ML20100L754

From kanterella
Jump to navigation Jump to search
Corrected Attachment IV of 1995 Annual Operating Rept
ML20100L754
Person / Time
Site: Grand Gulf 
Issue date: 12/31/1995
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20100L752 List:
References
NUDOCS 9603050037
Download: ML20100L754 (1)


Text

=..

s I

Attachment IV to GNRO-96/000 2 0 Page1of1 FAILED FUEL INDICATIONS / INSPECTIONS - 1995 Failed fuel assessments performed during Cycle 8 indicate a single, medium-sized fuel failure exists in the Grand Gulf core.

i The failure occurred on 9/9/95. Fuel Reliability Index peaked at 3061 pCi/sec and leveled at about 1000 pCi/sec.

The failure appears to be in a second cycle bundle in core cell location 32-27. This cell contains two second cycle bundles. Current plans are to discharge both of these bundles during RFO8 (October 1996).

gR88uM8Sjh6 R