Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115D548 + (04:26:46, 13 December 2024)
- ML20115D535 + (04:26:47, 13 December 2024)
- ML20115D533 + (04:26:48, 13 December 2024)
- ML20115D530 + (04:26:48, 13 December 2024)
- ML20115D504 + (04:26:49, 13 December 2024)
- 05000298/LER-1992-015, :on 920911,RV Level Fell Below Low Level Setpoint Initiating Group 2,3 & 6 Isolations.Caused by Procedures Governing Normal Shutdown of Plant.Procedure Changes & Training Will Be Provided + (04:26:50, 13 December 2024)
- ML20115D406 + (04:26:51, 13 December 2024)
- ML20115D402 + (04:26:52, 13 December 2024)
- ML20115D388 + (04:26:53, 13 December 2024)
- ML20115D369 + (04:26:54, 13 December 2024)
- ML20115D368 + (04:26:55, 13 December 2024)
- ML20115D361 + (04:26:56, 13 December 2024)
- ML20115D351 + (04:26:57, 13 December 2024)
- ML20115D348 + (04:26:58, 13 December 2024)
- ML20115D344 + (04:26:59, 13 December 2024)
- ML20115D323 + (04:27:00, 13 December 2024)
- ML20115D337 + (04:27:00, 13 December 2024)
- LIC-96-0080, Forwards Diskette Containing PRA Model for Plant.W/O Encl + (04:27:01, 13 December 2024)
- 0CAN079604, Provides 1996-1997 Rev of ANO Emergency Instructions & State & Local Emergency Plans,Including Annex V of State of Ak Emergency Operations Plan & Plans for Conway,Johnson,Logan, Pope & Yell Counties,Per Administrative Ltr 94-07.W/o Encls + (04:27:02, 13 December 2024)
- ML20115D317 + (04:27:02, 13 December 2024)
- U-602055, Informs That Joseph C Wemlinger (License Number SOP-30504-1) No Longer Has Need for Operating License & Requests That License Status Be Changed to Expired + (04:27:03, 13 December 2024)
- L-90-012, Forwards Info Re code-rejectable Indications Found in Reactor Vessel Outlet nozzle-to-shell Welds,Per 900427 Telcon.List of Attendees from Telcon Encl + (04:27:04, 13 December 2024)
- ML20115D286 + (04:27:06, 13 December 2024)
- 1CAN109202, Monthly Operating Rept for Sept 1992 for Ano,Unit 1 + (04:27:07, 13 December 2024)
- 0CAN079602, Forwards Response to NRC Re Weakness Noted in Insp Repts 50-313/96-17 & 50-368/96-17.C/A:discussed Correct Use of Notification Procedure Forms W/Communicator at Conclusion of CR Simulator Session on 960514 + (04:27:07, 13 December 2024)
- ML20115D277 + (04:27:08, 13 December 2024)
- ML20115D266 + (04:27:09, 13 December 2024)
- ML20115D270 + (04:27:09, 13 December 2024)
- ML20115D264 + (04:27:10, 13 December 2024)
- ML20115D263 + (04:27:10, 13 December 2024)
- 2CAN109205, Forwards Rept of Number of Plugged or Sleeved SG Tubes Accomplished During Inservice Insps on 921002.Complete Results of SG Tube Inservice Insp Will Be Provided in Annual Rept by 930301 + (04:27:11, 13 December 2024)
- 2CAN109207, Monthly Operating Rept for Sept 1992 for Ano,Unit 2 + (04:27:12, 13 December 2024)
- ML20115D244 + (04:27:12, 13 December 2024)
- 2CAN109208, Summarizes 921008 Conference Call W/Nrc Re Results of Ninth Refueling Outage (2R9) SG Insps & Evaluations.During Insp of SG A,17 Circumferential Defects Detected at Top of Tubesheet of Hot Leg.No Cold Leg Indications Noted + (04:27:13, 13 December 2024)
- ML20115D230 + (04:27:14, 13 December 2024)
- ML20115D229 + (04:27:14, 13 December 2024)
- 05000254/LER-1992-020-02, :on 920921,determined That TS 3.7.A.2.a.2 Limit of 293.75 Scfh Exceeded.Cause of Excessive Leakages Cannot Be Determined Until Repairs Completed & Valves & Components Retested.Supplemental LER Will Be Issued + (04:27:16, 13 December 2024)
- ML20115D226 + (04:27:17, 13 December 2024)
- ML20115D224 + (04:27:19, 13 December 2024)
- ML20115D219 + (04:27:22, 13 December 2024)
- ML20115D213 + (04:27:24, 13 December 2024)
- ML20115D215 + (04:27:24, 13 December 2024)
- ML20115D210 + (04:27:25, 13 December 2024)
- ML20115D206 + (04:27:28, 13 December 2024)
- ML20115D203 + (04:27:29, 13 December 2024)
- ML20115D200 + (04:27:29, 13 December 2024)
- 05000374/LER-1992-013-05, :on 920917,RCIC Sys Initiated,Resulting in Vessel Injection for Approx 20 S.On 910724 & 920622,similar Injections Occurred.Caused by Pressure Transient Spike.Rcic Turbine Trip Switches Placed in Bypass + (04:27:31, 13 December 2024)
- ML20115D191 + (04:27:32, 13 December 2024)
- BSEP-96-0242, Forwards Suppl Info to 960402 Request for Amends to Licenses DPR-71 & DPR-62,allowing Uprate of Units to 105% of Rated Thermal Power + (04:27:33, 13 December 2024)
- ML20115D180 + (04:27:34, 13 December 2024)
- 3F1092-05, Forwards Rev 0 to Vols 1-2 of Inservice Exam Rept for FPC Crystal River Unit 3 1992 Isi,Refueling 8,Outage 9 + (04:27:35, 13 December 2024)