Attachment IV to GNRO-96/000 2 0 Page1of1 FAILED FUEL INDICATIONS / INSPECTIONS - 1995 <

l Failed fuel assessments performed during Cycle 8 indicate a single, medium-sized fuel failure exists in the Grand Gulf core. I i

The failure occurred on 9/9/95. Fuel Reliability Index peaked at 3061 pCi/sec and leveled at about 1000 pCi/sec.

The failure appears to be in a second cycle bundle in core cell location 32-27. This cell contains two second cycle bundles. Current plans are to discharge both of these bundles during RFO8 (October 1996).