ML20100L754
From kanterella
Jump to navigation
Jump to search
ML20100L754 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 12/31/1995 |
From: | ENTERGY OPERATIONS, INC. |
To: | |
Shared Package | |
ML20100L752 | List: |
References | |
NUDOCS 9603050037 | |
Download: ML20100L754 (1) | |
Similar Documents at Grand Gulf | |
---|---|
Category:ANNUAL OPERATING REPORT
MONTHYEARML20207A8301998-12-31031 December 1998
[Table view]1998 Annual Operating Rept for Ggns,Unit 1 ML20155J0811998-05-31031 May 1998 10CFR50.59 SE for Period Jan 1997 - May 1998 ML20203H9741997-12-31031 December 1997 1997 Annual Operating Rept, for Ggns,Unit 1 ML20135D3201996-12-31031 December 1996 Annual Operating Rept for 1996, Per RG 1.16,Rev 4,Part C.1.b ML20148G1031996-12-31031 December 1996 Rept of 10CFR50.59 Safety Evaluations for Period,950701- 961231 ML20100L7541995-12-31031 December 1995 Corrected Attachment IV of 1995 Annual Operating Rept ML20097D5631995-12-31031 December 1995 Annual Operating Rept for GGNS Unit 1 for 1995 ML20095A1471995-06-30030 June 1995 Rept of 10CFR50.59 Safety Evaluations for Period Jan-June 1995 ML20080P7951994-12-31031 December 1994 Annual Operating Rept for 1994 ML20064D4521993-12-31031 December 1993 Summary of Operating Experience for 1993 ML20073T0221993-12-31031 December 1993 Rept of 10CFR50.59 Safety Evaluations for Period Jan-Dec 1993 ML20128N7611992-12-31031 December 1992 Annual Operating Rept ML20045F0551992-12-31031 December 1992 10CFR50.59 Safety Evaluation for Period 920131-1231, for Grand Gulf Nuclear Station.W/930630 Ltr ML20090D8461991-12-31031 December 1991 Annual Operating Rept for 1991 ML20101H1101991-12-31031 December 1991 Safety Evaluation Rept for Grand Gulf Nuclear Station for 1991 ML20012A0301990-02-27027 February 1990 Summary of Operating Experience 1989 ML20246G2761988-12-31031 December 1988 Summary of Operating Experience - 1988 ML20235Q9651988-12-31031 December 1988 Summary of Operating Experience - 1988 AECM-88-0117, Rept of Changes,Tests & Experiments Determined to Be Reportable Under Requirements of 10CFR50.59 for Aug-Dec 19871988-07-28028 July 1988 Rept of Changes,Tests & Experiments Determined to Be Reportable Under Requirements of 10CFR50.59 for Aug-Dec 1987 AECM-88-0048, Summary of Operating Experience - 19871987-12-31031 December 1987 Summary of Operating Experience - 1987 AECM-87-0196, Rept of Changes,Tests & Experiments Determined to Be Reportable Under Requirements of 10CFR50.59 for Jan-May 19871987-11-27027 November 1987 Rept of Changes,Tests & Experiments Determined to Be Reportable Under Requirements of 10CFR50.59 for Jan-May 1987 AECM-87-0057, Rept of Changes,Tests & Experiments Determined to Be Reportable Under Requirements of 10CFR50.59 for June-Dec 19861987-05-29029 May 1987 Rept of Changes,Tests & Experiments Determined to Be Reportable Under Requirements of 10CFR50.59 for June-Dec 1986 AECM-87-0047, Annual Operating Rept for 19861987-02-27027 February 1987 Annual Operating Rept for 1986 1998-05-31 Category:TEXT-SAFETY REPORT MONTHYEARML20217F9921999-09-30030 September 1999
[Table view]Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20212F5641999-09-23023 September 1999 SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity Limits ML20211Q3171999-09-0909 September 1999 Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 ML20216E4881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With ML20211A6921999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20209J1961999-07-12012 July 1999 Special Rept 99-001:on 990528,smoke Detectors Failed to Alarm During Performance of Routine Channel Functional Testing.Applicable TRM Interim Compensatory Measure of Establishing Roving Hourly Fire Patrol Was Implemented ML20196K4981999-07-0101 July 1999 Safety Evaluation Authorizing PRR-E12-01,PRR-E21-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01.Concludes That Alternatives Proposed by EOI Acceptable ML20209G0691999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20196A1161999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Grand Gulf Nuclear Station.With ML20206Q4831999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Grand Gulf Nuclear Station Unit 1.With ML20206J1201999-04-30030 April 1999 Redacted ME-98-001-00, Pressure Locking & Thermal Binding Test Program on Two Gate Valves with Limitorque Actuators ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205P8771999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20207K5141999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20206T7991999-01-31031 January 1999 Iodine Revolatizitation in Grand Gulf Loca ML20207A8301998-12-31031 December 1998 1998 Annual Operating Rept for Ggns,Unit 1 ML20206R9501998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20206D7721998-12-31031 December 1998 South Mississippi Electric Power Association 1998 Annual Rept ML20198E2481998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20195F4121998-11-13013 November 1998 Rev 16 to GGNS-TOP-1A, Operational QA Manual (Oqam) ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program ML20195C2791998-11-0505 November 1998 BWR Feedwater Nozzle Inservice Insp Summary Rept for GGNS, NUREG-0619-00006 ML20195F4801998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20155C1351998-10-26026 October 1998 Rev B to Entergy QA Program Manual ML20154K2391998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Grand Gulf Nuclear Station Unit 1.With ML20155F1961998-09-0101 September 1998 Engineering Rept for Evaluation of BWR CR Drive Mounting Flange Cap Screw ML20153B2161998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Grand Gulf Nuclear Station,Unit 1.With ML20237B6661998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Grand Gulf Nuclear Station,Unit 1 ML20236R0231998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Grand Gulf Nuclear Station,Unit 1 ML20155J0811998-05-31031 May 1998 10CFR50.59 SE for Period Jan 1997 - May 1998 ML20249B1251998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Grand Gulf Nuclear Station,Unit 1 ML20248B6261998-05-11011 May 1998 Rev 6 to Grand Gulf Nuclear Station COLR Safety-Related ML20217Q6701998-05-0606 May 1998 SER Approving Proposed Postponement of Beginning Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) at Grand Gulf for Circumferential Shell Welds for Two Operating Cycles ML20206J1271998-04-30030 April 1998 Pressure Locking Thrust Evaluation Methodology for Flexible Wedge Gate Valves ML20247F3591998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Grand Gulf Nuclear Plant,Unit 1 ML20217M8951998-04-30030 April 1998 QA Program Manual ML20217P8281998-04-0707 April 1998 Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) ML20217P0381998-04-0606 April 1998 Safety Evaluation Supporting Amend 135 to License NPF-29 ML20217A0291998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Grand Gulf Nuclear Sation,Unit 1 ML20216J4211998-03-18018 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Grand Gulf Nuclear Station ML20216J2021998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Grand Gulf Nuclear Station,Unit 1 ML20203A2891998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Grand Gulf Nuclear Station ML20247B4111997-12-31031 December 1997 1997 Annual Financial Rept for South Mississippi Electric Power Association ML20203H9741997-12-31031 December 1997 1997 Annual Operating Rept, for Ggns,Unit 1 ML20198P1121997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Grand Gulf Nuclear Station,Unit 1 ML20203B5581997-12-0404 December 1997 Special Rept 97-003:on 971111,valid Failure of Div 2 EDG Occurred,Due to Jacket Water Leak.Failure Reported,Per Plant Technical Requirements Manual Section 7.7.2.2 ML20203K4031997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Grand Gulf Nuclear Station,Unit 1 ML20199H3711997-11-19019 November 1997 SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50 ML20199F3431997-11-18018 November 1997 SER Accepting Rev 15 of Operational Quality Assurance Manual for Grand Gulf Nuclear Station,Unit 1 1999-09-09 |
Text
= .. .. . _ . . . . . ...
s
- I -
Attachment IV to GNRO-96/000 2 0 Page1of1 FAILED FUEL INDICATIONS / INSPECTIONS - 1995 <
l Failed fuel assessments performed during Cycle 8 indicate a single, medium-sized fuel failure exists in the Grand Gulf core. I i
The failure occurred on 9/9/95. Fuel Reliability Index peaked at 3061 pCi/sec and leveled at about 1000 pCi/sec.
The failure appears to be in a second cycle bundle in core cell location 32-27. This cell contains two second cycle bundles. Current plans are to discharge both of these bundles during RFO8 (October 1996).
1 I
I l
I
- gR88uM8Sjh6 R
Retrieved from "https://kanterella.com/w/index.php?title=ML20100L754&oldid=2777006"