_.
.t.,
Umerbh centriting Ctstion A'.
admu
'9gFP PECO ENERGY a n ; ; """"""
Sanatoga. PA 19464 0920 T.S.6.9.1.6 May 15, 1995 7'
Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555 i
Subject:
Limerick Generating Station Monthly Operating I
f Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of April 1995 forwarded pursuant to Technical Specification 6.9.1.6.
j Very truly yours, ANV.
J es A. Muntz i
Director - Site Engineering I
drh l
Enclosures i
cc:
T. T. Martin, Administrator, Region I, USNRC l
N.
S.
Perry, USNRC Senior Resident Inspector LGS W. G. MacFarland, Vice President, LGS 8
9505190301 950430 PDR ADOCK 05000352 R
-)
i 3
Docket No. 50-352 Attachment to MontNy Operating Report for 1
~
Apr51995 Limerick Generating Station Unit 1 AprN 1 through AprE 30,1995 1.
Narrative Summary of Operating Exoorlences J
Unit 1 began the month of AprH at a nominal 100% of rated thermal power (RTP).
On AprH 4,1995, at 1223 hours0.0142 days <br />0.34 hours <br />0.00202 weeks <br />4.653515e-4 months <br />, power was reduced to 97.5% RTP due to high turbine backpressure. Power was restored to 100% RTP at 1850 hours0.0214 days <br />0.514 hours <br />0.00306 weeks <br />7.03925e-4 months <br />.
On AprH 9,1995, at 0244 hours0.00282 days <br />0.0678 hours <br />4.034392e-4 weeks <br />9.2842e-5 months <br />, power was reduced to 92% RTP 'or main turbine valve testing.
Power was restored to 100% RTP at 0420 hours0.00486 days <br />0.117 hours <br />6.944444e-4 weeks <br />1.5981e-4 months <br />.
On AprH 9,1005, beginning at 1525 hours0.0177 days <br />0.424 hours <br />0.00252 weeks <br />5.802625e-4 months <br />, power was reduced a number of times due to high turbine backpressure, to a minimum of 96% RTP, Power was restored to 100% RTP at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />.
On AprH 11,1995, at 2105 hours0.0244 days <br />0.585 hours <br />0.00348 weeks <br />8.009525e-4 months <br />, power was reduced to 90% RTP in order to remove the 'C' low pressure feedwater hester string from service due to a drain cooler tube leak. Power was restored to 100% RTP at 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> on AprH 12,1995.
On AprN 12,1995, beginning at 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br />, power was reduced a number of times due to high j
turbine backpressure, to a minimum of 90% RTP. Power was restored to 100% RTP at 2235 hours0.0259 days <br />0.621 hours <br />0.0037 weeks <br />8.504175e-4 months <br />.
On AprH 19,1995, beginning at 1130 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.29965e-4 months <br />, power was reduced a number of times due to high j
turbine backpressure, to a minimum of 88% RTP. Power was restored to 100% RTP at 0117 hours0.00135 days <br />0.0325 hours <br />1.934524e-4 weeks <br />4.45185e-5 months <br /> on April 20,1995.
On Apri 22,1995, at 1220 hours0.0141 days <br />0.339 hours <br />0.00202 weeks <br />4.6421e-4 months <br />, power was reduced to 88% RTP due to high turbine backpressure. Power was restored to 100% RTP at 1535 hours0.0178 days <br />0.426 hours <br />0.00254 weeks <br />5.840675e-4 months <br />.
1 On AprR 24,1995, at 1935 hours0.0224 days <br />0.538 hours <br />0.0032 weeks <br />7.362675e-4 months <br />, the 'A' reactor feedpump tripped due to a faulty suction
- I pressure switch. Both reactor recirculation pumps ranback por design, reactor pressure vessel level increased to 40 inches and retumed its normal 35 inches, and power stabitzed at 77%
RTP. The faulty pressure switch was replaced and power was restored to 100% RTP at 0750 1
hours on AprH 25,1995.
On AprN 27,1995, at 1447 hours0.0167 days <br />0.402 hours <br />0.00239 weeks <br />5.505835e-4 months <br />, power was reduced to 95% RTP due to high turbine i
backpressure. Power was restored to 100% RTP at 0017 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> on AprH 28,1995.
Unit 1 ended this operating period at 100% of RTP.
11.
Challenoes to Main Steam Safety Relief Valves l:
There were no challenges to the Main Steam Safety Relief Valves during the month of Apri.
j l
.1 QVEROGE DOILV UNIT POWER LEUEL
~
' -e DOCKET NO. 50 - 352 UNIT LIMERICK UNIT 1 DATE MAY 11 1995 COMPANY PECO ENERGY COMPANY DAVID R.
HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 MONTH APRIL 1995 DAY AVERAGE OAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MwE-NET) 1 1061 17 1036 2
1013 18 1024 3
1058 19 975 4
1044 20 1024 5
1066 21 1025 6
1062 22 1017 7
1054 23 1033 8
1062 24 992 9
1037 25 985 10 1054 26 1025 11 1042 27 1005 12 1008 28 1026 13 1029 29 1029 14 1037 30 1030 s
15 1033 16 1033 i
I l
l t
l
OPEROTING DOVQ REPORT DOCKET NO. 50 - 352 DATE MAY 11, 1995 COMPLETED BY PECO ENERGY COMPANY DAVID R.
HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 OPERATING STATUS 1
UNIT NAME: LIMERICK UNIT 1
( NOTES: THERE WAS 1 LOAD DROP 2.
REPORTING PERIOD:
APRIL. 1995
' GREATER THAN 20% THIS MONTH
- 3. LICENSED THERMAL POWER (MwT):
3293 DUE TO A REACTOR FEEDPUMP TRIP 4 NAMEPLATE RATING (GROSS MwE):
1092
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1055 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): lb92 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
Ib5b 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH VR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719 2.879 81.023
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2.859.5 66 967
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 719.b 2.841.2 65.866.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2.349.718 9.305.436 203.621.974
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 766.2bb 3.b42.bbb bkI226.78b-
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 741.991 2.942.605 63.586.611
-=
PAGE 1 OF 2
--.-.ew--*,--en.-..%d.-+wu---*
= --- -------- -
m m $
em<r
,6
--y-
,---4--
..e--
w w.
.-w.s
,,w-wien
.-s w
v--r a
~;
OPERQTING DATO REPORT (CONTINUED)
DOCKEY NO. 30 - 352 DATE MAY 11 1995 THIS MONTH VR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 98.7 81.3
- 20. UNIT AVAILABILITY FACTOR 100.0 98.7 Rt.3
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 97.8 96.9 74.4
- 22. UNIT CAPACITY FACTOR (USING DER NET) 97.8 96.9 74.4
- 23. UNIT FORCED OUTAGE RATE O.0 1.3 4.1 24 5HUTDOWNS SCHEDULED OVER NEXT 6 MONTMS (TYPE. DATE. AND DURATION OF EACH):
A 4 DAY PLANNED OUTAGE IS SCHEDULED fos; May 7 1995 FOR BOP ISSUES: DRAIN COOLER HEPAIR AND CONDENSER CLEANING.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITV 12/19/84 12/22/84 INITIAL ELECTRICITY MID APRIL 85 4/13/85 COMMERCIAL OPERATION IST QTR 86 2/01/86 PAGE 2 OF 2
-.a
UNIT SNUTDOWNS CWD POWER REDUCTIONS DOCCIET NO. 50 - 3S2 UNIT NAME LIMERICK UNIT 1 DATE MAY 11 1995 REPORT MONTH APRIL, 1995 COMPLETED BY PECO ENERGY COMPANY DAVID R.
HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1)L (HOURS)
(2)
REACTOR (3)
REPORT *
(4)
(5)
PREVENT RECURRENCE 55 950404 S
000.0 B
4 N/A HC HTEXCH REACTOR POWER WAS eZDUCED TO 97.5% DUE 4
TO HIGH TURBINE BACK PRESSURE.
4 56 950409 S
000.0 B
4 N/A HA VALVEX REACTOR POWER WAS REDUCED TC 92% FOR 4
MAIN TURBINE VALVE TESTING.
4 57 950409 5
000.0 B
4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 96% DUE 4
TO HIGH TURBINE BACK PRESSURE.
4-58 950411 F
000.0 A
4 N/A HH HTEXCH REACTOR POWER WAS REDUCED TO 90% DUE TO 4
DRAIN COOLER TUBE LEAK.
4 59 950412 S
000.0 B
4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 90% DUE TO 4
HIGH TURBINE BACK PRESSURE.
4 60 950419 S
000.0 B
4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 88% DUE TO 4
HIGH TURBINE BACK PRESSURE.
4 61 950422 S
000.0 B
4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 88% DUE TO 4
HIGH TURBINE BACK PRESSRE.
4 1
62 l 950424 F
000.0 A
4 N/A CM PUMPXX l REACTOR POWER WAS REDUCED TO 77% DUE TO 4
t t
(1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
' FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE i
i w
w-
-+ -
m
,n-
-..---+-w
-=
r w
w
%v-s m
2 m
u
x UNIT SHUTDOWNS AND POWER REDUCTIONS DOCCET NO. 50 - 352 UNIT NAME LIMERICK.
UNIT-1 g
-=
DATE MAY 11 1995 7
REPORT MONTH APRIL. 1995 COMPLETED BY PECO ENERGY COMPANY DAVID R.
HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) T18-3TT2 METHOD OF LICENSEE SYSTEM : COMPONENT CAUSE AND CORRECTIVE
'I -
TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1).
(HOURS)!
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE REACTOR FEEDPUMP TRIP.
4 63 950427 5
000.0 8
4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 95% DUE TO 4
+
i HIGH TURBINE BACM PRESSURE.
4 4
i t
i (1)
(2)
(3)
(4)
F = FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EOUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0181)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE
'(5)
- [
G - OPERATIONAL ERROR (EXPLAIN)
H-OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE i
1
'i i.
t m
m
_.. ~.,,,,,.
..w.u
...w
,,..m
- w-
.-+s
.,,y.e-i~.
v1me,.
we
-ce-..
s..
,m.,
.r,e m
.,. = _ _ _ _ _ _
m
~t' Docket No. 50-353 Attachment to Monthly.
Operating Report for Apr51995 Limerick Generating Station Unit 2 April 1 through AprH 30,1995 1.
Narrative Summary of Operating Experiences Unit 2 began the month of AprH at a nominal 100% of rated thermal power (RTP).
On AprH 2,1995, at 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />, power was reduced to 75% RTP for a control rod pattom adjustment and main turbine valve testing. Power was restored to 100% RTP at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />.
On AprH 4,1995, beginning at 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br />, power was reduced a number of times due to high turbine backpressure, to a minimum of 88% RTP. Power was restored to 100% RTP at 0040 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> on Apru 5,1995.
On AprH 9,1995, beginning at 1550 hours0.0179 days <br />0.431 hours <br />0.00256 weeks <br />5.89775e-4 months <br />, power was reduced a number of times due to high turbine backpressure, to a minimum of 95% RTP. Power was restored to 100% RTP at 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br />.
On April 19,1995, beginning at 1635 hours0.0189 days <br />0.454 hours <br />0.0027 weeks <br />6.221175e-4 months <br />, power was reduced a number of times due to high turbine backpressure, to a minimum of 95% RTP. Power was restored to 100% RTP at 2237 hours0.0259 days <br />0.621 hours <br />0.0037 weeks <br />8.511785e-4 months <br />.
9 On AprH 22,1995, at 1310 hours0.0152 days <br />0.364 hours <br />0.00217 weeks <br />4.98455e-4 months <br />, power was reduced to 95% RTP due to high turbine backpressure. Power was restored to 100% RTP at 1443 hours0.0167 days <br />0.401 hours <br />0.00239 weeks <br />5.490615e-4 months <br />.
On AprH 29,1995, at 0455 hours0.00527 days <br />0.126 hours <br />7.523148e-4 weeks <br />1.731275e-4 months <br />, the 'B' motor-generator drrse motor breaker opened, resulting in the trip of the 'B' reactor recirculation pump. The cause of this trip was due to a low lube ou pressure trip. Power was reduced, per procedure, and power was stabuized at 27% RTP. Lube oH pressure was increased and the motor generator set was started. Power was restored to 100% RTP at 0026 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br /> on AprH 30,1995.
On AprH 30,1995, at 2011 hours0.0233 days <br />0.559 hours <br />0.00333 weeks <br />7.651855e-4 months <br />, power was reduced to 91% for a control rod pattem adjustment. Power was restored to 100% RTP at 2355 hours0.0273 days <br />0.654 hours <br />0.00389 weeks <br />8.960775e-4 months <br />.
Unit 2 ended this operating period at 100% of RTP.
11.
Challenges to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of Aprl.
i
\\
1 AVERACE DOILY UNIT PODER LEVEL DOCKET NO. 50 - 353 UNIT LIMERICK UNIT 2 DATE MAY 11, 1995 COMPANY PECO ENERGY COMPANY
.-~~-.
DAVID R.
HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 MONTH APRIL 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 1133 17 1126 2
1031 18 1114 3
1129 19 1106 4
1080 20 1131 5
1133 21 1102 6
1132 22 1114 7
1120 23 1123 8
1128 24 1122 9
1112 25 1122 10 1130 26 1118 11 1130 27 1110 12 1118 28 1118 13 1126 29 617 14 1122 30 1113 15 1126 16 1122
wu 3
v -1..
I OPERATING DQVO REPORT 6
i DOCKET NO. 50 - 353 DATE MAY 11 1995 COMPLETED BY PECO ENERGY COMPANY DAVID R.
HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION.
TELEPHONE (610) 718-3772 OPERATING STATUS
- 1. UNIT NAME: LIMERICK UNIT 2 NOTES: THERE WERE 2 LOAD DROPS 4
2.
REPORTING PERIOD:
APRIL. 1995 GREATER THAN 20% THIS MONTH'
- 3. LICENSED THERMAL POWER (MwT):
3458 DUE TO ROD PATTERN ADJUSTMENT 4 NAMEPLATE RATING (GROSS MWE):
1163 AND REACTOR RECIRCULATION 1
5.
DESIGN ELECTRICAL RATING (NET MWE):
11
-PUMP TRIP.
t "f
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MwE): 1155
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MwE):
1115 i
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS -
9.
POWER LEVEL TO wHICH RESTRICTED, IF ANY (NET MWE):
{
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
'i
- 11. HOURS IN REPORTING PERIOD 719
-2.879 46.535
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0-2.359.4 41.722.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
-r
- 14. HOURS GENERATOR ON-LINE 719.b 2 h51.8 '
40.856.7
- 15. UNIT RESERVE SHUTDOWN HOURS OO OO O.0
--- =
i
- 16. GROSS THERMAL ENERGY GENERATED (MwH) 2.446.284 6.508.539 128.738,122
- 17. GROSS ELECTRICAL ENERGY GENERATED (MwH) 817.700
- 2.159.900 42.543.480-
- 18. NET ELECTRICAL ENERGY GENERATED (MwH) 792.169 2.081.386 40.983.586.
PAGE 1 OF 2 a
1 L
m
. 4
.s.
a a m
_._:n.m_.__--__..--,.___-_.m
.a-m -
m $ s-7 p
ye 4
y e
'ytv ww w-y+
ygw
b OPERATING DATA REPORT (CONTINUED)
DOCKEV NO. 50 - 333 T
.eee_--
DATE MAY 11, 1995
_ - =
THIS MONTH YR-TO-DATE CUMULATIVE
{
- 19. UNIT SERVICE FACTOR 100.0 78.2 87.8 l
- 20. UNIT AVAILABILITY FACTOR 100.0 78.2 87.8
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 98.8 65.5 83.3
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.8 65.5 83.3
- 23. UNIT FORCED OUTAGE RATE O.0 3.4 3.5 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 08/12/89 08/12/89 INITIAL ELECTRICITY 09/01/89 09/01/89 COMMERCIAL OPERATION 02/01/90 01/08/90 PAGE 2 OF 2
y
+
2 3
UNIT SHUTDOWNS sMD POWER REDUCTIONS DOCKET NO. 50 - 353 i
UNIT NAME LIMERICK UNIT 2 DATE MAY 11 1995 REPORT WONTH APRIL. 1995 COMPLETED BV PECO ENERGY COMPANY DAVID R.
HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 METHOD OF LICENSEE SYSTEM COMPONENT ' CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE COOE ACTION TO NO.
DATE (1)!
(HOURS)
(2)
REACTOR (3)
REPORT *
(4)
(5)
PREVENT RECURRENCE j
42 950402 S
000.0 B
4 N/A RB CONROD REACTOR POWER WAS REDUCED TO 75% DUE TO 4
CONTROL ROD PATTERN ADJUSTMENT AND MAIN 4
TURBINE VALVE TESTING.
4 i
43 950404 S
000.0 B
4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 88% DUE TO 4
HIGH TURBINE BACK PRESSURE.
4 44 950409 5
000.0 B-4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 95% DUE TO 4
HIGH TURBINE BACK PRESSURE.
4 45 950419 5
000.0 8
4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 95% DUE TO 4
HIGH TURBINE BACK PRESSURE.
4 43 950422 S
000.0 B
4 N/A HC HTEXCH REACTOR POWER WAS REDUCED TO 95% DUE TO 4
HIGH TURBINE BACK PRESSURE.
4 47 950429 F
000.0 A
4 N/A CB PUMPXX REACTOR POWER WAS REDUCED TO 27% DUE TO 4
REACTOR RECIRC PUMP TRIP.
4 48 950430 S
000.0 B
4 N/A RB CONROD P ".* CTOR POWER WAS REDUCED TO 91% OUE TO 4
CONTROL ROD PATTERN ADJUSTMENT.
4 1
4 t
(1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE m-4 wt
- e--
m--
4 f *-
"91p-+
--'W-
'-uw-^
vt T
v me--
-+
- msd