NEW YORK POWER AUTEORITY JANES A. PIT 5 PATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT DOCKET NO.:

50-333 UNIT NAME:

FITEPATRICK DATEt May 1995 COMPLETED BY: RDSSELL ELAGG TELEPHONE:

(315)349-6768 OPERATING STATUS 1.

Unit Names FITZPATRICK 2.

Reporting Period 950401 - 950430 NOTES:

3.

Licensed Thermal Power (MWT): 2436 4.

Nameplate Rating (Gross MWE): 883.0 5.

Design Electrical Rating (Not MWE):

816.0 6.

Maximum Dependable Capacity (Gross MWE) 601,0 7.

Maximum Dependable capacity (Net MWE) 773.6 8.

If changes occur in capacity ratings (Items 3-7) since last report, give reasons:

9.

Power level to which restricted, if any (Net MWE):

10.

Reasons for restrictions, if any:

TEIS MONTE YR-TO-DATE CUMULATIVE 11.

Hours in Reporting Period:

719.0 2879.0 173208.0 12.

Number of Hours Reactor was Critical:

719.0 963.0 120243.8 13.

Reactor Reserve Shutdown Hours:

0 0

0 14.

Hours Generator On-Lines 719.0 851.5 116112.1 15.

Unit Reserve Shutdown Hours:

O O

O 16.

Cross Thermal Energy Generated (MWH):

1664784.0 1807822.0 256016489.0 17.

Gross Electrical Energy Generated (MWH):

563750.0 599580.0 86992390.0 18.

Net Electrical Energy Generated (MWH):

544665.0 578720.0 83566595.0 19.

Unit Service Factor:

100.0 29.6 67.0 20.

Unit Availability Factor:

100.0 29.6 67.0 21.

Unit Capacity Factor (using MDC Net):

97.9 26.0 69.2 22.

Unit Capacity Factor (using DER Net):

92.8 24.6 59.1 23.

Unit Forced Outage Rate:

0.0 0.0 11.6 24.

Shutdowns scheduled over next 6 months (type, date, and duration of each):

25.

If shutdown at end of report period, estimated date of startup:

26.

Units in Test Status (prior to commercial operation):

FORECAST ACHIEVED Initial Criticality Initial Electricity Commercial Operation 9505180309 950509 PDR ADOCK 05000333 R

PDR J

NEW YORK POWER AUTHORITY JANES A. FIT 5 PATRICK NUCLEAR POWER PLANT f

AVERAGE DAILY UNIT POWER LEVEL REPORT MONTHS APRIL 1995 DOCKET No.s 50-333 UNIT NAMES EITZPATRICK DATES MAY 1995 COMPLETED BYs RUSSETL FLAGG TELEPHONES (315)349-6768 DAY NET AVERAGE DAILY POWER LEVEL DAY NET AVERAGE DAILY POWER LEVEL 1

49.11 17 99.67 2

63.73 18 99.62 3

86.10 19 99.62 4

64.99 20 99.62 5

83.28 21 99.77 6

98.71 22 99.82 7

97.86 23 99.67 8

99.72 24 99.77 9

99.47 25 99.57 10 99.07 26 99.72 11 98.16 27 99.57 99.57 28 99.22 12 13 99.87 29 99.62 14 99.77 30 99.62 i

15 99.67 l

16 99.57 l

l l

l 1

l

NEW Y@RK POWER AUTHORITY JAMES A. FIT 5 PATRICK NUCLEAR POWER PLANT NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE REPORT NONTHs APRIL 1995 DOCKET NO.s' 50-333 UNIT NAMES FITKPATRICK DATES RAY 1995 COMPLETED BYs RUSSRLL ELAGG TELEPHONES (315)349-6768 l

The FitzPatrick Plant remained on line for the entire operating period.

t l

l

.J

NEW YORK POWER AUTHORITY JAMES A. FIT 5 PATRICK NUCLEAR POWER PLANT UNIT SEUTDOWNS REPORT REPORT MONTHz APRIL 1995

' i' DOCKET NO.n 50-333 UNIT NAME:

FITIFATRICK DATES RAY 1995-COMPLETED BY Rammer.r. Fr.Ama TELEPHONEt.

(3I5)349-6760 D

C UH R

METHOD S

O RO E

OF YC MC NO.

DATE TYPE AU A

SHUTTING LICENSEE SO PO CAUSE AND CORRECTIVE ACTION TR S

DOWN EVENT TD 0D TO PREVENT RECURRENCE IS O

THE REPORT EE NE O

N REACTOR M

E N

N T

1 1

2 3

4 Fs FORCED REASONS METHODS EXHIBIT G -INSTRUCTIONS S: SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN)

1. MANUAL FOR PREPARATION OF DATA ENTRY B. MAINTENANCE OR TEST
2. MANUAL SCRAM SHEETS FOR LICENSEE EVENT C. REFUELING
3. AUTOMATIC SCRAM REPORT (LER) FILE (NUREG-Ol61)

D. REGULATORY RESTRICTION

4. CONTINUED E. OPERATOR TRAINING AND LICENSE EXAMINATION
5. REDUCED LOAD F. ADMINISTRATIVE
9. OTHER G. OPERATIONAL ERROR (EXPLAIN)

H. OTHER (EXPLAIN)

-