Updated Final Significant Deficiency Rept 413-414/84-01 Re Potentially Affected Piping & Downstream Welds.Crossover Isolation Valves Not Changed Out W/Alternate Valve Design. Valves Modified in Stem Design
ML20112F652
Person / Time
Site: Catawba  
Issue date: 12/11/1984
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
413-414-84-01, 413-414-84-1, NUDOCS 8501150457
Download: ML20112F652 (2)


Text

.

e-

+

N.?W

  • P.O.* BOX G3HNI

.4 CitARLOT"rN, MC.dNM HAL H. TUCKER TELEPHONE vnas reassonne (704) 073-4NH k$r #1l,.19g Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900

' Atlanta, Georgia 30303 Re: Catawba Nuclear Station Unit 1 and Unit 2 Docket Nos. 50-413 and 50-414 SD 413-414/84-01

Dear Mr. O'Reilly:

Please find attached anup-dated description of corrective actions to be taken with regard to the subject deficiency. Also please note that this deficiency has been renumbered to reflect the fact that corrective action has been extended to Unit 2.

Very truly yours,

,7 d b42 A

Hal'B. Tucker LTP/mjf Attachment cc: Director Mr. Robert Guild, Esq.

Office of Inspection and Enforcement Attorney-at-Law U. S. Nuclear Regulatory Commission P. O. Box 12097 Washington, D. C. 20555 Charleston, South Carolina 29412 NRC Resident Inspector Mr. Jesse L. Riley Catawba Nuclear Station Carolina Environmental Study Group 854 Henley Place Palmetto. Alliance Charlotte, North Carolina 28207 2135 Devine Street Columbia. South Carolina 29205

INPO Records Center-Suite 1500 1100 Circle 75 Parkway

. Atlanta, Georgia 30339 o

O501150457 e43 33 g ADOCK 0500 413 MF/CIAL COM '

pyg J

fr>7 I I

4h 4.

I Significant Deficiency 413-414/84-01 Up-dated Corrective Action December 11, 1984 f-The corrective action pertaining to the study of potentially affected

. piping and downstr'am welds remains as stated in our response of e

October 30,'1984. A resolution will be formulated and any repairs

. initiated by the first scheduled refueling outage for Catawba Unit 1.

The cross-over isolation valves addressed in the final report of October 30, 1984 will not be changed out with an alternate valve design. These valves will, instead, be modified to a packed, one piece stem design using Kerotest supplied parts. This modification

'will eliminate the vibrations that are produced in the current design during reverse flow. The new parts are scheduled for delivery the week of January 21, 1985, with valve modification to follow shortly thereafter. All modifications for Unit 1 and Unit 2 will be complete by March 1, 1985.

l J

o s

-['

e k

~

p r

e b.

h:'[.,

LE:

.