELEPHONE:
(315)349-6768 OPERATING STATUS 1.
Unit Names FITZPATRICK 2.
Reporting Period 950401 - 950430 NOTES:
3.
Licensed Thermal Power (MWT): 2436 4.
Nameplate Rating (Gross MWE): 883.0 5.
Design Electrical Rating (Not MWE):
816.0 6.
Maximum Dependable Capacity (Gross MWE) 601,0 7.
Maximum Dependable capacity (Net MWE) 773.6 8.
If changes occur in capacity ratings (Items 3-7) since last report, give reasons:
9.
Power level to which restricted, if any (Net MWE):
10.
Reasons for restrictions, if any:
TEIS MONTE YR-TO-DATE CUMULATIVE 11.
Hours in Reporting Period:
719.0 2879.0 173208.0 12.
Number of Hours Reactor was Critical:
719.0 963.0 120243.8 13.
Reactor Reserve Shutdown Hours:
0 0
0 14.
Hours Generator On-Lines 719.0 851.5 116112.1 15.
Unit Reserve Shutdown Hours:
O O
O 16.
Cross Thermal Energy Generated (MWH):
1664784.0 1807822.0 256016489.0 17.
Gross Electrical Energy Generated (MWH):
563750.0 599580.0 86992390.0 18.
Net Electrical Energy Generated (MWH):
544665.0 578720.0 83566595.0 19.
Unit Service Factor:
100.0 29.6 67.0 20.
Unit Availability Factor:
100.0 29.6 67.0 21.
Unit Capacity Factor (using MDC Net):
97.9 26.0 69.2 22.
Unit Capacity Factor (using DER Net):
92.8 24.6 59.1 23.
Unit Forced Outage Rate:
0.0 0.0 11.6 24.
Shutdowns scheduled over next 6 months (type, date, and duration of each):
25.
If shutdown at end of report period, estimated date of startup:
26.
Units in Test Status (prior to commercial operation):
FORECAST ACHIEVED Initial Criticality Initial Electricity Commercial Operation 9505180309 950509 PDR ADOCK 05000333 R
PDR J
NEW YORK POWER AUTHORITY JANES A. FIT 5 PATRICK NUCLEAR POWER PLANT f
AVERAGE DAILY UNIT POWER LEVEL REPORT MONTHS APRIL 1995 DOCKET No.s 50-333 UNIT NAMES EITZPATRICK DATES MAY 1995 COMPLETED BYs RUSSETL FLAGG TELEPHONES (315)349-6768 DAY NET AVERAGE DAILY POWER LEVEL DAY NET AVERAGE DAILY POWER LEVEL 1
49.11 17 99.67 2
63.73 18 99.62 3
86.10 19 99.62 4
64.99 20 99.62 5
83.28 21 99.77 6
98.71 22 99.82 7
97.86 23 99.67 8
99.72 24 99.77 9
99.47 25 99.57 10 99.07 26 99.72 11 98.16 27 99.57 99.57 28 99.22 12 13 99.87 29 99.62 14 99.77 30 99.62 i
15 99.67 l
16 99.57 l
l l
l 1
l
NEW Y@RK POWER AUTHORITY JAMES A. FIT 5 PATRICK NUCLEAR POWER PLANT NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE REPORT NONTHs APRIL 1995 DOCKET NO.s' 50-333 UNIT NAMES FITKPATRICK DATES RAY 1995 COMPLETED BYs RUSSRLL ELAGG TELEPHONES (315)349-6768 l
The FitzPatrick Plant remained on line for the entire operating period.
t l
l
.J
NEW YORK POWER AUTHORITY JAMES A. FIT 5 PATRICK NUCLEAR POWER PLANT UNIT SEUTDOWNS REPORT REPORT MONTHz APRIL 1995
' i' DOCKET NO.n 50-333 UNIT NAME:
FITIFATRICK DATES RAY 1995-COMPLETED BY Rammer.r. Fr.Ama TELEPHONEt.
(3I5)349-6760 D
C UH R
METHOD S
O RO E
OF YC MC NO.
DATE TYPE AU A
SHUTTING LICENSEE SO PO CAUSE AND CORRECTIVE ACTION TR S
DOWN EVENT TD 0D TO PREVENT RECURRENCE IS O
THE REPORT EE NE O
N REACTOR M
E N
N T
1 1
2 3
4 Fs FORCED REASONS METHODS EXHIBIT G -INSTRUCTIONS S: SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN)
- 1. MANUAL FOR PREPARATION OF DATA ENTRY B. MAINTENANCE OR TEST
- 2. MANUAL SCRAM SHEETS FOR LICENSEE EVENT C. REFUELING
- 3. AUTOMATIC SCRAM REPORT (LER) FILE (NUREG-Ol61)
D. REGULATORY RESTRICTION
- 4. CONTINUED E. OPERATOR TRAINING AND LICENSE EXAMINATION
- 5. REDUCED LOAD F. ADMINISTRATIVE
- 9. OTHER G. OPERATIONAL ERROR (EXPLAIN)
H. OTHER (EXPLAIN)
-