J ALTI'AORE uAS AND ELECTRIC CALVERT CLIFFS NUCLEAR POWER PLANT 1650 CALVERT CLIFFS PAPvWAY
- LUSE,. MARYLAND 20657 4702 CHARLES H. CRUSE PL ANT GENE RAL MANAGER CALVERT CLIFF S October 14,1992 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuc1 car Power Plant Unit Nos.1 & 2: Docket Nos. 50-317 & 50-318 September 1992 Operatine Data Renorts Gentlemen:
The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260 3989.
Very truly yours,
,/
. li% &
CHC/LBS!bjd
/
Attachments cc:
D. A. Brune, Esquire J. E. Silberg. Esquire R. A. Capra, NRC 1
D. G. McDonaid, Jr., NRC T. T. Martin, NRC P. R. Wilson, NRC g
bp"Jk R. I. McLean, DNR g9g J. H. Walter, PSC R. A. Hartfield, NRC 0
P. Lewis, INPO K. Larson, ANI 4?
000011
/
1 9210200488 920930 PDR ADOCK 05000317 R
PDR i
d j,
f.
1
- ~
i UNIT 1 OPERATING DATA REPORT t
Docket No. 50-317 i
October 14, 1992 l
Prepared by Leo-Shanley j
Telephone:(410)260-6744 OPERATING STATUS
?
1.
UNIT NAME Calvert Cliffs l Unit 1 SEPTEMBER 1992
- 2. REPORTING PERIOD 3
3.
LICENSED THERMAL POWER (MWT) 2700 i
- 4. NAMEPLATE RATING (GROSS MWe) 918 j
5.
DESIGN ELECTRICAL RATING (NET MWe)'
845 6.
MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860 7.
MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825 8.
CHANGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A i
- 10. REASONS FOR RESTRICTIONS N/A i
Cumulative j
This month Year-to-Date to Date i
- 11. HOURS IN REPORTING PERIOD 720 6,575 152,532
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 2,878.2 106,178.0 i-
- 15. UNIT RESERVE SHUTDOWN HOURS _
720.0 2,797.1 3,019.4 1
13.. REACTOR RESERVE SHUTDOWN HOURS u.0 10. 0
- 14. HOURS GENERATOR ON LINE
.103,847.6 0.0 0.0 0.0 j
- 16. GROSS THERMAL ENERGY GENERATED._(MWH)-
1,873,123' 7,275,736~261,612,243
- 17. GROSS. ELECTRICAL ENERGY GEN'TED(MWH) 607,908 2,395,685 86,931,373 l
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)-
581,911-2,294,634 82,650,139 l
- 19. UNIT SERVICE FACTOR
- 100.0
-4:2.5 68.1 i-
- 20. UNIT AVAIIABILITY FACTOR 100.0-42.5 68.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 98.0 42.3-65.7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 95.6 41.3 64.1
- 23. UNIT FORCED OUTAGE RATE.
0.0 4.7 9.4
. SHUTDOWNS SCHEDULED OVER THE'NEXT 24.
i SIX MONTHS (TYPE,-DATE AND DURATION):
I
-Maintenance, October 9, 1992 for 2. days
~
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
.N/A
?
l b
I i
.. _. _ _ _. ~
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKETNO.
50-31' UNITNAME Calvert Cliffs-U1 '
DATE October 14.1992 COMPLETED BY Leo Shaniev
'1T:.LEPHONE -
(410126fM744 REPORT MONTil September 1992 -
ME1110D OF
~ 51IUTI1NG LICENSEE -
CAUSE A CORRECITVE DURATION DOWN EVENT SYSTD4 COMPONENT ACITON TO NO.
DATE TYPEI (llOURS).
REASON 2 REACIOR3
' REPORT #
CODE 4
'. CODE.
- PREVENT RECURRENCE S
92 920831 F
' O.0 A
'4 N/A
'SD PSP Continucd derate at 65% while 11 Steam Generator Feed Pump was outef-service for repairs to a -
- sealwaterline.
92-06 920913' F
" 0.0 A-5 N/A SM
-RV Power reduced to repair 15A low Pressure Feedwater Heater tube side reliefvahr.'
+
e
!~
t i
- i i
1 p Forced 2 Reason:
3 Method:
4 IEEE Star.dard 805-1984 S:. Scheduled
? A-Equipment Failure 1 - Manual B - Maintenance or Test -
- 2-ManualScram. -
C-Refueling 3 - Automatic Scram.
5 IEEEStandard 803A-1983 1.
D - Regulatory Restriction 4 - Continued '
..E - Operator Trair,ing & License Examination 5-Reduced load F-Administrative '
~
9-Other '
' G - Operational Error '
H - Other 3
4
,-?w y
e e
m
~m n..--i--
-E (m
1 l
AVERAGE DAILY UNIT POWER LEVEL oco*********************************************************************
Docket No. 50-317 Calvert Cliffs Unit No. 1 October 14, 1992 Prepared by Leo Shanley Telephone: (410) 260-6744 SEPTEMBER 1992 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 705 17 845 2
762 18 843 3
716 19 843 4
712 20 844 5
716 21 844 6
809 22 845 7
810 23 846 8
800 24 854 9
824 25 858 I
10 837 26 857 11 836 27 854 12 839 28 853 13 760 29 856 14 640 30 860 15 727 16 845 4
d
4
- DOCKET NO. 50-317 CALVERT CLIFFS - UNIT 1 October 14,1992 i
SUMMARY
OF OPERATING EXPERIENCE i
September 1992 l
The unit began the month at 65% (490 MWe). Repairs were being made to 11 Steam Generator Feed Pump (SGFP) seal water line.
Repairs were completed at 0100 on September 1, but power was held at 65% at the request of Electric System Operations. The unit was releted to raise power at 0500. 97% was reached at 1440 on September 1 and held there to continue core physics testing.
At 1520 on September 2, power was reduced to repair the 12 Heater Drain Pump mechanical seal.
The unit remained at 88% (740 MWe) until 2215 on September 5. Power was then raised to 97%
(810 MWe) for core physics testing, which was completed at 0540 on September 9,100% (825 MWe) was reached at 1420.
Power was reduced to 78% (650 MWe) at 1630 on September 13 to repair a tube side relief valve on 15A Low Pressure Feed Water Heater. The unit remained in a derate until 1330 on September 15.100% (835 MWe) was achieved at 1755 on September 15.
The unit ended the month at 100% (860 MWe).
l
.. ~
t
' October 7, 1992 REFUELING INFORMATION REQUEST:
4
[
1.
Name of facility:- Calvert Cliffs Nuclear Power Plant, Unit No.1.
i a
]
2.
Scheduled date for next refueling shutdown: March 5, 1994.-
1 Scheduled date for restart following refueling: May 17,-19S4.
i 4.
Will refueling.or resumption of operation thereafter require a.. Technical Specification change or other license amendment?:
i Hone identifieri at this time.
d i>
i.
5.
Scheduled date(s). for submitting proposed licensing action and L supporting information.
December 1993-for UIC12.
l 6.
-Important licensing considerations associated with the. refueling.
None identified at this time.
i-7.
The number of fuel assemblies. (a) in'the core and (b)- in the spent fuel stcrage pool.
i (a) 217.
(b) 1410.
Spent fuel pools are common to Units 1 and 2.-
8.
(a) The present-licensed spent fael pool; storage: capacity, and (b) thel size of any. increase in licensed storage capacity that has been -
1 requested or is p1anned, in number of fuel _ assemblies.
i (a) 1830.
(b) 2880.
i 9.
The projected date (,f the last refueling that.can be discharged to the'.
. Spent Fuel Pool -assuming the.present licensed; capacity 1and. maintaining space for one full-core off-load.
. March'1993 l
l 4
8 L
L c.~,
s m
- =
-. ~. -
d
~
UNIT 2 OPERATING DATA REPORT i
i Docket No. 50-318 5
October 14, 1992'
[
Prepared by Leo Shanley i
Telephone:(410)260-6744 i
OPERATING. STATUS f
- 1. UNIT NAME Calvert Cliffs Unit 2 i
- 2. REPORTING' PERIOD SEPTEMBER 1992 3.
LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE' RATING (GROSS MWe) 918 5.
DESIGN ELECTRICAL-RATING.(NET MWe) 845-
-6.
MAXIMUM' DEPENDABLE CAP'Y (GROSS MWe) 860 i
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825 8.
CHANGE IN CAPACITY-RATINGS NONE j
9.
POWER LEVEL TO WHICH RESTRICTEE N/A
- 10. REASONS FOR RESTRICTIONS N/A Cumulative f
This month. Year-to-Date to Date-
- 11. HOURS IN REPORTING PERIOD 720 6~,575-135,887 i
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL-683.7 5,779.6 97',819.9-
- 11. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6~
i
- 14. HOURS GENERATOR ON LINE 683.7 5,720.8 96,443.0 l
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0. 10 L
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,832,345 15,270,180 245,409,486
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 588,723 4,992,456 ;81,076,837-l
- 18. NET ELECTRICAL ENERGY GENERATE 0(MWH) 563,789.
4,786,412 77,464,560-l-
19.-UNIT SERVICE FACTOR' H95. 0 :
87.0-171.0.
I
- 20. UNIT-AVAILABILITY-FACTOR 95.0' 87.0' 71.0
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 94.9 88.2 69.1
- 22. UNIT: CAPACITY FACTOR (USING' DER NET) 92.7 86.2' 67.5' j._
- 23. UNIT FORCED OUTAGE 1 RATE 5.0 13.01 6.0
- 24. - SHUTDOWNS-SCHEDULED OVER-THE NEXT -
l-
'SIX MONTHS (TYPE,.DATE AND DURATION):
(_
. Refueling, March-5, 1993 for 96 days-E
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
October 3,.1992 (actual)-
1 I
_.... _ -. _ _ _ ~. _..... _ -
UNIT SIIUTDOWNS AND POWER REDUCrlONS DOCKET NO.
50-318-i UNITNAME Ca' vert Cliffs-U2 ~
^ !
DATE October 14.1992 COMPLETED BY Iro S'ianlev l
TELEPHONE (4101260-6744 l
REPORTMONTII September 1992
..j i.
~^
l I
METIIOD OF SIIUTITNG LICENSEE '
CAUSE & CORRECITVE DURA 110N D O W !i LM SYSTEM COMPONENT ACTION TO
- (IIOURS)
REASON 2 REACTOR 3 REPORT #
CODE 4 CODE' FREVENT RECURRENCE S
NO.
DA113 -
TYPEI 92-10 920929 F
36.3-A 2
92-007
.SB RV
- 1) Unit was manually tripped following Main i
Turbine Rear Thrust Bearing Face temperatu c alarms
- 2) High thrust bearing temperatures resulted from
-i a stuck opca Moisture Separator Reheater shell-side relief valve. This caused a decrease in extraction steam pressure which led to differential pressure across the turbine.
- 3) A root cause analysis was perfomed and the relkf
[
l valve was overhauled. Changes to the maintenance.
program and inspections of similar valves are.
planned.
r i
1 1
i 4
j I-1 F: I'orced 2 Reason:
3 Method:
j.
S: Scheduled A - Equipment Failure _
1 - Manual
~
i-B -Maintenance or Test 2 - Manual Scram.
j C-Refueling 3 - Automatic Scram.-
-5 IEEE Standard 803A-1983 i'
' D - Regulatory Restriction 4 - Continued j
E - Operator Training & License Examination' 5 - Reduced Load 5
F-Administrative 9-Other '
i G - Operational Error i
II-Other i
i i
)
AVERAGE DAILY UNIT POWER LEVEL co**********************************************************************
Docket No. 50-318 Calvert Cliffs Unit No. 2 October-14, 1992 Prepared by Leo Shanley Telephone: (410) 260-6744 SEPTEMBER 1992 Average Daily Power Lovel Average Daily Power level Day (MWe-Net)
Day (MWe-Net) 1 825 17 834 2
024 18 833 3
825 19 833 4
824 20 834 5
826 21 834 6
829 22 834 7
829 23 835 8
828 24 840 9
829 25 844 10 825 26 712 11 826 27 787 12 829 28 837 13 830 29 388 14 829 30 0
15 831 16 832
' DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 September 14,1992
SUMMARY
OF OPERATING EXPERIENCE Sentember 1992 The unit began the month at 100% (825 MWe).
4 Power was reduced to 87% (705 MWe) from 0500 on September 26 to 05G on September 27 to repair 21 Heater Drain Pump, test Main Turbas valves and clean condenser waterboxes. While returning to full power, the unit was held at 95% (780 MWe) from 0845 to 1350 on September 27 to attempt repairs to 22B Amertap system. 100% (835 MWe) was reached at 1700.
An expeditious shutdown was commenced at 1010 on September 29 due to 23 Moisture Separator Reheater shell-side relief valve being stuck open. While reducing puwer, high temperatures alarms -
were received on the Main Turbine Rear Thrust Bearing Faces. The unit was manually tripped at 1141.
The unit ended the month in Hot Shutdown (Mode 4j.
4 5
4 W
[
-y
4 i
' October 7, 1992 REFUELING INFORMATION RIQL!151 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2 2.
Scheduled date for next refueling shutdown:
March 5, 1993.
3.
Schedulod date for restart following refueling:
June 9, 1993.
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Not identified at this time.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
December 4, 1992.
.t licensing considerations associated with the refueling.
6.
i The tar;ei :.acth for this cycle will be 570 er'fective full power days.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217.
(b) 1410.
Spent fuel pools are common to Units _1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capac4ty that has been requested or is planned, in number of fuel assemblies.
i (a) 1830.
(b) 2880.
9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core cff-load.
March 1993 t
,