ML20112F669
| ML20112F669 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/07/1984 |
| From: | Foster D GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| GN-492, NUDOCS 8501150465 | |
| Download: ML20112F669 (1) | |
Text
Georgia Power Company Route 2, Box 299A Waynesboro, Georg:a 30830 Telephone 404 554-9961. Ext. 3360 404 724 8114. Ext. 3360 OE0I3 P l: g Geo iaPower
- o. o. ro.i.,.
Vice Pres 2 dent and Project General Manager the southern eiectre system Vogtte Project December 7, 1984 United States Nuclear Regulatory Commission Office of Inspection and Enforcement File: X7BG03-M71 Region-II -' Suite 2900 Log:
GN-492 101 Marietta Street Atlanta, Georgia 30323
^
Reference:
Vogtle Electric Generating Plant-Units 1 and 2; 50-424, 50-425; Cable Separation Attention: Mr. James P. O'Reilly On November 8, 1984, Mr. - R.
E.
Folker of Georgia Power Company
" contacted Mr. W. H. Rankin of the USNRC concerning the above referenced subject.
At this time, statistical and technical information is being gathered to assist in an engineering evaluation of this concern. Georgia Power Company will submit a schedule for the comletion of this evaluation to the NRC on or about February 22, 1985.
This response contains no proprietary information and may be placed
.in the NRC Public Document Room.
/
Yours truly/
[
~
'. Fost r REF/D0F/tdm xc _:
U. S. Nuclear Regulatory Commission Document Control Desk LWashington, D. C.
20555
-R.
J. Kelly J. A. Bailey G. Bockhold R. E. Conway O. Batum P. D. Rice G. F. Head ~
H. H. Gregory C. S. McCall (OPC)
_J. T. Beckham W.'T. Nickerson E. L. Blake, Jr.
R..A.. Thomas D. R. Altman
'(Shaw, et. al. )
D. E. Dutton D. L. Kinnsch (BPC)
J. E. Joiner W. F. Sanders (NRC)
J. L. Vota (W)
(Troutman, et. al.)
R. H. Pinson L. T. Gucwa D. C. Teper (GANE)
B.~M. Guthrie C. E. Belflower L. Fowler (LEAF)
.E. D. Groover M. Malcom (BPC)
T. Johnson (ECP $ yrc1AT E D Oh g 7,b o
j
-