Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20100L931 + (10:34:25, 13 December 2024)
- ML20100L927 + (10:34:26, 13 December 2024)
- ML20100L925 + (10:34:27, 13 December 2024)
- ML20100L918 + (10:34:28, 13 December 2024)
- ML20100L913 + (10:34:30, 13 December 2024)
- ML20100L909 + (10:34:31, 13 December 2024)
- ML20100L905 + (10:34:33, 13 December 2024)
- ML20100L904 + (10:34:34, 13 December 2024)
- ML20100L900 + (10:34:35, 13 December 2024)
- ML20100L897 + (10:34:37, 13 December 2024)
- ML20100L896 + (10:34:38, 13 December 2024)
- ML20100L889 + (10:34:38, 13 December 2024)
- ML20100L880 + (10:34:40, 13 December 2024)
- ML20100L886 + (10:34:40, 13 December 2024)
- ML20100L877 + (10:34:41, 13 December 2024)
- ML20100L876 + (10:34:42, 13 December 2024)
- ML20100L873 + (10:34:43, 13 December 2024)
- ML20100L872 + (10:34:44, 13 December 2024)
- ML20100L863 + (10:34:46, 13 December 2024)
- 2CAN029606, Forwards 1995 Primary Coolant I-131 Dose Equivalent Activity Rept,Providing Results of Activity Analysis in Which Primary Coolant Exceeded Limits of TS 3.4.8 on 950107 & 0901 + (10:34:46, 13 December 2024)
- ML20100L855 + (10:34:47, 13 December 2024)
- ML20100L850 + (10:34:48, 13 December 2024)
- ML20100L838 + (10:34:49, 13 December 2024)
- ML20100L837 + (10:34:50, 13 December 2024)
- ML20100L835 + (10:34:51, 13 December 2024)
- 05000254/LER-1996-004-01, :on 960130,HPCI Sys Declared Inoperable Due to Gland Exhauster Breaker Trip.Hpci Gland Exhauster Breaker Replaced & Tested for Proper Operation & AOP Time Delay Bypass Switches in Starting Circuit Replaced + (10:34:53, 13 December 2024)
- ML20100L827 + (10:34:54, 13 December 2024)
- ML20100L814 + (10:34:57, 13 December 2024)
- ML20100L797 + (10:34:58, 13 December 2024)
- ML20100L796 + (10:34:59, 13 December 2024)
- ML20100L786 + (10:35:00, 13 December 2024)
- ML20100L794 + (10:35:00, 13 December 2024)
- ML20100L773 + (10:35:01, 13 December 2024)
- ML20100L760 + (10:35:03, 13 December 2024)
- ML20100L754 + (10:35:04, 13 December 2024)
- ML20100L756 + (10:35:04, 13 December 2024)
- ML20100L749 + (10:35:05, 13 December 2024)
- ML20100L741 + (10:35:06, 13 December 2024)
- ML20100L740 + (10:35:07, 13 December 2024)
- RBG-20557, Interim Deficiency Rept DR-274 Re Field Wiring to Asco & Target Rock Corp Solenoid Valves.Next Rept Will Be Provided by 850412 + (10:35:08, 13 December 2024)
- ML20100L723 + (10:35:09, 13 December 2024)
- ML20100L715 + (10:35:10, 13 December 2024)
- RBG-20559, Interim Deficiency Rept DR-246 Re Linear Indication & Min Wall Thickness of Bf Shaw Shop Weld.Initially Reported on 850219.Investigations Continuing.Next Rept Will Be Provided by 850410 + (10:35:11, 13 December 2024)
- RBG-20540, Interim Deficiency Rept DR-273 Re Relocation of Rosemount Pressure Transmitters.Next Rept Will Be Provided by 850412 + (10:35:12, 13 December 2024)
- 05000302/LER-1984-020, :on 841103,gas Grab Sample Analysis Required by Tech Specs Not Performed within 6 H of Exceeding 15% Rated Power.Personnel Will Be Reinstructed in Requirements of Surveillance Plan + (10:35:14, 13 December 2024)
- LIC-96-0031, Forwards NRC Form 536 Re RO & SRO Licensing Exam Data for Plant,Including Estimate of Number of Candidates to Undergo Ro/Sro License Exams During Each Assigned Visit to Plant for FY96 Through FY99,as Requested in Administrative Ltr 96-01 + (10:35:16, 13 December 2024)
- RBG-20487, Final Deficiency Rept DR-271 Re RTD Splices in Electrical Penetrations Supplied by Conax Corp.Initially Reported on 850320.Nonconformance & Disposition & Engineering & Design Coordination Repts Required Repairs Using New Butt Splices + (10:35:16, 13 December 2024)
- ML20100L658 + (10:35:17, 13 December 2024)
- W3P84-3414, Defines Required Actions & Provides Commitments for Completion of Actions Re Cracks in Structure Common Foundation Basemat.Monitoring & Surveillance Program for Basemat Will Be Submitted Prior to Exceeding 5% Power + (10:35:18, 13 December 2024)
- TXX-4366, Advises That Facility Used Portions of ASME Boiler & Pressure Vessel Code Contained in Winter 1982 Addenda to 1980 Edition & in 1983 Edition,Per NRC 841114 Request + (10:35:19, 13 December 2024)
- ML20100L638 + (10:35:20, 13 December 2024)