Forwards Ofc of Nuclear Reactor Regulation Performance Evaluation in Compliance w/810604 Memo Re Systematic Assessment of Licensee Performance Cycle 2.Notifies That Review Board Meeting for Facility Scheduled for 810723
ML20083L517
Person / Time
Site: 05000000, Satsop
Issue date: 06/30/1981
From: Larry Wheeler
Office of Nuclear Reactor Regulation
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML082840625 List: ... further results
References
FOIA-83-575 NUDOCS 8107140185
Download: ML20083L517 (1)


Text

{{#Wiki_filter:m, urmwam l~C ,+ t. S 4 S-S 9 4 G Juh 3 0 19 01 i MEMORANDUM FOR: D. G. Eisenhut. Director, Division of Licensing. N W FROM: L. Wheeler, Project Manager, Licensing Branch No. 3, Di THRU: R. L. Tedesco, Assistant Director for Licensing DL F. J. Miraglia Acting Chief. Licensing Branch No. 3, DL SUSJECT: ler 3/5 SALP - CYCLE 2 i

Reference:

Numerende (Eisenhut),

Subject:

SALP-Cycle 2, dated June p 4, 1981 I I The ter 3/5 5 ALP Review toerd for WMP 3/5 is scheduled for July 23. 1981. l( The attaebed W Perfoseence Evaluation is forwarded in compliance with the . hee. ne,, e b ISP *, aattstpetes submitting an OL application with FSAR in late 1983. y Cemetruction is schedeled to be completed in late 1985. L h 'IM corm.pendence with letP 3/5 during the current SAL P evaluation period j ' hes been Itsited to Que11ty Assurance Branch, Licensee Qualification Branch. O M 1s.htglesering Branch, Geosciences Branch, and Division of Licensing l Gener$t Letters. The-branches were requested to provide input for this escluetten (memorendus' attached). QAB, LQB and MEB considered their h cae with 189 3/5 to be of such a low volume as to provide no [ basis for an evaluetten. G8 responded with the attached evaluation input. j i t i Louis Wheeler, Project Manager Licensing Branch No. 3 Division of Licensing e Attactoients: 1. Memo,ilhoeler, June 18, 1981 2. Items. Jackson, June 23, IMI -3. MAR Performance Evaluation IA Copy Hos Been Sent to PDP 4 v /#,o DISTRIBUTION: 3 nV ez 1 .. Docket ffle 50-508/109} LB3 fi1es Fy Q S) O R esc s FJMira91 gp_],) ,. g 0 1 Ogg 3

  • f' A_

"'4 DL:., * .1 [ kAQ/L_.. __ ND% e --4; ow te ut r. ppq at$esto veg g~ 1 G/ /81 ~ 6 81 i 6;/481 o i

y m. + " ' (:, p..%,,, umtro'srlmi .m A 2<i NUCLEAR HEGULATORY COMMISSION p [(T wasmuovos.o e mw. g l \\.'. / JUN 3 0 1981 e MEMORANDUM FOR: D. G. Eisenhut, Director, Division of Licensing, fm l L. Wheeler, Project Manager, licensing Branch No. 3, DL FROM: THRU: R. L. Tedesco Ass t Director for Licensing, DL i . J. Miraglia, Act. Chief. Licensing Branch No 3, DL (

SUBJECT:

WNP 3/5 SALP - CYCLE 2 [

Reference:

Memorandum (Eisenhut),

Subject:

SALP-Cycle 2, dated June C i 4,1981 r D The W 3/5 SALP Review Board for WNP J/5 ss scheduled for July 23, 1981. f. The. attached INut Perfonnance Evaluation is forwarded in compliance with the above reference.'. g: [; %#1P'3/5 anticipates submitting an OL application with FSAR in late 1983. L Construction is scheduled to be completed in late 1985. i L NRR correspondence with i#iP 3/5 during the current SALP evaluation period f has been limited to Quality Assurance Branch, Licensee Qualification Branch, Notorials Engineering Branch, Geosciences Branch, and Division of Licensing s F Generic Letters.. The branches were requested to provide input for this evehmstion (nemoranoust attached). QAB, LQB and MEB considered their f' corre;:ine with iNF,3/5 to-be of such a low volume as to provice no s e basis for an ev.aluation. G8 responded with the attached evaluation input. ! ~,,ler, Project Manager touts c Licensing Branch No. 3 Division of Licensing V Attachments: 1._ Memo, Miraglia, June 18, 1981 e 2. Memo, Jackson, June 23,'981 3. !Wut Performance Evaluation 4 s -^

7 J R.K '.J $ 7 ~ l L_ p[R-{+ ' "*d .:..::: :7,:,?:: ...... i ~, n...o

,1 c,;; v cc.r.u.~..-.

+- O T, fy -.- ,n., n e r.. t c'*'r g;e j s s Juh I 8 1981 l N FOR: W. S. Maass, CMef, Quality Assurance Branch, ct V. A. Meere, CMef, Licensee Qualification Branch. CHrs

5. S. Paulickt CMef, Materials Engineering Branen, DE R. E. Jochsen, Esosciences Branch, DE FRON:

F. J. Mireglia, Acting Chief. Licensing Branch No. 3, Ot. StfSJECT: 14fP 3 Aas 5 SALP REyliW BOARD, JULY 23, 1981 Reft: Tate:. Eisenhut Memorandum dated June 4, 1981, Subject. SALF-Cycle 2 ['., The recepuses regateus aH Cycle'2 evaluations to be completed prior to Jul W. IN 3 and 5 SALF Review Board has already been i' ns.- W.eentr48 records indicate your branch has had some correspondence with W3 and 5 durtag the evaluatfon perfod (July 1,1980 to June 30,1981). Dogsset'seu preside appropriate connents per the fonmat given in the attachment { ts~ tSet TWferases semprenden. Your ccaments should be received by the Project Ammagerf(L.- theeler, x24995) not later than June 23, 1981. I ~ h Frank Ma

a. Acting Chief 4

Licensing Branch No. 3 Division of Licensing ^ o}}