Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20112F774 + (05:49:07, 13 December 2024)
- ML20112F772 + (05:49:08, 13 December 2024)
- ML20112F769 + (05:49:10, 13 December 2024)
- ML20112F768 + (05:49:11, 13 December 2024)
- 05000454/LER-1996-003-09, :on 960507,safety Injection Pump Exceeded Max Flow.Caused by Defective Procedure.Developed Correlation Between Pump Suction Parameters & Flow + (05:49:13, 13 December 2024)
- ML20112F760 + (05:49:15, 13 December 2024)
- SNRC-1124, Informs of Intent to Proceed W/Drilling of Three Wells to Satisfy Requirements of Groundwater Monitoring Program of Environ Protection Plan.Program Will Determine Effect of Fresh Water Consumption on Groundwater Levels & Quality + (05:49:15, 13 December 2024)
- HL-5181, Requests That NRC Grant Encl Requests RR-15 & RR-16,per 10CFR50.55a(g)(6)(i).Requests for Relief Will Be Added to ISI Program Document W/Next Rev + (05:49:17, 13 December 2024)
- 1CAN038507, Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept + (05:49:17, 13 December 2024)
- ML20112F747 + (05:49:18, 13 December 2024)
- ML20112F743 + (05:49:19, 13 December 2024)
- 05000395/LER-1996-005, :on 960517,ESFs Steam Line Isolation Signal Inadvertently Generated.Caused by Cognitive Personnel Error. Technician Verbally Counseled + (05:49:21, 13 December 2024)
- ML20112F731 + (05:49:23, 13 December 2024)
- ML20112F734 + (05:49:23, 13 December 2024)
- ML20112F729 + (05:49:25, 13 December 2024)
- ML20112F728 + (05:49:26, 13 December 2024)
- ML20112F725 + (05:49:27, 13 December 2024)
- HL-5166, Requests Exemption from 10CFR70.24(a), Criticality Accident Requirements, Requirements for Units 1 & 2.Criticality Accident Monitoring Sys Unnecessary + (05:49:28, 13 December 2024)
- 3F0696-07, Withdraws NRC Staff Review & Approval of Inservice Testing Revised Relief Request V-129,per NRC Ltr + (05:49:29, 13 December 2024)
- BSEP-96-0219, Informs That CP&L Will Provide Written Responses to NRC 960418 RAI Relating to CP&L 950630 Submittal Re GL 88-20, Suppl 4, IPE of External Events (IPEEE) for Severe Accident Vulnerabilities,10CFR50.54(f) by 960816 + (05:49:30, 13 December 2024)
- HL-5178, Provides Response to Third IST Interval Program Update SER Submitted w/960412 Ltr + (05:49:31, 13 December 2024)
- NRC-85-2995, Requests Review of WCAP-9561,Addendum 1, Addendum to Bart A1:Computer Code for Best Estimate Analysis of Reflood Transients, in Support of Anticipated Startup in Late Mar 1985 + (05:49:31, 13 December 2024)
- ML20112F703 + (05:49:33, 13 December 2024)
- ML20112F700 + (05:49:34, 13 December 2024)
- ML20112F693 + (05:49:35, 13 December 2024)
- ML20112F690 + (05:49:36, 13 December 2024)
- AECM-84-0529, Special Rept 84-37/0:on 841129,loose Parts Detection Sys Declared Inoperable for 30 Days Per Tech Specs.Caused by High Alarm Which Sealed in W/No Loose Parts Present.Matter Under Investigation for Corrective Action + (05:49:37, 13 December 2024)
- ML20112F684 + (05:49:38, 13 December 2024)
- 3F1284-04, Special Rept SR-84-5:on 841029,Halon Portion of Fire Suppression Sys for Cable Spreading Room Taken Out of Svc for Mod to Cable Spreading Room.Sys Will Be Out of Svc Periodically During Mod for Welding in Cable Spreading Room + (05:49:39, 13 December 2024)
- ML20112F677 + (05:49:43, 13 December 2024)
- ML20112F671 + (05:49:46, 13 December 2024)
- ML20112F669 + (05:49:47, 13 December 2024)
- ML20112F666 + (05:49:48, 13 December 2024)
- ML20112F665 + (05:49:49, 13 December 2024)
- ML20112F663 + (05:49:52, 13 December 2024)
- ML20112F657 + (05:49:53, 13 December 2024)
- ML20112F652 + (05:49:53, 13 December 2024)
- 05000293/LER-1977-031-01, /01X-1:on 770912,base Metal of CRD Return Line Nozzle Penetrated During Grind Out of Indication.Caused by thermal-induced Fatigue Cracking.Crd Line Removed from Sys + (05:49:55, 13 December 2024)
- ML20112F641 + (05:49:57, 13 December 2024)
- ML20112F636 + (05:49:57, 13 December 2024)
- ML20112F634 + (05:49:58, 13 December 2024)
- ML20112F631 + (05:49:59, 13 December 2024)
- 05000331/LER-1984-044, :on 841207,fire Hose Inoperable.Caused by Maint Activities.Special Wye Fitting Placed on Hose Station 22 to Route Water to Fire Hose + (05:50:01, 13 December 2024)
- NLS8500052, Forwards Vols 1 & 2 to Rev 3 to GE Inservice Insp Program for ASME Class 1,2 & 3 Components. Program Contains One Addl & One Altered Relief Request.Revs to Document Will Not Be Forwarded to NRC W/O Specific Request + (05:50:02, 13 December 2024)
- ML20112F628 + (05:50:03, 13 December 2024)
- 05000483/LER-1984-063, :on 841209,ESF Inadvertently Actuated.Caused by Spurious Signals from Control Room Radiation Monitor. Radiation Monitor Returned to Svc + (05:50:05, 13 December 2024)
- ML20112F619 + (05:50:07, 13 December 2024)
- ML20112F622 + (05:50:07, 13 December 2024)
- ML20112F618 + (05:50:08, 13 December 2024)
- 05000331/LER-1984-043, :on 841206 & 850102,control Room Intake Standby Filter Unit Initiated.Caused by Low Inlet Air Temp Setpoint. Preheat Coils Repaired + (05:50:10, 13 December 2024)
- ML20112F614 + (05:50:11, 13 December 2024)