ML20100L837

From kanterella
Jump to navigation Jump to search
Forwards Table Indicating Low Level of Public Interest & Comments on Proposed Amends Issued Pursuant to Sholly. Statistics Cover 830506-1122
ML20100L837
Person / Time
Site: Salem, Grand Gulf, Pilgrim, Susquehanna, Turkey Point, 05000000, Crane
Issue date: 12/07/1983
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20100L763 List:
References
FOIA-84-148 NUDOCS 8412120102
Download: ML20100L837 (2)


Text

.

stt* * %:, -

'D UNITED STATES

[}Qg%i, NUCLE AR REGULATORY COMMISSION WASHINGTO N, D. C. 20555

- o b.-g[

S, *kb December 7, 1933 e

o....

MEMORANDUM FOR:

William J. Dircks Executive Director for Operations FROM:

Harold R. Denton, Director Office of Nuclear Reactor Regulation SU5 JECT:

"SHOLLY" STATISTICS Attached for your information is a table indicating a very low level of public interest and comments on proposed amendments issued pursuant to

" Shelly".

The statistics cover the period May 6 through November 22, 1983.

A request for hearing has been received on the Salem notice regarding extending the interval for the second inservice integrated leak rate test.

One addi-ticnal ccament was received on TMI-1 as a result of publication on August 25, 1953 of a Notice of Additional Opportunity.

Two requests for a hearing were t

received on the Turkey ' Point Units 3 and 4 notice related to proposed oper-ational-iimits for current and futur-e' reioads.

One comment was received on the Susquehanna notice on ESW pump load sequence timers.

Since May 6, we have processed about 800 items for notice and comment', of which cnly four of tne proposed no-significant-hazards-consideration finding have resulced in either comments or requests for hearing.

As of October 26, there rer.:ained 232 items yet to be noticed, with the backlog completely eliminated for a few plants.

After a full year, I plan to determine'whether we should

. seek legislative changes in this area.

l Mw Harold R. Denton, Director Office of Nuclear Reactor Regulation

Enclosure:

As stated cc:

F.egional Administrators OELD IE 8412120102 840606 PDR FOIA BELLS 4-148 PDR W

~

.-*.'N-

~+-

+

"S ll 0 L.L 'Y" I; I S T 0 R Y' ij

.~

MAY 6 - Nov. 22, 1983 -

FRN-PRoroSED NSilC S ll C TOTAL

~

IluMBER 799 11 810 Punlic COMMENTS Received

'll".

IIA 11 REQUESTS FOR llEARillo 2 TMl-1 (SG) 1 (PILGRIM 6'

1 SAteM-1 (C tig. GENT h

2 TURKEY PT; 3P.Il (CORE LIMITS) i W

AMENDMENTS

  • ISSUED 185 i

IIEARING REQUESTED BUT FINAL j

i' i

HSilC DETERMINATION MADE

' 2"*

AND AMENDMENT ISSUED A.-

~

7

" 8 - TMI-l SG, 2 GRAND GULF-1 IIPCS SETP0lNT,1 SUSQUEllANNA-1 EMERGENCY SERVICE WATER TIMERS

  • I - PARTI AL AMENDMENT FOR Till-1 SG 1 AMENDMENT FOR SALEM-1 c0NTAINMENT TESTING i

~

,