ML20115D206
| ML20115D206 | |
| Person / Time | |
|---|---|
| Site: | Hatch, Arkansas Nuclear, Columbia, Robinson |
| Issue date: | 07/31/1984 |
| From: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Totten M PUBLIC CITIZEN LITIGATION GROUP |
| Shared Package | |
| ML19255H970 | List: |
| References | |
| FOIA-84-44, RTR-NUREG-0885, RTR-NUREG-885, RTR-NUREG-CR-2631, RTR-REGGD-01.XXX, RTR-REGGD-1.XXX, RULE-PR-20 ACRS-GENERAL, NUDOCS 8504190002 | |
| Download: ML20115D206 (100) | |
Text
h$~0 f % q$$
- 0 UNITED STATES
[
s.
g.
NUCLEAR REGULATORY COMMISSION 5
j WASHINGTON, D. C. 20555 JUL 311984 Mr. Michael Totten, Director Public Citizen's Critical Mass Energy Project 215 Pennsylvania Avenue, SE IN RESPONSE REFER Washington, DC 20003 TO F01A-84-44
Dear Mr. Totten:
This is in further response to your letter dated January 16, 1984, in which you requested, pursuant to the Freedom of Inf ormation Act, documents from the Institute of Nuclear Power Operations (INP0) and the NRC that describe, analyze, or evaluate INP0's role or procedures in reporting its information to the NRC.
The documents listed in the enclosed Appendices G through M, with the exception of the 19 documents noted on the appendices with asterisks, sre being made available in the NRC Public Document Room. Those records indicated with a single asterisk on the appendices are being withheld in their entirety. Those records indicated with a double asterisk are being withheld in part.
Except as noted below, these records are being withheld pursuant to Exemption (4) of the Freedom of Infonnation Act (5 U.S.C. 552(b)(4)) and 10 CFR 9.5(a)(4) of the Commission's regulations for the same reasons set forth in Mr. Zack T. Pate's letter of May 31, 1984, a copy of which was previously furnished to you.
i A portion of document 60 of Appendix K,1983, and all of document 82 of Appendix K, 1983, are being withheld pursuant to Exemption (5) of the Freedom of Information Act (5 U.S.C. 552(b)(5)) and 10 CFR 9.5(a)(5) of the Comission's regulations.
These documents are internal memoranda containing advice, opinions, and recommendations of the staff regarding NRC policy issues.
Disclosure of the documents would tend to inhibit the open and frank exchange of ideas essential to the deliberative process.
Exemption (b)(5) shields from the mandatory disclosure records generated in the deliberative process that precedes most decisions of government agencies (Jordan v. United States Dept. of Justice, 591 F.2.d 753 (D.C. Cir.1978)).
Thus, the exemption protects not only comunications which are themselves deliberative in nature, but all communications which, if revealed, would expose to public view the deliberative process of an agency (Montrose Chemical Corp. of California v. Train, 491 F.2d 63 (D.D. Cir. 1974)).
8504190002 840731 PDR FOIA TOTTEN84-44 PDR i
Mr. Michael Totten For reference, the documents which are being withheld in whole or in part are listed on the enclosure of this letter.
This is a final agency action with respect to Appendices G through M.
As set forth in the Freedom of Information Act (5 U.S.C. 552(a)(4)(B)),
judicial review of this decision is available in a district court of the United States in either the district in which you reside, have your principal place of business, or in the District of Columbia.
For your infonnation, there are approximately 75 documents subject to your request that are still undergoing review. The NRC expects to complete action on your request by August 31, 1984.
Sincerely, e
/
Williae J. Dircks Executive Director for Operations
Enclosures:
As stated 4
F Re:
FdIA-84-44 ENCLOSURE A.
Records withheld in their entirety 1.
Document 5, Appendix H, 1982 2.
Document 1, Appendix H, 1983 3.
Document 3, Appendix H, 1983 4.
Document 9, Appendix H, 1983 5.
Document 10, Appendix H,1983 6.
Document 11, Appendix H, 1983 t
7.
Document 19, Appendix I, 1982 8.
Document 60, Appendix K, 1983 9.
Document 82, Appendix K, 1983 10.
Document 24, Appendix M 11.
Document 38, Appendix M 12.
Document 43, Appendix M 13.
Document 48, Appendix M B.
Records withheld in part 1.
Document 10, Appendix K, 1983 2.
Document 58, Appendix K, 1983 3.
Document 88, Appendix K, 1983 4.
Document 1, Appendix K,1984 5.
Document 9, Appendix L 6.
Document 31, Appendix M A
[
Y APPENDIX G LISTIgr, OF IflP0 CORRESP0'lDEllCE SENT T0 INDIVIDUALS AND ORGANIZATIONS OTHER THAN THE HRC 1981 1.
6/2/81 Letter to Mr. R. Patrick Mcdonald from E. P. Wilkinson and E. L. ZebrosRi, (1 page) 2.
7/13/81 Letter to ANS 58,20 Subcomittee from R, L Hsueter
Subject:
Placement of Management and Funding Responsittlities for NPRDS Within INPO.
(3pages) 3.
12/11/81 Letter to Mr. L. J. Cooper from R. L. Haueter.
(2 pages) 4.
12/30/81 Letter to Mr. Joseoh M. Farley from E. P. Wilkinson, with attachment:
INPO Procedure For Evaluation Follow-Up.
(2pages) 1982 1.
2/17/82 Letter to Mr. John Parris from R, L, Siamrd with attachments:
Meeting Minutes IEEE/UIW6, INPO' NRC/AEOD Coordination Meeting No. 2, and Special Meeting With INP0/NRC/ DOE Personnel Coordination Meeting No. 2 Attendance List.
(3 pages) 2.
Duplicate Eliminated 3.
5/21/82 Letter to NPRDS Users Group from R. L. Haueter.
(1 page) 4.
6/29/82 Letter to Benjamin M. Tashjian from Arthur W. Weyrauch with
Attachment:
Letter to Mr. Art Weyrauch from Robert L. Dennig.
(2pages) 5.
8/12/82 Letter to Benjamin M. Tashjfan from Arthur W. Weyrauch, (1 page) 6.
9/8/82 Letter to Robert J. Addy from Arthur W. Weyrauch with Attachments: Letter to R. 5, Baker and J. M. Huzdovich from A. W. Weyrauch, Letter to Mr. R. J. Addy from M. J. Logan, and Letter to R. J. Addy from J. K. Legg.
(5pages) 7, 12/22/82 Letter to NPRDS Users Group Members from R. L, Simard with
Attachment:
Minutes from NPRDS Users Group Meeting. October 26, 1982.
(38 pages) 8.
12/31/82 Letter to Members of the NPRDS Users Group from R. L, Simard.
(1 page) 9.
2/9/82 Letter to F. Culler from E. P. Hilkinson re:
Efforts Between EPRI and INP0
(-
--}.
-9 1983 1.
1/17-18/83 Minutes from NPRDS Users Group Meeting No. 2 (28pages) 2.
1/28/83 Letter to Mr. Joseph M. Farley from E. P. Wilkinson.
(2pages) 3, 2/1/83 Letter to NPRDS Users Group Members from R. L. Haueter with
Attachment:
Letter to Mr. Joseph M. Parley from E. P. Wilkinsoa.
(3 pages) 4.
Duplicate Eliminated 5.
4/28/83 Letter to Mr. L. T. Gordon from Ellen Smith (1 page) 6.
7/21/83 Letter to Members of the NPRDS Users Group from R. L. Simard with
Attachment:
Agenda for NPRDS Users Group Meeting August 9-10, 1983 (3pages) 7.
6/28/83 Letter to Richard Badalamente from Linda D. Yauch.
(1 page) 8.
8/18/83 Letter to Members of the NPRDS Users Group from R. L. Simard with
Attachment:
Letter dated 8/1/83.
(4pages) 9.
8/22/83 Letter to Mr. Lelan R, Sillin, Jr. from E. P. Wilkinson with
Attachment:
Present and Planned INP0 Activities That Dupitcate or Overlap Proposed NRC General Operating Criteria, (7 pages) 10.
12/14/83 Letter to Mr. George Murphy from R, L. Simard.
(1 page) l l
l s
84-44
~ #
APPENDIX K
~
NRC lilTERNAL 1979 1.
3/2/79 iteno fron !!. 'torrison to L. Gossick
Subject:
Proposed Rulenaking Review Request w/ enclosure Advanced flotice of Proposed Rulenaking (7 pages) 2.
3/9/79 fieno fron 1:. Thornbur9 to 11. !)orrison Sutject:
Review Of Advance Notice of Proposed Rulemaking (1 pagei 3.
8/14/79 Note from 5. Ilanauer to ". liorrison
Subject:
ilPRDS Rulenakino (1 page) 4.
8/29/79 tieno fron Samuel Bryan to !!. !1orrison
Subject:
Proposed Rulemaking Review Request w/ enclosure Comments on Advanced llotice of Proposed Rulenaking on Mandatory Participation in NPRDS (2 pages) 5.
8/29/79 Memo from Al Kenneke to T. Rehn
Subject:
Proposed Rulenaking Request (2 pages) 6.
8/30/79 liemo fron Saul Levine to llilbur !iorrison
Subject:
Coments On The Proposed Rulemaking Procedure For flPRDS (1 pace) 7.
3/31/79
!ieno from flom Haller to ililbur Horrison
Subject:
HPRDS Proposed Rulenaking Review Request v/ attachment Domestic Licensing Of Production ana Utilization Facilities (17 pages) 3.
9/5/79
&mo from T. Rehh to Robert Minogue
Subject:
Pro. posed Rule-making Request (Advance Notice Of Proposed Rulenaking, Operational Data Gathering,!iandatory Reporting of HPRDS Data System (1 page) 9.
10/7/79 Heno fror.!Jillian Russell to 11. Medeiros
Subject:
Proposed Rulemaking: !!andatory Reportin9 Of flPRDS Information w/ enclosure SD Resolution (7 pages) 10.
11/6/79
!ieno fron !1. Medeiros for File
Subject:
Major Points Brounht Out In 10/31/79 lieeting With NSAC Director Ed Zebroski (3 oages)
E h
i
84 44 APPENDIX r.
IIRC litter:iAt 197.9 1.
5/IE/B0 Meno from Carl 'tichPIson to Millia Dircl's $Ubject:
Proposes Cooperative Anreemant llith The Institute Of flutlear rower Onerations (IllPO' And The flu: lear Sa'ety Analysis Center ( '45 U.
w/ enclosure Preli'-inary Dre't (6 panes) 2.
5/29/83
' tem free 'i. 'teceires to R. Minccse SuMe:t:
Annual hurlear Plant Reliability Data Syste- (N:C) fleetinn w/encicsures Preliminary Surr.ary of 42 con.e".1 letters, Iby 30 neno to liinor;ue from liedeiros, Report cf Trip to Oconee (7 paces) 3.
6/4/80 Meno fron C. Heltenes to M. :4edeiros
Subject:
NPRDS - Your fieetino flenort To R. B. liinogue, Dated :tay 29, 1980 (2 pages) 4.
Duplicate Eliminated 5.
5/26/8')
fleno fron Carlyle 'tichelson to H. Dircts
Subject:
Proposed Cooperative Operational Data Activities Ilith The Institute Of liuclear Power Operations (I!!PD) And The lluclear Safety Analysis Center (:: SAC) w/ enclosure (7 panes) 6.
6/27/80-,tiote fron Jack Heltenes to All AE03 Personnel re:
Infornal Organization Charts and Current Personnel Assignnents w/ enclosure Charts 3 pages) 7.
7/8/80 Meno from Carlyle tiichelson to llillian Dircks
Subject:
Propose:
lieetino liith !!!PO And flSAC On Potential Cooperative Activities w/ enclosure Biographical Data II1PO Board of Directors (8 panes' 3.
7/8/80
- leno fron K. Clari. to V. Stello
Subject:
IliPO Briefine of President's I uclear Safety Oversio5: Corr.ittee w/enciesure Re::-;
Of Conference By The Presiden 's fisclear Safety Oversight Corr.ittee At The Institute Of fluclear Power Operations June 3C At Atlanta (26 paces) 9.
7/9/80 fieno from Frederick Hebdon to Eric !!e:ss
Subject:
liPRDS Rule-nakinn w/ enclosure tiandatory !PRDS Rule Questions (3 paces 10.
7/17/30 tiote from liillian Dircks to Carl Michelson re:
Review of Clipped Parts (1 page) 11.
Duplicate Eliminated 12.
7/28/80
!)eno fron Carlyle tiichelson to llilliam Dircks
Subject:
INPO Briefing Of Presi.ient's lluclear Safety Oversight Corraittee (Your flote Dated 7/17f80) (2 pages)
I
4.
13 8/4/80 Meno fror. Carlyle liichelscn to 11. Dircks
Subject:
Proposed Cooperative Agreement liith The Institute Of tiuclear Power Operations And The fluclear Safety Analysis Center w/ enclosure NSAC Revised Draf t (f. pages) i t..
8/5/80 Meno fro-f!. Hartfield to C. Michelson
Subject:
NPRD5 Data Useae Meeting ( paqe) 15.
Duplicate Elim' rate::
16.
5/15/3D
'te o f rc. Carlyel W.ichelsor tc Robe-t Minop;E Sutject; Input To The Co rissior. Paper Or fFRDS A.:: :iD.:'s Reporting Require.
ner,ts w/ enclosure AEOD Reporting Reavire,ents - Need For flPRDS Type Infornation (16 pages) 17.
9/23/80 Memo fro. Carlyle Michelson to Edward Jordan
Subject:
Propos 1 For INPO To Support Utilities In Assessing Operational Data w/ enclosure Draf t questions (3 pages) 18.
10/7/80 Me.o from Carlyle Michelser to !!. Dircks
Subject:
Proposed Cooperative Operational Data Activities Uith The Institute Of tiuclear Power Operations And The fiuclear Safety Anslysis Center w/ enclosures AE0D Coments on Proposed Agreement, Septenber 15, 1980 liiPD/IISAC letter (10 pages) 19.
10/7/80
!)eno from llilliam Dircks to liarold Denton
Subject:
Proposed liiP0/Il5AC/llRC Cooperative Agreement (? nages) 20.
Duplicate Elirr.inated 21.
10/8/80 Memo fron Carlyle tiichelson to Robert tiinocae
Subject:
Input For flPRDS Corrission Paoer w/ enclosure Draf t paper (10 pages) 22.
10/16/80 Meno fro-llilliar Dircks to Harold De. ton
Subject:
Proposed litPD/liSAC/liRC Cooperative Agreenent On Operational Data (2 pagei' 23.
Duplicate Eliminated 24.
10/23/80 Memo from E. Jordan to Carlyle !iichelson
Subject:
llotificatio-Of Significant Events (3 pages) 25.
10/24/80 !iemo from Carlyle Michelson to Robert Minogue
Subject:
Integrated Operational Experience Reporting) System u/ enclosure R Draft Cornission Paper (11 pages L
ra 1930 l
26.
10/31/83 Note from Fred Hebdon to File Sub,iect:
Revised Reportino Reauirenents (? paces) 27.
11/10/39 Meno fron Edward Hainer to Millian Dircks Subject- 'faiver Of Co,r.ission Policy On Avoidance Of Contractor Or9ar.irationa!
Conflicts Of Interest w/ enclosure Organizational Conflicts of Interest:
Weiver (18 eages) 2C.
11/26/80 Men; fror Carivle 'iichelson to Edward Hainan
Subject:
Uaiver Of Commissior. Foiicy On Avoid 6nce O' Contra:ter Orner.izatione!
Confitets Of Interest (1 page) 29.
12/16/00 %emc fron Carlyle Michelsor to Milliam Dircis
Subject:
Continuation Of NRC Support Of The f4PRD System (1 page) i
)
L
APPENDlX K NRC 10 INPO 1981 1.
1/13/81 Ment f ror Guy Cu,.ino5am to Carlyle Micht isor. Sub.ie t t :
Applica-bility Of 10 CFR Part 21 Reporting Requirener.ts lo INP0/NSAC (4 paces) 2.
1/34/61 hote f ror Fred Hebcon to file Sut,iect:
NrEDS Sumconnittee lieetin; (2 oaces}
3.
1/22/S1 4ero f row Richard Ireland to Stephen Hanauer
Subject:
Forthconin; Pketin; With Institute Of fiuclear Poser Operations w/ enclosure Agenda - INP0/DHFS Meeting January 27,1981 (2 pages) 4.
1/28/81 Note fron Frederick Hebdon to File
Subject:
NRR/INp0 Coordination Meeting (2 pages) 5.
Duplicate Fliminated 6.
1/20/81 Meno from Fredcrick Hebdon to Carlyle Michelson
Subject:
Forthcor.ir; Meeting With INPO 7.
2/9/81 Note frot Frederick Hebdon to E. Adensam, J. Knight, J. Roe, E. Jordan, G. Gower, E. Blackwood, R. Woodruff, R. Hartfield, E. Boyle, J. Crooks 8.
2/13/81 Hero from Carlyle Michelson to William Dircks
Subject:
Feedback of Doerating Experience 9,
2/25/81 Memo from Fred Hebdon to C. Michelson
Subject:
Reportable Scope of NPRDS w/ enclosure Proposed Reportable Systems Lists 10.
Duplicate Eliminated 11.
Duplicate Elicinated t
l 12.
Duplicate Eliminated
.s.
13.
Duplicate Eliminated 14.
Doplicate Eliminated 6
15.
Duplicate Eliminated 16.
3/20/8]
Meno from Norman Haller to William Dirchs
Subject:
Meeting Witt.
INPD Representative 17.
3/24/E Me ne. fro-Carlyle Michelson to Willian Dirc6 s
Subject:
A vi a t i on Safety Reoorting System ( ASc.5) And The Pcter.tial Adoption Of A Similar System For The Nuclear Industry 16-Duplicate Eliminated 19.
4/20/81 Memo from Frederick Hebdon to Stuart Rubin
Subject:
Nuclear Plant Reliability Data 'Syster (NPRDS) Reportable Scope 20.
4/24/81 Meno from R. Bernero to W. Vesely
Subject:
NPRDS iketing on May 12,19S1 2I*
Duplicate Eliminated 22.
5/6/81 Memo from George Lanik to Frederick Hebdon
Subject:
Nuclear Plant Reliability Data System (NPRDS) Reportable Scope w/ enclosure Comments on NPRDS Reportable Scope 23.
5/8/81 Note from C. Heltenes to C. Michelson re: Background to Monday Meeting with INP0/NSAC w/ enclosure Telecooy to Dircks
Subject:
Memorandum of Agreenent Between INP0/NSAC and the U.S. NRC On A Cooperative Relationship For The Collection and Feedback Of Operational Experience Inforcation and Data for Nuclear Power Plan t 24 5/13/81 Menorandum from Carlyle Michelson to William Dircks
Subject:
Appr:.!'
Of The Memorandum Of Agreement On A Cocoerative Relationship For Ttt Collection And Feedback Of Operational Exoerience Information And Data For Nuclear Power Plants w/ enclosure Memorandum of Agreerent 25.
Du,plicate Eliminated 26.
Duplicate Eliminated i
27.
5/25/82 Memo from Narinder Treham to Frederick Hebdon
Subject:
NPRDS Reportable Systens And Component Scope Manual 28.
Duplicate Eliminated
m 29.
6/1/81 Memo f rom R;bert Dennig to The Files
Subject:
Trip Ret, ort - NPRDS Workshop May 1415 San Antonio, Texas w/attachnents Slides for 10tP Presentation. Lette regarding D0! Sur: ort for NfM5 30.
Daplicate Eliminated 31.
6/16/E:
Me o f ro. Williar Dirc6 5 to Chai rnar. Herbie, Gilinsk y, Bradford and Ahsarne Surjett:
Me orandJr fo Agree er.t With INPD Ane NSA Or A Cooperative Relationship For The Colle: tion And Feedbatt o' Operational Data w/ enclosure Mercrandur. of Agreercr.t INF0/N$t,;.NR; 32.
6/22/81 Meno from Carlyle Michelson to Harc1d Denten
Subject:
Re vie., of tbt INP0/NSAC St +-In Program w/ enclosure Background Information Concern.
ing Review of the INP0/NSAC Screening and Preliminary Evaluation Progra...
33.
Duplicate Eliminated 34.
7/21/81 Additional Agenda Iters for IND0/NSAC/NR0 Heeting on Memorandum of Agreement 35.
7/23/81 Routing Slip to All AEOD Members re:
Charts w/ attachment Analysis &
Special Projects Division Orginizational Chart 36.
7/29/81 Memo from C. Heltenes to Carlyle Itichelson
Subject:
Distribution tc PDR of Correspondence and Reports Associated With Memorandum of Agreement With INP0/NSAC 37.
8/17/81 Memo from Don Beckham to Stephen Hanauer
Subject:
forthcoming Meeting With INPO w/ enclosure Agenda INP0/NRC-DHFS Meeting 8/15/81 38.
8/24/81 Memorandum from Robert Minogue to Learned Barry
Subject:
Trans fer of Project From RES To AEOD 39.
8/24/81 Letter from Haueter to C. Michelson re: further funding for NPRDS in the future 40.
8/25/81 List of Attendees at INPO-NRC Meeting w/ enclosure NRC Research Update 41.
8/27/81 Memo from Robert Dennig to File
Subject:
INP0/NRR Technical Exchange on Hu.an Factor Programs 42.
Duplicate Eliminated 43.
Duplicate Eliminated 44.
10/5/81 Note fmm Jack Heltemes to Ed Case, Dick Deyoung and Denny Ross re: AE0D Studies w/ enclosures AE0D Case Studies, Reports Issued by AE0D, INPO Special Interest Codes L
-_-----___------_m----
e 45.
10/13/81 Memo from R:bert Dennig to Files Subject-INPD-NRC/DHFS Pketino, October 7,1981 w/ attachments NRC Research Update. Agenda to INPD-NR Met ti ng Oc tobe r 7, 1981 46.
10/15/81 Meno f rom Patrick Rowt to Fre derici He!'dyi Sub,'ec t :
INr0 Recuest it-Access to the NRC Docunent Control Syster (D:5) w/et tachments Letter f rom Zebrosi t to Dircks did Oct. 5/ 19E1, Draf t Response 47.
10/21/81 Meno f ro Frecerick Hebdor. to file Sat,ie t -
NEE 25 48.
Duplicate Elininatec 49.
10/29/81 Letter from C. Helteres to Denny Roos
Subject:
Transmittal af INP0/NSAC Reports 50.
10/29/81 Note from C. Heltemes to Ed Case and Ed Jordan
Subject:
Trnasmittal of INP0/NSAC Reports 51.
Duplicate Eliminated 52.
12/2/81 Memo from William Dircks to C. Michelson, R. DeYoung, H. Danton, R. Minogue, and V. Stello
Subject:
Meeting to Discuss INPO Related Matters 53.
Duplicate Eliminated 54.
12/11/81 Hemo from Norman Moseley to Richard DeYoung
Subject:
Accorpaninent of INPO Evaluation at Plant Hatch w/ enclosure Trip Report 55.
12/11/81 Memo from Carlyle Michelson to Richard DeYoung
Subject:
10 CFF 50.72 Notification of Significant Events w/er. closure Letter dated 11/10/81 from E. Zebroski to C. Michelson 56.
12/11/81 Note from C. Heltemes to Ed Case, Dick DeYoung and Denny Ross re : Hemorandum of Understanding w/ enclosure Memorandun of Agreerent INP0/NSAC-NRC 57.
12/23/61 Meno from C. Heltenes to Frank Rowsone
Subject:
Transfer of FIN A6293 From RES To AE03 For FY 1982 - Modificetion w/attachrent Mero from C. Helteres to Rowsore l
58.
12/23/81 Memo from C. Helteres to Frank Rowsore
Subject:
Transfer of FIN A6290 From RES to AEOD For FY 1982 - Modification w/ attachment Memo from R. Minogue to L. Barry
Subject:
Transfer of Project From RES To AEOD r
l t
84 44 APP [NDlX K NRC INT [RNat 1982 1.
Undatec FY 1982 Program Assurptions w/ enclosure Fi 1982 Prograt Brief 2.
1/1E/82 Note from C. Helteres to Joe Lafleur
Subject:
Arrangenents For inpc To Re:eive fortign Operating [xperien:e Given To The NRC 3.
- /27/82 NR; 'r.
- v:e e t No. 6 fror hunzio Palla ino to All NR; Erricyees
Subject:
Policy and Ple*.rin; Guice ce Docurert w/ enclosure U.S. NR' Policy and Planning Guidance 1962 NUREG-08E5 issue 1 4.
2/11/82 Memo from Harold Denton to William Dircks
Subject:
Meeting With INPO - Radiation Protection Plans 5.
2/16/82 Memo from Jaces Cumings to William Dircks
Subject:
Review of NRC's Efforts to Develop a Relationship With INPO 6.
2/22/81 Note frw C. Helteres to Learned Barry
Subject:
Writeup On Cooperative Activities on Operationel Experience w/ enclosures Brief writeu; on scope and nature of Memorandum of Agreement, Memorandum of Agrverent INP0/NSAC-NRC 7.
2/23/82 Note from Frederick Hebdon to File
Subject:
Nuclear Plant Reliability Data System (NPRDS) w/ enclosure Thoughts and Observations from Meeting of the Technical Advisory Comittee at INPO 8.
3/1/82 Facsimile from H. Thorpson to J. Heltemes
Subject:
Coments on OlA Draft Report on NRC's Relationship With INPO 9.
3/2/82 Memo from R. DeYoung to C. Michelson
Subject:
Proposed NRC/INPO Memorandum of Agmerent w/ enclosure 3/19/82 ltr. from E. Wilkinson to W. Dircks Subje.ct: Progress on Menorandum of Agreenent and Supplements w/ attachment Mencrandurr of Agreenent INP0/NSAC-NRC 10.
3/ 3/82 INED Review of 19E; SERs VS. Prtposed LER Rule 11.
3/3/82 Memo from C. Helteres to Edwin Triner
Subject:
Information Requested By Energy And Water Development Appropriations Subcomittee w/enclosum Resoonse to item 2 of the Comittee Re;uests 12.
3/3/02 Memo from Carlyle Michelson to H. Denton, R. DeYoung and R. Monogue
Subject:
NRC InDut To The NPRDS Under INPO w/ enclosure Ltr dated 2/23/82 from C. Michelson to E. Wilkinson
Subject:
Participation on the NPRDS Technical Advisory Comittee 13.
Duplicate Eliminated 14.
3/10/82 Memo from Darmli Eisenhut to All Licensees of Operating Plants, Applicants for Operating Licenses and Holders of Construction Permits
Subject:
Use of INPO See-In Program (Generic letter No. 82-04) 15.
3/12/82 Memo from R. DeYoung to W. Dircks
Subject:
Proposed Appendix No. 5 to Memorandum of Agreement Between INPO And NRC-Utility Evaluations w/enclosum Appendix Number Five
.r L
1982 16.
3/2 3/82 Memo from R. Scott to Valeria Wilson
Subject:
DCS Precessing of INPD Reports 17.
3/24/84 Memo fror. Darrell Eisenhut to All Licensees of Operating Plants, A?;1icants for Operating Licenses and Holders of Construction Perr.ts
Subject:
Use of INPO See-IN Prograrr (Generit Letter No. 82-04) 15.
3/ 30/E2 hv. f rc-C. Helteres to Warren Minners
Subject:
Revie-of ECCS Actuatior.s On U.S. PWR5 19.
Undatec Menorande of Agreement Between The Institute of Nuclear Power Operations and The U.S. NRC signed by Dircks and Wilkinson w/enclos. t Appendix Nurber One Exchange of Operational Experience Data 20.
4/6/82 Memo from Harold Denton to Carlyle Michelson
Subject:
AEOD Menorandue. on NRC Input To The NPRDS Under INPO 21.
4 /2 1/ 82 Memo from Frederick Hebdon to Carlyle Michelson
Subject:
Uaplicate Lliminated 23.
4/22/82 Memo from Robert Dennig to C. Helteres
Subject:
NPRDS Administratic.
Under INPO 24.
5/ 3/82 Note from Frederick Hebdon to Hal Ornstein, Wayne Lanning and Gene Imbro
Subject:
NPRDS Reportable Systems And Conponent Scope Manual w/enclosum Conrents On NPRDS Scope Manual 25.
5/4/82 Memo from Frederick Hebdon to Carlyle Michelson
Subject:
SCSS Syste s And Codes w/entlosure Comments, Observations, and Reconvendations Conceming SCSS System Codes 26.
5/10/82 Note fror Jad Heltenes to Joe LaFleur re:
INPO Response to Criteria for Safeguarding IRS Material 27.
5/ 14/82 Memo from Richard DeYoung to B. Grimes, E. Jordan, L. Cobb, R. Fort.r.a.
J. Lieberman and J. Blaha
Subject:
5/14/82 Meno from William Dircks to List of Addresses
Subject:
TMI Actior.
Plan Itens Still Pending w/ enclosure Mere dated 5/14/82 from Dircks to Corc"ssioner Aheame Subject.
Action Plan Tracking System 29.
5/17/82 Meno fron John Pellet to Frederick Hebdon
Subject:
NPRDS Reportable Systers And Cocoonent Scope Manual w/ enclosure Corrents on NPRDS Scope Panual 30.
5/19/82 Memo from Frederick Hebdon to file
Subject:
NPRDS Engineering Data Working Gmup w/ enclosure Dictionary of Congonent Codes, Generic Labels, and Descriptions
]
191?
31.
5/26/82 Memo from Robert Minogue to Carlyle Michelson
Subject:
NPRDS Program Plan And lechnical Advisory Corrittee 3?.
6/7/82 Memo f rom Carlyle Michelson to H. Denton, R. Deiounc, R. Minogue
Subject:
Program Plan For The Nuclear Plant Reliability Data Syste-33.
6/9/8?
Note fre Ja:6 Heltenes to Joe Larleur rt; Revised INPD Confiden-tialits Ag te er. w/ enclosures AEDD Ccminents Concer-ing ! AE A Establishme-t of National and Intematio".a1 Incident Re:'orting Systems, Confidentiality Agreerent 34.
6/15/E2 Memo from John Crooks to C. Heltemes
Subject:
Information Request 35.
6/15/82 Memo f rom C. Michelson to R. Haynes, J. O'Reilly, J. Keppler, J. Collins and R. Engelken
Subject:
Current Status of the Coopera-tive Relationship With INPO Regarding Operational Data w/ enclosures Memorandum of Agreement, Appendix Number One 3E.
6/18/82 Memo from C.11ichelson to H. Denton, R. DeYoung, R. Minogue, R. Haynei.
J. O'Reilly, J. Keppler, J. Collins and R. Engelken
Subject:
Nuclea-Plant Reliability Data System w/ enclosure First Semi-Annual Staf f Evaluation of the Current Status of NPRDS 37.
Duplicate Eliminated 38.
6/29/82 Memo from Robert Dennig to File
Subject:
June 4, 1982 Telecon With INPP RE:
INEL NPRDS Rev 0 39.
Duplicate Eliminated 40.
Unda te d Memo f rom Robert Dennig to Frederick Hebdon
Subject:
NPRDS Data Review At EG&S 41.
7/ 7/ 82 Memo from John Collins to Carlyle Michelson
Subject:
Current Status Of The Cooperative Relationship With INPO Regarding Operational Data 42.
7/8/82 Note from Stuart Rubin to Reactor Operations Analysis Branch, AEOD
Subject:
INPD/AEOD Technical Information Exchange Meeting 43.
7/13/82 Memo from Robert tiinogue to Carlyle Michelson
Subject:
INPO Prograr Plan for the NPRDS w/ enclosure Items to Consider if the Program Plan is Revised and Reprinted 44.
7/16/82 Memo from Harold Denton to Carlyle Michelson
Subject:
Program Plan For Nuclear Plant Reliability Data System (NPRDS) 45.
7/21/82 Memo from James O'Reilly to Carlyle Michelson
Subject:
Distribution Of INPO Reports L_
~
1982 46.
7/27/82 Meno from William Dircks to Chairwan Palladino, Gilinsky, Ahearne, Roberts and Assesitine Subje:::
Coordination With INPD 47.
8/13/82 Meno f rom Diane Dandois to F. Hebdon
Subject:
Transmittal of Voucher for Services Rendered by DOE w/ enclosure Voucher and Schedule of Withdrawals and Credits 4 g, Ds;1icate E11rinatec 49.
8/ 31/ 82 Meno fror Robert Dennig to File
Subject:
NPRDS Data Reporting Working Group Meeting On August 18-19, 1952 w/ enclosure NPRDS Plant Organization Reporting Guidelines 50.
9/1/92 Note from Frederick Hebdon to File
Subject:
NPRDS Engineering Data Working Group 51.
9/2 3/82 Note from C. Helteres to Joe Lafleur re:
INPO Confidentiality Statement w/ enclosure Letter from Peter Quittreyer to Ed Robeson dated 9/21/82 re:
Final Form of Employees' Confidentiality Agreere*:
52.
9/28/82 Meno from Carlyle Michelson to Rayrond Fraley
Subject:
Di st ributio-Of INPO Reports To ACRS 53.
10/1/ 82 Memo f rom C. Ph chelson to H. Denton, R. DeYoung, R. Minogue, R. Haynes, James O'Reilly, J. Keppler, J. Collins and R. Engelken
Subject:
HPRDS Documentation w/ enclosure NPRDS Workshop Agenda b
54.
10/25/82 Memo from J. Gagliardo to Carlye Michelson
Subject:
NPRDS 1
Documentation Duplicate Eliminated 56.
11/1/82 heno from Frederick Hebdon to File
Subject:
NPRDS Users's Grou?
w/ enclosure NPRDS Users' Group Meeting 57.
11/15/82 Memo from Harold Denton to Carlyle Michelson
Subject:
Nuclear Plant Reliability Data System Docurentation 58.
12/6/82 Agenda For INP0/NRC Coordianting Meeting December 6,1982 59.
12/9/82 Memo from Frederick Hebdon to C. Helteres
Subject:
Meeting With INPO To Discuss NPRDS 60.
2/12/82 Paper, NPRDS QUALITY ASSURANCE AND DATA REVIEW, INTERIM REPOP.T 1 e
L
84-44 APPENDIX K NRC INTERNAL 19E3 1.
2/2/83 Meno from Robert Dennig to File
Subject:
January 17-IE,1983 Meeting Of The NPRDS Users Group At l'.L' henc:uarters in Atlanta w/ enclosures Agenda For January 17-18 :ieeting of NPRDS Users Group, NPRCS Transition Actitisies 2.
2/25/53 Meco from Roger Mattstn to Ha*cid Dert.- Subje:t:
Staff Recon enda-tion To Proceed Witn a Coordination Fier fcr Raciolocical Activities With Tne Institute For Nuclear Power Oce-atior.s w/ enclosures Memo from H. Denton to W. Dircks, Cocecir.ation Plan for NRC/INP0 3.
Duplicate Eliminated 4.
3/10/83 Memo from C. Heltemes to H. Den'on, R. DeYoung, R. Minogue, and R. Fraley
Subject:
INPO "See-IN" Program Presentation 5.
3/10/83 Memo from P. Shewmon to ACRS Members
Subject:
Visit To INP0 6.
3/ 15/83 Memo from Richard DeYoung to R. Haynes, J. O'Reilly, J. Keppler, J. Collins and R. Engelken
Subject:
NRC-INPO Coordination Plans w/ enclosures INPO Letter of 3/3/83, 8/24/82 Plan 7.
Duplicate Eliminated 8.
3/31/83 Note from C. Heltemes to E. Case, E. Jordan, D. Ross, R. Haynes, 1
J. O'Reilly, J. Keppler, J. Collins, R. Engelken re:
Documents Under j
Provisions of Memorandum of Agnements with INPO w/ attachments l
Publications Listing, INPO Publications Analysis & Engineering Division o*9.
4/1/83 Memo from C. Heltemes to E. Case, D. Ross, E. Jordan, R. Haynes, J. O'Reilly, J. Keppler, J. Collins and R. Engelken
Subject:
4/1/83 Memo from C. Heltenes to E. Case, D. Ross, E. Jordan, R. Haynes, J. O'Reilly, J. Keppler, J. Collins and R. Engelken
Subject:
INPO SOERs/SERs w/ enclosure Keywords Index to 50ERs & SERs (through 2-2E-E3) 11.
4/4/83 Memo from A. Davis to C. Norelius and R. Spessard
Subject:
INPO Report On Diesel Generator Failures 12.
4/13/83 Routing slip from Jack Heltenes to Bill Besaw re:
Contract Within NRC for INPO Documents l
13.
4/13/83 Routing slip from J. Heltemes to T. Rehra re:
Draft letter w/ enclosure Draft from C. Heltemes to W. Besaw
Subject:
Receipt And Maintenance Of IN0P Documents o* Withheld in Part i
9 I
L
1983 14 4/21/83 Note from Gina to CJW re:
Audi t Reperts that INPO Provides 15.
Duplicate Eliminited 16.
Duplicate Eliminated 17.
4/22/53 Meno from C. Helte es to Patricia Norry
Subject:
Re:eiot and, flaintenance of 2NPD Documents w/encicsures Memorandum of Agreenent, Apoendix Nuncer One Exchange of Operational Experience Data 18.
4/27/83 Memo from Daniel Muller to C. Heltenes
Subject:
Receipt and Maintenance of INPO Documents 19.
Undated Handwritten note;from Jeannie to Fred Hebdon re:
Letter from INP0
.. - que 20.
5/3/83 Note from Robert Dennig to Files
Subject:
Potential Conflict of Interest at EG&G, Idaho re:
NPRDS 21.
5/5/83 Hero from C. Heltemes to H. Denton, R. DeYoung, R. Minogue, J. Davis, J. Allan, J. O'Reilly, J. Keppler, J. Collins and R. Engelken
Subject:
Nuclear Plant Reliability Data System (NPRDS) Proposed Reportable Scope 22.
5/10/83 Memo from Patricia Norry to C. Helteres
Subject:
Receipt and Maintenance of INPO Documents 23.
5/16/83 Memo from John Davis to C. Heltenes
Subject:
Nuclear Plant Reliability Data System Proposed Reportable Scope i
24.
5/17/83 Letter from Jesse Ebersole to William Dircks
Subject:
ACRS Sub-committee Report on Control Room Habitability w/ enclosure Resoonse to NRC Staff Corrents on Control Room Habitability 25.
5/19/83 Memo from John Collins to C. Helteres
Subject:
Nuclear Plant Reliability Data System (NPRDS) Proposed Reoortable Scope 26.
5/20/83 tiero from Jares Allan to C. Helteres
Subject:
Nuclear Plant Reliability Data System (NPRDS) Proposed Reportable Scope 27, 5/24/S3 Merc from W. Dircks to Office Directors and Regional Administrators
Subject:
Coordination With INPO w/ enclosure Letter dated 10/18/83 from E. Wilkinson to W. Dircks 28.
Duplicate Eliminated 29.
5/25/83 Memo from Richard DeYoung to Patricia Norry S;bject:
Receipt and Maintenance of INP0 Documents w/ enclosure Letter from E. Wilkinson to W. Dircks and Letter from Patricia Norry to C. Heltenes L
MJM 30.
S/26/83 Memo from James Keppler to C. Helteres
Subject:
Nuclear Plant Reliability Data System (NPRDS) Re:ortable Scope 31.
S/27/S3 Meno from Jares O'Reilly to C. Helteres
Subject:
Nuclear Plant Reliability Data Systen (NPRDS) Prooosed Reportable Scope 32.
Duplicate Eliminated 33.
5/31/53 Memo from C. Helteres to Jack Row
Subject:
AEDD Ocint of Contact Witn INTO 34 Duplicate Eliminated 35.
Duplicate Eliminated 36.
6/2/83 Nmo from C. Heltemes to Raymond Fraley
Subject:
Nuclear Plant Reliability Data System (NPRDS) Proposed Reportable Scope 37.
6/2/83 Memo from Edward Jordan to C. Neltemes
Subject:
Nuclear Plant Reliability Data System (NPRD'SThposed Reportable Scope 38.
Duplicate Eliminated 39.
6/2/83 Memo from James Shea to Jack Roe
Subject:
IP Contact For INPO Matters 40.
6/3/83 Memo from Harold Denton to C. Heltemes
Subject:
Nuclear Plant Reliability Data System (NPRDS) Proposed Reportable Scope 41.
6/6/83 Memo from Robert Minogue to C. Heltemes
Subject:
Nuclear Plant Reliability Data System (NPRDS) Proposed Reportable Scope 42.
6/7/S3 Meno fror William Dircks to Jesse Ebersole
Subject:
ACRS Subcommittee Report on Control Roc Habitability 43.
6/14/83 Memo from Jack, Roe to EDO Office Directors and Regional Administrators
Subject:
Briefing on INP0/NRC Interactions w/ attachments INP0 Contacts, Memo from Jack Roe to EDD Office Directors re:
INPO Publications 44.
Duplicate Eliminated 45.
6/16/83 Memo from Roger Mattson to K. Goller, J. Taylor, T. Martin, John Okshinski, C. Norelius, R. Bangart and R. Stras
Subject:
Developnient of a Program to Evaluate Industry Efforts to Achieve Successful Alara Integrated Radiation Protection Programs w/ enclosures Summary Criteria, Individual Criteria k-
1983
~
46.
6/20/S3 Memo from R. Stephen to Janes Lundy
Subject:
INPO Request To Renew DC5 Agmement w/atta:nrent Note f rom Fmd Hebdon to Steve Scott dated 6/17/83 47.
6/28/83 Memo from Joseph Lafleur to William Besaw
Subject:
Comments On Draf t Letter To INPO 48-Duplicate Eliminated 49.
6/29/83 P.emo from Richard Major to Frederick Hebdon
Subject:
Coments On The Nuclear Plant Reliability Data System Reportable System And Conoonent Scope Manual w/ attachment Letter from D. Moeller to R. Major re :
Conrnents on NPRDS Scope Manual dated June 24, 1983 50.
Duplicate Eliminated 51.
6/30/83 Memo from Frank Congel to Daniel Muller
Subject:
Review Of NRC/INPO Radiation Protection /ALARA Guidance w/enclosum General Radiation Protection /ALARA Program Guidance Chart 52.
7/22/83 Press Release No.83-113 For Release 7/22/83
Subject:
NRC Advisory Consnittee on Reactor Safeguards to Meet in Washington, D.C.,
August 4-6 53.
7/27/83 Memo from Jack Roe to Attached List
Subject:
Coordination Meeting With The Institute of Nuclear Power Operations (INP0) w/ enclosure Proposed Discussion Topics 54 Duplicate Eliminated 55.
8/4/83 Transcript from pages 125-208 re:
Advisory Committee on Reactor Safeguards 280th General Meeting 56.
8/5/83
' Note from C. Heltemes to E. Case, E. Jordan, D. Ross, T. Murley, J. O'Reilly, J. Keppler, J. Collins and J. Martin re:
INPO Documents 57.
Duplicate Eliminated
- 58.
8/ 15/83 Memo from Frederick Hebdon to C. Heltemes
Subject:
NPRDS Users Group Meeting w/ enclosures Observations and Comments, NPRDS Users Group Meeting List dated August 9-10, 1983
- Withheld in Part
1983 59.
8/22/83 Not2 f rom C. Heltemes to E. Case, E. Jordan, D. Ross, T. Murley, J. O'Reilly, J. Keppler, J. Collins and J. Martin re:
INPO Doc uner...
w/ attachment INPO Docu ents
- 50.
9/28/83
&mo from C. Helteres to Jack Roe
Subject:
Public Access To NPRDS Information w/ enclosure Background notes on Public Access to NPRDS Information 61.
10/S3 INDP CEO Meeting (EDO Remarks at INPD CEO Meetinc 10/83) 62.
10/3/83 Note from Jack Helteres to Jack Roe re: NPRDS Confidentiality w/ enclosure Letter dated 4/2/82 from R. Haueter to C. Michelson 63.
10/ 14/83 Memo from R. Minogue to H. Denton
Subject:
Interim Research Infor-mation Letter 135 For The Accident Sequence Precursor Program w/ enclosures 1969-1979 Precursor Sequences, Attachment to Interim Research Information Letter 136 For The Pmcursor Program 64.
10/17/83 Memo from James Partlow to Addressee List
Subject:
Sandia National Laboratories Report On Identifying Equipment Important To Safety In Nuclear Power Plants w/ enclosures NUREG/CR-2631 "A Logical Framework for Identifying Equipment Important to Safety in Nuclear Power Plants".
SNL FY 1983 Staterent of Work 65.
10/18/83 Note fmm Hugh Thomson to Harold Denton
Subject:
Sumary of NRC/INPO Coordination Meeting w/ enclosure Memo dated 9/19/83 from Dan Jones
Subject:
NRC/INP0 Coordination Meeting, September 13, 1983 (Atlanta) 66.
Duplicate Eliminated 67.
11/7/83 Memo from James Keppler to C. Heltemes
Subject:
Public Access To NPRDS Data 68.
11/28/83 Memo from C. Heltemes to H. Denton
Subject:
Public Access To NPRDS Data w/enclostres Letter dated 9/29/83 from Michael Totten to Nunzio Palladino, NRC Needs With Regard To NPRDS 69.
Duplicate Eliminated 70.
12/2/83 Memo from C. Helteres to H. Denton, R. DeYoung, R. Minogue, R. Minogue
Subject:
Request For Corrents On List of Key Component Applications For The NPRD System w/ enclosure Initial Cogonent List 71.
12/7/83 Mero from R. DeYoung to C. Heltemes
Subject:
Public Access To Nuclear Plant Reliability Data System (NPRDS) Data
- Withheld in Entirety av
1983 72.
12/7/83 Memo from John Collins to C. Heltemes
Subject:
Region IV Conrents Regarding Memo From C. Heltemes to Regional Adm.inistrators Dated November 28,19E3 "Public Access To NPED5"
~
73.
Duplicate Eliminated 74.
Duplicate Eliminated 75.
12/7/83 Memo from Thomas Murley to C. Heltemes
Subject:
Request For Coments On Public Access to NPRDS Data 76.
12/9/83 Memo from James O'Reilly to C. Heltemes
Subject:
Public Access To NPRDS Data w/enclosum Coments on NRC NPRDS Needs 77.
12/14/83 Memo from Harold Denton to C. Neltemes
Subject:
Public Access To NPRDS Data 78.
12/15/83 Memo from H. Alderman to C. Michelson
Subject:
NRC-INPO Coordination Meeting, December 13, 1983, Atlanta, Georgia w/ attachments Agenda, Performance based evaluations INP0 activities mlated to maintenance procedures, See-In Program Product 79.
12/19/83 Memo from Robert Dennig to File
Subject:
NPRDS Users Group (NUG)
Meeting, December 13-14, 1983 80.
12/20/83 Memo from James Keppler to C. Heltemes
Subject:
Request For Coments On List of Key Conponent Applications for the NPRD System w/enclosums Additional PWR Key Congonents for NPRDS, Additional BWR Key Conponents For NPRDS 81.
Duplicate Eliminated
- 82.
12/22/83 Note from Bill. Travers to Bill Dircks and Jack Roe
Subject:
In for-mation For Meeting With Zack Pate (INPO) 83.
12/29/83 -Memo from J. Gagliardo to C. Heltemes
Subject:
Request For Coments On List of Key Conponent Applications For The NPRD System 84.
~ Duplicate Eliminated 85.
12/30/83 Memo fmm Thomas Ippolito to William Russell
Subject:
NPRDS Data On Failums Due To Maintenance / Testing 86.
4/14/83 Note from J. Heltenes to F. Hebron re: NPRDS BRIEFING 87.
4/19/S3 Note from C.J. Heltemes to E. Case
- 88.
5/03/83 itemo from C.E. Morelius to J.G. Keppler; IflP0 EVALUAT10!ls
- Withheld in Ent'irety
- Withheld in Part
m
..~
APPEllD] X r.
NEC If0[R'dLL 195c
- 1.
1/3/ 64 Rt ting and Trans ittai Slip to lppolite, Seyf rit Hetcon, and Blatt w/ attache: functional chert of Intg
?.
1/4/64 Me o to C. J. Helte.es f ro-Rct.c r t Mi nogst sub,1e-t -
C DM"E N'S Oh Lli OF LE' C0"; L* E*C APPL ICid:DM F0; WE Nr: D DSTEM
~.
1/6/E' Me c tc. Jotr. Clart f rc-f recerick Hett:' i;t:ect:
REVIEa' 0 STAi:STICAL METH3D5 F0: NPRDS 4.
1/6/64 Me o to Clemens Helte.es f ron Ja.es O'Reilly subject:
REQUEST FOR COMMENTS Oh LIST Of KEY COMPONENT APPolCATIONS FOR THE NPRD SYSTEM w/ enclosures 5.
1/9/84 Mem to Guy Cunningham from C. J. Heltenes subject:
PUBLIC ACCESS TO NPRD5 DATA w/ enclosures 6.
1/22/54 Notification of Contract Execution with Southwest Research Institute, Continued Develop:<r.t and Operation of the Nsclear Plant Reliability Data System (NPRDS) w/ contract 7.
1/1 6/54 Me c to Cle ens Heltemes fror. Richard Deiounc subject:
COMMENTS ON LISTS OF KEY COMPONENT APPLICATIONS FOR THE NPRD SYSTEt1 w/ enclosures 8.
1/16/84 Memo to Minogue, Barry, Denton, DeYoung, Davis, and Regional Administrators from C.~ J. Heltemes subject:
NUCLEAR PLANT RELIABILITY DATA (NPRDS) SYSTEM SD*,lANNUAL EVALUATION REPORT
- Withheld in Part
~...
APPEND 11 K NRC IN1[RNAL
~
UNDAT[D 1.
Undated NPRD5 Quality Assurance and Data Review, Idaho Falls, Idaho 2.
Undated FY 1952 Program Brief, Office of Nutlear Regulatory Research, Division of Risk Analysis Draf t Letter to E.P. Wilkinson fror t. Michelson; Access to 3.
Undatec Foreign Information 4.
Uncated Draf t Memorandum to C. J. Heltemes fror J. P. O'Reilly; NPRDS Proposed Reportable Scope s
?
I I
e g, '
LISTING OF INP0 INTERNAL RECORDS i
APPENDIX - 1980 1.
Undated INPO Alternative to NRC Rulemaking on Radiological Protection Plans 2.
1/17-18 Agenda for Meeting of NPRDS Users Group 3.
3/21/8 0 Joint Memorandum on Processing of LER's and Significant Events by NSAC and INPO - signed by E. P. Wilkinson and E. L. Zebroski w/ attached Chart 4
i O
i i
..n...
'r APPENDIX H APPEND]X - 1981 1.
7/15/81 "The Institute of Nuclear Power Operations an Update" by Dr. Zack T. Pate 2.
9/25/81 Memo for R. L. Haueter et. al. from B. L. Cohn re: Memorandum of Agreement Meeting Number 2 with NRC on September 18, 1981 3.
10/30/81 Letter from E. P. Wilkinson re: Status of the Industry's Nuclear Plant Reliability Data System 4
11/9/81 Memo for R. L. Haueter from R. L. Simard re: WPP55 Report,
" Evaluation of GADS vs NPRD5" w/ attached letter dated 10/28/81 and Statistical Analysis of NPRDS Failure Data Involving Pumps or Valves dated 10/81 5.
11/19/81 Letter to R. L. Haueter from A. W. Weyrauch re: Nuclear Plant Reliability Data Minutes of ANS 58-20 Subcommittee Meeting Held on October 8-9, 1981 in Atlanta Georgia w/ enclosures e
--w,,
1
\\
Re:
FOIA-84-44 a-APPENDIX H APPENDIX - 1982 1.
1/82 Institute of Nuclear Power Operations Evaluation Release Policy 2.
1/18/82 Memo to E. L. Zebroski and R. L. Haueter from R. L. Simard re: Update of 12/30/81 Memo on NPRDS Session at 9th Annual Reliability Conference 3.
1/R.f82 Memo to Members of Data Usage Working Group from R. L. Simard re: NPRDS Technical Asvisory Committee Meeting at INP0 on 2/4-5/82 w/ attached Agenda 4.
1/25/82 Accreditation of Nuclear Utility Training Basic Concepts
- 5.
1/83 INP0 Directory 9
6.
4/23/82 Letter to R. L. Haueter from A. Weyrauch; Meeting minutes for NPRDS User Group Meeting, Feb. 4-5, 1982 in Atlanta, GA.
- my
- Withheld in Entirety W
i
~
Re:
F0IA-84-44 APPE!! DIX H APPENDIX - 1984 1.
1/3/84 Memo signed by E. P. Wilkinson re: Classification and Distribution of INPO Publications w/ attach Letter to Non-Member or Non-Participant Requesting INPO Documents t
~
N o
l
.. -.. ~
~
t LIST OF MISC. DOCUMENTS FROM OTHER ORGANIZATIONS REGARDING INPO e
s.
l.
Undated Handwritten note ref:
NPRDS Data (parts illegible) 2.
Duplicate Eliminated 3.
Duplicate Eliminated 4
Duplicate Eliminated 5.
5/28/80 Letter to B. Tashjian from Marilyn Weber ref:
N18.20 group to ANS-58.20 subcomr.ittee 6.
6/4/80 Changes to ANS-58.20 listing
- 7. 12/2/80 Letter to R. Haueter from R. Addy ref:
ANS N58.20 Data Reporting Working Group w/ attachments t
8.
9/16/80 Letter to Arthur Ducnarme from Benjamin Tashjian ref:
Task Plan for the Nuclear Plant Reliability Data System (NPRDS) Research Study w/ attachment 9.
11/6/80 Letter from Rawley Johnson ref:
NPRDS PROGRESS AND PROJECTION REPORT w/ attachment 10.
12/5/80 Letter to David Rubinstein from Benjamin Tashjian ref:
Coments on NPRD 1979 Annual Report 11.
2/18/81 Letter from B. Logan'ref:
Proposed Reportable Systems Lists w/a ttachments 12.
2/19/81 Letter to NPRDS Participants from Arthur Weyrauch ref:
NPRDS Special Report Policy and Report Writer Training 13.
2/27/81 Letter to NPRDS Participants from Arthur Weyrauch ref:
NPRDS Special Report Policy and Report Writer Training w/ attachments 14 Eliminated 15.
Duplicate Eliminated 16.
Duplicate Eliminated 17.
5/22/81 Note to Multiple Addressees from Benjamin Tashjian ref:
ANS-58.20 Subcont.ittee Meeting held in San Antonio, Texas 5/15/81
-a-m 18.
5/29/81 Letter to Members from Robert Abdy ref:
ANS 58.20 Data Reporting Working Group w/ attachment 19.
5/26/81 Note to Multiple Addressees from Benjamin Tashjian ref:
ANS-58.20 Subcommittee meeting held in San Antonio, Texas 5/15/81 20.
6/81 Report entitled:
Evaluation of Generation Availability Data System (GADS) vs Nuclear Plant ReliaMiity Data System.
(NPRDS) 21.
9/24/ 81 Letter to Multiple Addressees from W. Cooper ref:
Summary of Unusual Occurrence Reports for August 1951 w/ attachment 22.
1 0/ 6/ 81 Letter to R. Haueter from Robert Addy ref:
Component Failure Reporting to the NPRD System 23 I 12/23/81 Wote to Members from Benjamin Tashjian ref:
Data Usage Working Group meeting w/ enclosure
- 24.
1/8i-7/82 Quality Assurance and Data Review of tne Nuclear Plant Reliability Data System Task 1C w/ attachments 25.
1/19/82 Memo to Members, etc. from Richard Eckert ref:
Proposal for Formation of a Nuclear Plant Construction (Quality) Management Evaluation Program w/ enclosure 26.
1/25/82 Memo to All NPRDS Participants from Cathy Mosley ref:
NPRDS Input Data Error Analysis Report of January 18, 1982 w/ attachment 27.
2/2/82 Letter to R. Haueter from David Finnicum ref:
NPRDS Technical Advisory Committee meeting w/ attachments 28.
2/9/82 Memo to Data Reporting Working Group Merbers from R. Addy ref:
Meeting Notice Dupl'cate El.iminated 29.
i 30.
5/18/82 Memo to Data Reporting Group MemSers from R. Addy ref:
NPRDS Failure Modes - Output Report w/ attachments
- 31.
5/4/82 Letter to John Collins from Donald Rueter ref:
Arkansas Nuclear One Units 1 & 2 4
32.
5/24/82 Letter to F. Hebdon from David Finnicum ref-Minutes of first meeting of NPRDS Engineering Data Working Group w/ enclosure 33.
5/26/82 Letter to R. Addy from J. Legg ref:
NPRDS Failure Modes and
~
Definition 34.
4/19/82 Memo to Reportable Scope Working Group Members from Benjamin Tashjian ref:
NPRDS Reportable Systems and Component Scope Manual 35.
4/22/82 Letter to Arthur Weyrauch from David Finnicum ref:
NPRDS Engineering Data Working Group Meeting w/ attachments
- Withheld in Entirety
- Withheld in Part
36.
S/6/82 Report f rom M. Stewart to R. Dennig ref:
NPRDS Quality Assurance and Data Review 37.
6/3/82 Memo to Carlyle Michelson from S. Milam ref: A6290-NPRDS Quality Assurance and Data Review w/ attachments 38.
6/4/82 Report from Carl Lovell to Robert Dennig ref:
NPRDS Quality Assurance and Data Review for Tasks I and 2, Phases l A and 2A 39.
6/29/82 Meno to Members of Engineerin; Data Working Group from D. Finnicum ref:
Second Working Group Meeting w/ enclosures 40.
7/9/82 Letter to Walter Sullivan from Cathy Mosley ref:
Request from nrc for NPRDS Updated Data Base Tape w/ enclosure 41.
9/17/82 Notegram to Bob Dennig from John Linebarger w/ enclosure 42.
9/3/82 Letter to Ben Cone from Peter Quittmeyer ref:
Employees' Confidentiality Agreement w/ enclosure 043.
9/8/82 Notegram to Bob Dennig frcr Walt Sullivan ref:
Revised Phase IB report.
44.
12/16/82 Letter to Ronald Simard from R. Addy ref:
NPRDS Users Group Meeting Information w/ attachment 45.
2/17/82 Letter to J. L. Crooks from J. R. Buchanan re:
INP0 50ER's.
46.
6/6/83 Memo to Clemens Heltemes from S. Milam ref:
A6290 NPRDS QUALITY ASSURANCE AND DATA REVIEW - Revision I w/ attachment 47.
6/27/83 Letter to NPRDS Users Group from B. Logan ref:
August 9 and 10 Meeting at INPO w/ attachment o48.
10/83 Draft report Quality Assurance and Data Review of the Nuclear Plant Reliability Data Systen, Year Ending 7/31/83 49.
11/3/83 Letter to B. Logan from Robert Addy ref:
Recommendations concerning component failure definition and failure report w/attachr,ent
- Withheld in Entirety i
fx
~
APPENDIX J 84-44 LISTING OF NRC CORRESPONDENCE SENT TO INP0 1.
5/30/80 letter from Carl Michelson to Randall Pack
Subject:
Discussions on Operational Data Analysis w/ enclosures AEOD Work Plan and Proposed Cooperative Agreement (18 pages) 2.
8/12/80 Letter from Thomas Murley to Eugene Wilkinson re:
LOFT Division of EG&G (1 page) 3.
10/10/80 Letter from Carlyle Michelson to Stephen Rosen
Subject:
Paper On Operational Data Assessment To Be Presented In Stockholm, Sweden On October 20, 1980 w/ enclosure NRC Trends in The Evaluation And Implementation Of Safety-Related Operating Experience (24 pages) 4 c
_j
M y
84-48 APPENDIX J NRC TO INPO 1981
~
1.
1/22/81 Letter from Frederick Hebdon to Robert Haueter
Subject:
Integrated Operational Experience Reporting System w/ enclosure Collection of operating experience (10 pages) 2.
1/28/81 Letter from William Dircks to R. L. Haueter re:
Integrated Operational Experience Reporting System w/ enclosure E. P.
Wilkinson letter (3 pages) 3.
5/5/81 Letter from Carlyle Michelson to Robert L. Haueter re: NPRDS Activities within the NRC (1 page) 4.
9/18/81 Letter from Carlyle Michelson to Eugene Wil kinson re:
Inte-grated Operational Experience Reporting System w/ enclosure Draft to be reviewed (9 pages) 5.
10/29/81 Letter from William Dircks to E. L. Zebroski re:
NRC Document Control System w/ enclosure INPO Access To NRC DCS Estimated Cost Reimbursement To NRC (2 pages) 6.
2/25/81 Letter from C. Michelson to E. P. Wilkinson re:
Memorandum of Agreement (M0A) 7.
5/26/ 81 Letter from W. J. Dircks to E. P. Wilkinson re:
Changes to Memo of Agreement
)
\\
E:-4:
APPENDIX J NRC TO INPO 1982 1.
1/11/82 Letter from Harold Denton to E. P. Wilkinson re:
Significant Event Evaluation and Information Network (1 page) 2.
2/22/82 Letter from C. J. Heltemes to Dr. Ed Zebroski re:
Need for Vic's office and the CRGR (1 page) 3.
2/23/82 Letter from Carlyle Michelson to E. P. Wilkinson
Subject:
Participation on the NPRDS Technical Advisory Corrnittee (INP0 letters dated December 30, 1981 and January 7,1982) l (1 page) 4.
3/17/82 Letter from Fred Hebdon to Art Weyrauch and John Parris
Subject:
Generic Systen Descriptions And Drawings w/ enclosure Sample of system description used in IE training courses 51 pages) 5.
4/29/82 Letter from Jack Heltemes to Ben Cohn re:
LER rule (1 page) 6.
4/30/82 Letter from Carlyle Michelson to R. L. Haueter re:
Limitations on the use of NPRDS w/ enclosure Nuclear Plant Reliability System Quality Assurance and Data Review (8 pages) 7.
5/10/82 Letter from C. Heltemes to Robert Haueter re:
Draft Report on NPRDS (1 page) 8.
5/19/82 Letter from Carlyle Michelson to Robert Smith re:
INPO's request for access to operating experience (1 page) 9.
5/26/82 Letter from Carlyle Michelson to Dr. Ed Zebroski re:
Nuclear ~
Plant Reliability Data System (1 page) 10.
6/18/82 Letter from Robert L. Dennig to Art Weyrauch re:
Request for a tape of the complete NPRDS (1 page) 11.
7 / 12 / 8 2 Letter from William Dircks to E. P. Wilkinson re:
Activities of INPO w/ enclosure ltr. from Wilkinson to J. Collins (4 -pages)
- 12. 8/24/82 Letter from William Dircks to E. Wilkinson re:
Coordination Plan for NRC/INPO Appraisal and Evaluation Activities" w/ enclosure Appendix No. 2 Coordination Plan for NRC/INPO Appraisal and Evaluation Activities (5 pages) 13.
9 /17/82 Letter from Carlyle Michelson to R. Haueter re:
NPRDS Audit Report (1 page) 14.
9/20/82 Letter from William Dircks to E. Wilkinson re:
Radiological Protection Activities Coordination Plan (1 page) 15.
9/28/82 Letter from Carlyle Michelson to E. Wilkinson re:
Distribution Of INPO Reports To ACRS (1 page)
APPENDIX J NRC TO INPO 1982 2
16.
10/1/82 Letter from C. Heltenes to Robert Haueter re:
NPRDS Program Plan (1 page)
~
17.
10/15/82 Letter from Eva Szent-Ivany to Stephen Rosen re:
INP0/NRC Agreenent on Operational Data (1 page) 18.
10/28/82 Letter fron Carlyle Michelson to E. Wilkinson re:
CEC Abnorral Occurrence Reporting System (1 page) 19.
11/9/82 Letter from Karl Seyfrit to Ben Cohn
Subject:
Technical Discussions AEOD/INPn (2 pages) 20.
12/3/82 Letter from Eva Szent-Ivany to Stephen Rosen re:
INP0/NRC Agreenent on Operational Data (1 page) 21.
8/4/82 Letter from R. L. Dennig from A. Weyrauch re:
Request for a NPRDS tape through the 2nd quarter 22.
4/20/82 Letter from W. J. Dircks to E. P. Wilkinson re:
The Memorandum of Agreement 23.
8/82 Letter from W. J. Dircks to E. P. Wilkinson, enclosing signed copy of Appendix Two to the MOA 24.
7/23/82 Letter from Gina F. Thompson to R. Haueter documenting missing INP0 SER's 25.
12/15:/82 Letter from C. Michelson to E. P. Wilkinson re:
Continued cooperation on information exchange Letter from C..ichelson to R.S. Smith re: HEA abnormal op'erating 26.
3/9/82 M
experience data (IRS reports) 27.
6/18/82 Letter from C. flichelson to E.P. Wilkinson; Transnittal of Proposes Draft Regulatory Guide on Periodic Testing of Motor-0perated Valves 29.
6/30/82 Letter from J.D. Lafleur, Jr.. tor.S.L. Rosen re copies of foreign experience reports received from OECD/NEA
{.
f E: 44 APPENDIX J NRC TO INPO 1983 t
1.
1/5/83 Letter from Carlyle liichelson to Eugene Wilkinson
Subject:
Transnittal Of AEOD Engineering Evaluation And Case Study Reports To IIPO (1 page) 2.
1/10/83 Letter from Carlyle liichelson to E. Wilkinson re:
NPRDS Report (1 page) 3.
2/10/83 Letter from Robert Dennig to Ron Simard re:
FG&G's Sumary of flPRDS (1 page) 4.
2/16/83 Letter from William Dircks to Eugene Ililkinson re:
Inpo Documents (1 page) 5.
3/3/83 Letter from William Dircks to E. Wilkinson re:
Radiological Protection Activities Coordination Plan w/ enclosure Coordina-tion Plan For NRC/INPO Radiological Protection Activities (3 pgs) 6.
3/31/83 Letter from C. Heltemes to E. Zebroski re:
INPO Reports Concerning Operational Experience w/ enclosure Missing Significant Event Reports (3 pages) 7.
4/5/83 Letter from Hillian Dircks to E. Wilkinson re:
Coordination Plan for NRC/INPD Training Related Activities w/ enclosure Coordination Plan (12 pages) 8.
4/8/83 Letter from C. Heltemes to Eugene Wilkinson
Subject:
Access TO Foreign Infomation w/ enclosure Hote to Michelson from J. Lafleur re: Draft Ltr. Michelson to Wilkinson (3 pages) 9-Thinlicate Fliminated 10.
5/24/83 Letter from William Dircks to E. Hilkinson re:
INP0's effort (1 page) 11.
7/19/83 Letter from Frederick Hebdon to Ron Simard re:
HPRDS Audit Program (1page) 12.
7/19/83 Letter from C. Heltemes to Bruce Logan re:
Hebdon replacing Heltemes (1 page) 13.
7/26/83 Letter from C. Heltemes to Eugene Wilkinson
Subject:
Access To Foreign Information (2 pages) 14.
9/12/83 Letter from C. Heltemes to Steven Rosen re:
Power Reactor Events w/ enclosure 1tr. from Heltemes to W. Layman (4 pages) 15.
9/21/83 Letter from Robert Dennig to Ron Simard re: EG&G Report On NPRDS (1 page) 16.
10/20/83 Letter from William Dircks to E. Wilkinson re: Evaluations byINPO(1page)
L
APPENDIX J NRC TO INP0 1983 84-44 17.
11/7/83 Letter from Eugenia Boyle to Daniel Reilly re:
LER Microfiche (1 page) 18.
11/23/83 Letter from llillian Dircks to E. Uilkinson re:
Coordination Plan for llRC/INPO Training-Related Activities w/ enclosure Coordination Plan (9 pages) 19.
12/19/83 Letter fron C. Heltenes to Eugene Wilkinson
Subject:
Public Access To NPRDS Data w/ enclosure llRC Needs Llith Regard To NPRD5 (9 pages) 20.
11/23/83 Letter fron William Dircks to E. tiilkinson re:
Coordination Plan for NRC/lllPO Training-Related Activities w/ enclosure Coordination Plan (8 pages) 21.
12/19/83 Letter from C. Heltemes to Eugene Wilkinson
Subject:
Public Access to NPRDS Data w/ enclosure NRC Needs tlith Regard To NPRDS (5 pages) 22.
4/22/83 Letter from E. L. Boyle to R. Simard re:
Authorization to INP0 to provide NPRDS data to NRC contractors l
l 1
^
84-44 NRC TO ]NPO 1984 1.
1/?S/84 Letter from C. Heltenes to Ron Simard re:
Instrunentation Reporting Problem (1 page) 2.
Duplicate Eliminated 3.
Undated Letter from C. Michelson to E. Wilkinson re:
Proposed LER Rule (2 pages)
D
.--.d
Re:
FOIA-84-44 I
APPENDIX I APPENDIX - 1981 1.
1/15/81 Memo for Members - ANS 58-20 Subcommittee from R. L. Haueter Actions en NRC Proposed Integrated Operational Experience re:
Reporting System w/ attached letters dated 12/16/80 2.
2/13/81 Letter to W. J. Dircks from E. P. Wilkinson re: Safety in the Operations of Domestic Nuclear Power Plants 3.
5/20/81 Letter to C. Michelson from R. L. Haueter re: INP0 Review of Integrated Operational Experience Reporting System Draft 4.
6/2/81 Letter to W. J. Dircks from M. B. Hobby re: INP0/NSAC-NRC Memorandum of Agreement w/ enclosed Agreement 5.
7/9/81 Letter to W. J. Dircks from E. P. Wilkinson re: Supporting Operational Excellance 6.
7/29/81 Letter to C. Michelson from R. L. Haueter re: Meeting with 1
NRC on Memorandum of Agreement 7.
8/6/81 Letter to H. R. Denton from E. P. Wilkinson re: SEE-IN Program Description w/ attached Significant Event Evaluation and Information Network dated 11/80 8.
8/20/81 Note to Carl from Bob re: Formal Transmittal of the SEE-IN Program Description w/ attachments 9.
8/24/81 Letter to C. Michelson from R. L. Haueter re: The Nuclear Plant Reliability Data System-10.
8/28/81 Memo for ANS-58-20 Subcommittee from R. L. Haueter re: Attached Commission Paper on Deferring Action on IOER 11.
9/18/81 Agenda for INP0/NSAC/NRC Meeting w/ attachments 12.
9/23/81 Memo for ANS-58.20 Subcommittee Members from R. L. Haueter Tour of INP0 Computer and Records Management Facilities re:
w/ attachments 13.
9/29/81 Memo for ANS-58-20 Subcommittee Members from R. L. Haueter re:
Subcommittee Meeting October 8 and 9, 1981 w/ attachments 14.
10/1/81 Letter to E. L. Boyle from 8. L. Cohn re: Numbering Scheme for Foreign Nuclear Reactors w/ attachment 15.
10/5/81 Letter to W. J. Dircks from E. L. Zebroski re: NRC Document Control System w/ attachments
- =
Re:
F0IA-84-44 APPENDIX - 1981 16.
11/6/81 Letter to C. Michelson from E. L. Zebroski re: INP0/NSAC Significant Operating Experience Report (letter only) 17.
12/14/81 Letter to W. J. Dircks from E. P. Wilkinson re: Alternate Approach to NRC Rulemaking on Radiological Protection Plans 18.
12/21/81 Letter to C. Michelson from S. L. Roson re: Comments on Events Included in the Draft July-August 1981 Issue of Power Reactor Events w/ attachment 19.
3/20/81 Memorandum to C. Michelson from Zack Pate; Minutes of 3/17/81 Meeting at INP0 20.
5/1/81 Letter to W J. Dircks from E. P. Wilkinson re:
Potential impact of rulemaking described in SECY 81-84 9
21.
5/ 2 0/ 81 Letter to W. J. Dircks from E. P. Wilkinson discussing the impacts of the educational requirements contemplated in SECY 81-84 22.
5/2 0/ 81 Letter to W. J. Dircks from E. P. Wilkinson; Personnel Development Program for the' Nuclear Industry 23.
6/3/81 Letter to S. Scott from S. L. Rosen; RAPICOM EQUIP-NUCLEAR INDUSTRY 24.
7/1/81 Memo to Messrs. Dircks, Stello, Denton from E. P. Wilkinson INP0/NSAC Interface,
25.
5/11/81 Letter to C. Michelson from R. L. Haueter acknowledging Eugenia Boyle as ANS-58.20 Subconnittee Member
y.
i Re:
F01A-84-44 APPENDIX I APPENDIX - 1982 1.
1/5/82 Letter to C. Michelson from S. L. Rosen re:
the IAEA Advisory Group 2.
1/7/82 Letter to C. Michelson from R. Simard re: NPRDG Technical Advisory Committee 3.
1/12/82 Memo to NPRDS Technical Advisory Committee from R. L. Haueter re: Technical Advisory Comittee Meeting dated 2/4-5/82 w/ attached Agenda 4.
1/25/82 Letter to W. J. Dircks from E. P. Wilkinson re: Draft Modified Memorandum of Agreement w/ attachment 5.
3/19/82 INP0 Status and Evaluation Program by E. P. Wilkinson 6.
3/19/82 Letter tc W. J. Dircks from E. P. Wilkinson re: Progress on Memorandum of Agreement and Supplements w/ attachment 7.
4/2/82 Letter to C. Michelson from R. L. Haueter re: Request for NP.RDS Data Base Tape 8.
4/13/82 Memo to Members, NPRDS Users Group from R. L. Haueter re:
Meeting of NPRDS Users Group 9.
4/15/82 Letter to James Taylor from R. K. Seiberling re: INP0 By-Laws and the INP0 Certificate of Incorporation w/ attachments 10.
4/16/82 Letter to C. Michelson from C. J. Ver Steeg re: INP0's Confidentiality Statement and Access to Foreign Operational Data 11.
5/3/82 Letter to C. J. Heltemes from S. L. Rosen re: Power Reactors Events, Vol. 4, No. 1 12.
5/19/82 Letter to E. L. Boyle from T. N. Branum re Licensee Event Reports Received at INP0 During the First Quarter of 1982 i
13.
5/20/82 Letter to C. Michelson from R. L. Haueter re: NRC Representation on the NPRDS Users Group 14.
6/8/82 Letter to C. J. Heltemes, Jr., from S. L. Rosen re: Draft of Power Reactor Events, Vol. 4, No. 2 15.
6/10/82 Rapifax to J. Heltemes from B. L. Cohn re: Draft of INP0's NPRDS Progress Report w/ attachment i
16, 6/29/82 Letter to R. L. Dennig from A. W. Weyrauch re: HPRDS Data Base i
[J-Re:
F05A-84-44 APPENDIX - 1982 17.
7/15/82 Letter to C. Michelson from E. P. Wilkinson re: INP0 Significant Event Reports and Significant Operating Experience Reports w/ attachments 18.
7/23/82 Letter to C. Michelson from E. P. Wilkinson re: Freedom of Information Act R2 quest No.82-261 w/ attachments
- 19.
8/2/82 Letter to James Taylor from Z. T. Pate re: Comparison Made of INP0 and PAT Reports w/ attachments 20.
Duplicate Eliminated 21.
8/5/82 Letter to C. J. Hel; emes, Jr., from S. L. Rosen re: Draft of Power Reactor Events, Vol. 4, No. 3 22.
8/6/82 Letter to G. F. Thompson from R. L. Haueter re: INP0 SERs
' _ ~_ 23.
8/9/82 Letter to C. J. Heltemes from R. L. Haueter re: Users Group Charter w/ attachment 24.
8/10/82 Letter to C. J. Heltemes from R. L. Haueter re: INP0 Progress Report on NPRDS
- 25. 8/12/82 Letter to R. L. Dennig from A. W. Weyrauch re: NPRDS Data Base 26, 9/13/82 Letter to C. J. Heltemes from R. L. Haueter re: NPRDS Program Plan 27.
9/28/82 Letter to C. Michelson from E. L. Zebroski re: Release to INP0 NRC Foreign Operational Data w/ attachment 28.
10/14/82 Letter to C. J. Heltemes from S. L. Rosen re: Comments on'the Draft of Power Events May. lune 1982, Vol. 4, No. 4 w/ attachment 29.
11/1/82 Letter to W. J. Dircks from E. P. Wilkinson re: Drug Awareness Policy in the Industry w/ attachment 30.
11/4/82 Letter to R. Dennig from R. Simard re: NPRDS Users Group and its Membership Expansion 31.
12/6/82 Letter to H. L. Thompson, Jr., from Z. T. Pate re: Performance Objectives and Criteria for Corporate Evaluation and Assistance Visits
- Withheld in Entirety
Re:
FOIA-84-44 APPENDIX - 1982 32.
12/10/82 Letter to C. Michelson from E. L. Zebroski re: Request for Input from INPO Relative on the Current Status of Utility Participation in NPDRS w/ attachments 33.
12/16/82 Letter to W. J. Dircks from E. P. Wilkinson re: Manaqement of NPRDS 34.
12/17/82 AGENDA - NIP 0/SWRI/NRC/INEL Meeting 35.
12/20/82 Rapifax to C. J. Heltemes from R. Simard re: Management of NPRDS 36.
12/22/82 Letter to W. Dircks from E. P. Wilkinson re: INP0 Prcgress Since Assuming Management of the NPRDS 37.
12/28/82 Letter to C. Michelson from E. P. Wilkinson re: Expansion in i
the Flow of Infonnation on Operational Data 38.
12/31/82 Letter to Members of the NPRDS Users Group from R. L. Simard re: Meeting of the NPRDS Users Group w/ attached Agenda 39.
2/18/82 Letter to C. Michelson from S. L. Rosen attaching draft technical items agenda for review and coment 40.
7/22/82 Letter to W. J. Dircks from E. P. Wilkinson re: Work on the memo of Agreement 41.
8/2/82 Letter to C. Michelsbn from R. L. Haueter; Access to Data Bases on INP0's Computer 42.
11/23/82 Letter to H. L. Thompson from E. P. Wilkinson; audit of the SEE-IN Program 43.
5/5/82 Letter to C. Michelson from M. K Dunkle enclosing profiles of INP0 member utilities 1
t
APPENDIX I APPENDIX - 1983 1.
1/19/83 Letter to E. L. Boyle from T. N. Branum re: Microfiche Containing all Licensee Event Reports Revieved by INP0 During the First Three Quarters of 1982 2.
1/31/83 Letter to C. J. Heltemes from S. L. Rosen re: Draft Power Reactor Events, Vol. 4, No. 5 w/ attachment 3,
2/16/83 Memo for J. Taylor and H. Thompson from Z. T. Pate re:
NRC/INPO Coordination Plans w/ attachments 4.
2/22/83 Letter to Linda Stoloff from D. G. Smith re: NRC Briefing w/ attachments 5.
2/28/83 Letter to E. L. Boyle from T. N. Branum re: Microfilm of 1981 Licensee Event Reports Received by the Institute 6.
3/1/83 Letter to C. J. Heltemes, Jr., from S. L. Rosen re: Comments on Draft of Power Reactor Events, Vol. 4, No. 6 7.
3/10/83 Letter to W. J. Dircks from E. P. Wilkinson re: Copy of CRGR Agenda (letter only) 8.
3/10/83 Letter to E. L. Boyle from T. N. Branum re: tiicrofile Containing all of the Licensee Event Reports Received by INPO During the Fourth Quarter of 1982 9.
3/24/83 Letter to J. Heltemes from A. S. Howard re: INP0 SEE-IN Program Plan 10.
3/30/83 Significant Event Evaluation and Information Network (SEE-IN)
Presentation 11.
Duplicate Eliminated 12.
~'
4/8/83 Letter to C. J. Heltemes from S. L. Rosen transmitting SER
- 's 18-83, 20-83, 7.1-83, and 7.7. A3. (letter only) 13.
4/21/83.
Letter to W. J. Dircks from E. P. Wilkinson re: Proposed Council of Nuclear Inspection Organizations w/ attachments Duplicate Eliminated
- 14. 4/29/83 Letter to C. J. Heltemes, Jr., from S. L. Rosen re: NRC Document Control System i
l
i APPENDIX - 1983 15.
5/3/83 Letter to C. J. Heltemes, Jr., from E. P. Wilkinson re: Access to Foreign Information w/ attachment 16.
5/3/83 Letter to C. J. Heltemes, Jr., from S. L. Rosen re: SERs Released to the NRC 17.
5/11/83 Letter to R. L. Dennig from S. L. Rosen re: NPRDS Reportable System and Component Scope Manual 18.
5/20/83 Letter to W. J. Dircks from E. P. Wilkinson re: NPRDS Briefing to the Commissioners w/ attachment 19.
5/24/83 Letter to C. J. Heltemes, Jr., from S. L. Rosen re: Draft of Power Reactor Events, Vol. 4, No. 7 20.
5/27/83 Presentation by Representatives of the Institute of Nuclear Power Operations to the Commissioners, Nuclear Regulatory 4
Commission on Nuclear Plant Reliability Data System 21.
6/2/83 Letter to W. J. Dircks from E. P. Wilkinson re: Fitness for Duty w/ attachment 22.
6/3/83 Letter to R. Fraley from E. P. Wilkinson re: Advisory Committee on Reactor Safeguards w/ attachment 23.
6/7/83 Letter to W. J. Dircks from E. P. Wilkinson re: Commitment to NPDRS on VEPCO's Part-w/ attachment 24.
6/20/83 Letter to C. J. Heltemes from S. L. Rosen re: INPO Summarized Utility Commitments to Begin or Resume Participation in NPDRS w/a ttachment 25.
6/27/83 Letter to C. J. Heltemes from S. L. Rosen re: Proposed Semi-Annual NPRDS Progress Report to the Commissioners 26.
7/5/83 Letter to B. Jones from A. S. Howard re: INP0 Evaluation Reports l
27.
Duplicate Eliminated 28.
7/28/83 Letter to R. Major from S. J. Rosen re: Comments on the Draft NPRDS Reportable Scope Manual w/ attachment 29.
8/12/83 Memo. for NPRDS Users Group from R. L. Simard 're: Meeting Minutes
-.-.s
,.-,,_y..v_
,_..__.m._e..y, r.
e
APPENDIX - 1983 30.
8/15/83 Letter to C. J. Heltemes, Jr., from S. L. Rosen re:
Draft Power Reactor Events, Vol. 5, No. 1 31.
8/16/83 Letter to E. Boyle from D. T. Reilly re: Microfiche of the Licensee Event Reports 32.
9/13/83 Letter to E. L. Boyle from J. T. Wheelock re: Printout of Foreign Dockets w/ attachment 33.
9/25/83 Memo for Jack Roe from Zack Pane re: INP0 Interactions with GA0 and OMB w/ attachment 34.
9/26/83 Letter to C. J. Heltemes from S. L. Rosen re: Draft " Power Reactor Events", Vol. 5, No. 2 35.
9/27/83 Letter to E. Boyle from T. N. Branum re: Licensee Event Report Microfiche 36.
10/18/83 Letter to W. J. Dircks from E. P. Wilkinson re: Replacement 37.
10/19/83 Letter to J. Ebersole from R. L. Simard re: Uncontrolled Set of the NPRDS Reportable System and Component Scope Manual (letter only'.
38.
11/7/83 Letter to J. J. Ray from E. P. Wilkinson re: Presentation to the ACRS by INPO Representative 38 a.11/11/83 Letter to C. J. Heltemes, Jr., from S. L. Rosen re: Draft of Power Reactor Events 39.
11/15/83 Letter to W. J. Dircks from E. P. Wilkinson re: Coordination Plan for NRC/INP0 Training-Related Activities 40.
11/18/83 Letter to C. J. Heltemes, Jr., from S. L. Rosen re: Data Tapes gd Acer oging Documentation for the Complete NPRDS Record File m
41.
11/28/83 Letter to C. J. Heltemes, Jr., from Z. T. Pate re: Abnormal Occurrence Reporting System Reports Available to INPO 42.
12/13-14/ tJPRDS Users Group - Meeging Agenda w/attachnents 1983 43.
12/19/83 Memo for NPRDS Users Group from R. L. Simard re: Minutes -
NUG Meeting No. 4 44 12/19/83 Letter to C. J. Heltemes from S. L. Rosen re: INP0's Plans to Restore the Viability and Effectiveness of the NPRDS w/ attachments
APPENDIX - 1983 45.
12/29/83 Letter to C. J. Heltemes from E. P. Wilkinson re: Release of Nuclear Plant Reliability Data System Data w/ attachment 46.
3/3/83 Letter to W. J. Dircks from E. P. Wilkinson re:
Coordination Plans 47.
5/20/83 Letter to J. Heltemes from S. L. Rosen attaching 2 copies of the INP0 briefing to the NRC Commissioners 48.
1/18/83 Letter to C. Michelson f rom E. P. Wilkinson re:
Release of International Experience to INP0 49.
7/29/83 Letter to C. J. Heltemes from S. L. Rosen forwarding SER's and 0&MR's (letter only)
- 50. '8/12/83 Letter to C. J. Heltemes from S. L. Rosen enclosing 150ER and an updated list of SOER's issued in 1983 (letter only) 51.
1/12/83 Letter to W. J. Dircks from E. P. Wil kinson re:
the benefit of a central NRC point of contact f:r INFO documents 52.
10/18/83 Letter to C. J. Heltemes from S. L. Rosen forwarding SER's 67-83, 68-83, and 70-83 (letter only)
Re:
FOIA-84-44
)
APPENDIX I APPENDIX -1984 1.
1/5/84 Memo to NPRDS Users Group from R. L. Sinard re: Followup Mailing - NUG Meeting No. 4 w/ attached Exclusion of Data Outside of the NPRDS Basic Reportable Scope During Normal Retrieval 2.
1/10/84 Letter to C. J. Heltemes, Jr., from S. L. Rosen re: Comments on Draft Power Reactor Events Vol. 5, No. 4 w/ attached Comments 3.
1/11/84 Letter to C. J. Heltemes from S. L. Rosen forwarding 16 reports e
t e_
S d
r j
APPENDIX L LIST OF NRC DOCUMENTS TO OTHER F0lbB444 ORGANIZATIONS REGARDING INP0 1.
11/23/79 Letter to Carol Poole fron C. J. Heltenes re:
D]STRIBUTIO*i FOR MONTHLY NSAC " INDUSTRY REPORT" 2.
3/24/51 Letter to B. W. Legen f rom Fred Hebcor, re:
REPORTABLE SYSTEMS, INTEGRATED OPERATIONAL EXFERIENCE REPORTING SYSTEM w/ enclosures t
3.
6/81 NUCLEAR OPERATING EXPERIENCE EVALUATION PROGRAM - Attachment 6 4.
6/1 6/81 Letter to Bruce Babbitt from Carlyle Michelson re:
AGREEMENT WITH THE INSTITUTE OF NUCLEAR POWER OPERATIONS (INPO) w/ enclosure 5.
6/17/81 Letter to Rawley Johnson from Frederick Hebdon re:
ENERGY INDUSTRY IDENTIFICATION SYSTEM w/o enclosure 6.
7/6/81 Letter to Benjamin Tashjian from Frederick Hebdon re:
COMMENTS ON NPRDS SCOPING MANUAL w/ enclosure j
7.
9/18/81 Letter to David Rossin frort Carlyle Michelson re:
REDIRECTION OF INTEGRATED OPERATIONAL EXPERIENCE REPORTING (10ER) SYSTEM w/ enclosure 8.
1 0/9/81 IPRDS IN PLANT RELIABILITY DATA SYSTEM BY:
DAVID PIKE
- 9.
12/18/81 Letter to C. E. Williams from Carlyle Michelson re:
STANDARD ORDER FOR DOE WORK (50EW) w/ enclosure
- 10. 3/1/82 Letter to C. E. Willians from Carlyle Michelson re:
STANDARD ORDER FOR WORK (DOE 50EW) w/ enclosure
- 11. 5/27/82 Letter to R. J. Addy from M. J. Logan re:
NPRDS FAILURE MODES-
- 12. Undated UPDATE OF JUNE 1982 PROGRESS REPORT
- 13. 6/4/82 Letter to Bruce Logan from Frederick Hebdon re:
REVIEW 0F DESCRIPTIONS AND GENERIC DRAWINGS FOR (PWR)w/ enclosure
- 14. 6/25/82 Letter to Dcvid Finnicum from Frederick Hebdon re:
PROPOSED EN31NEERING DATA SECTIONS FOR GENERIC CLASSES GENERA AND PUMPXX w/ enclosure
- 15. 7/22/82
' Note to Bob from John Lineberger re:
COPY OF MONTHLY REPORT FOR A6290, NPRDS DATA ANALYSIS TASK w/ enclosure
- 16. 8/2/82 Letter to Robert Addy from Robert Dennig re:
SUGGESTED STRUCTURE FOR FAILURE MODE REPORTING w/ enclosure t-uu
- 17. 8/5/82 Letter to Richard Udell from J. M. Felton re:
~
ACCESS TO NINElEEN CATEGORIES OF DOCUMENTS w/ enclosures
- 18. 1/10/83 Note to INPO Data Users' Group from Bruce Logan re:
SCOPING WORKING GROUP REVIEW l
- Withheld in Part b
APPENDIX L LISTING 0F NRC DOCUMENTS TO OTHER ORGANIZATIONS REGARDING INPO 2
19.
1/11/S3 Letter to J. Solecki f rom B. Saf fell re:
NUELE AR PL AN! REll AEIL ITY DAT A SYST Ef' (fFRDS) DAT A ANALYSIS ( A6290) - Saf f-ll-S3 w/o enclosure 20.
1/18/83 Letter to C. Williams from Carlyle Michelsen re:
ST ANDARD ORDER FOR DOE WORT (50EW) w/ enclosure 21.
1/28/83 AGENDA ITEMS FOR A6290 TECHNICAL DISCUSSIONS ON FRIDAY,1/28/83 w/ enclosures 22.
2/17/83 Letter to David Rossin from C. Heltemes re:
NSAE-54 "USING PRA TO ASSESS NUCLEAR POWER PLANT OPERATING EVENTS
]
23.
4/13/83 Letter to Francois Motte from Joseph Lafleur re:
OPERATING AND INC] DENT INFORMATION SENT TO INPO 24.
8/3/83 Letter to John Clewett from J. M. Felton re:
F01A-83-336 25.
10/18/83 Letter to Troy Wade from C. Heltemes re:
STANDARD WORK ORDER FOR DOE (50EW) w/ enclosure 26.
10/18/83 Letter to Lelan Sillin from Thomas Roberts re:
TWO SECTIONS OF SECY-83-248 INPO EVALUATION PROGRAM AND GENERAL OPERATING CRITERIA 27.
10/10/80 Letter to C. Michelson from E. L. Zebroski.
28.
2/25/81 Letter to E. Zebroski from C. Michelson re: Memo of Agreement 29.
5/11/81 Letter to A. C. Millunzi from R. L. Haueter.
F01A-84-44 LIST OF MTSC. DOCUMENTS FROM OTHER ORGANIZATIONS REGARDING INPO l.
Undated Handwritten note ref:
NPRDS Data (parts illegible) 2.
Duplicate Eliminated 3.
Duplicate Eliminated 4.
Duplicate Eliminated S.
5/28/80 Letter to B. Tashjian from Marilyn Weber ref:
N18.20 group l
j to ANS-58.20 subcomittee 6.
6/4/80 Changes to ANS-58.20 listing
- 7. 12/2/80 Letter to R. Haueter from R. Addy ref:
ANS N58.20 Data Reporting
)
Working Group w/ attachments
{
l 8.
9/16/80 Letter to Arthur Ducharme from Benjanin Tashjian ref:
Task Plan for the Nuclear Plant Reliability Data System (NPRDS) Research Study w/ attachment 9.
11/6/80 Letter from Rawley Johnson ref:
NPRDS PROGRESS AND PROJECTION REPORT w/ attachment 10.
12/5/80 Letter to David Rubinstein from Benjamin Tashjian ref:
Coments on NPRD 1979 Annual Report 11.
2/18/81 Letter from B. Logan ref:
Proposed Reportable Systems Lists w/a ttachments 12.
2/19/81 Letter to NPRDS Participants from Arthur Weyrauch ref:
NPRDS l
Special Report Policy and Report Writer Training i
13.
2/27/81 Letter to NPRDS Participants from Arthur Weyrauch ref:
NPRDS Special Report Policy and Report Writer Training w/ attachments 14 Eliminated 15.
Duplicate Eliminated 16.
Duplicate Eliminated 17.
5/22/81 Note to Multiple Addressees from Benjamin Tashjian ref: ANS-58.20 Subcomittee Meeting held in San Antonio, Texas 5/15/81 F01A-84-44 18.
5/29/81 Letter to Members from Robert A dy ref:
ANS 58.20 Data Reporting Working Group w/ attachment 19.
5/26/81 Note to Multiple Addressees from Benjamin Tashjian ref: ANS-58.20 Subcommittee meeting held in San Antonio, Texas 5/15/81 20.
6/81 Report entitled:
Evaluation of Generation Availability Data System (GADS) vs Nuclear Plant Reliability Data System (NPRDS) 21.
9/24/81 Letter to Multiple Addressees from W. Cooper ref:
Sur. mary of Unusual Occurrence Reports for August 1981 w/ attachment 22.
1 0/ 6/81 Letter to R. Haueter from Robert Addy ref:
Component Failure Reporting to the NPRD System i
23.' 12/23/81 Note to Members from Benjamin Tashjian ref:
Data Usage Working Group meeting w/ enclosure
- 24.
1/81-7/82 Quality Assurance and Data Review of the Nuclear Plant Reliability Data System Task IC w/ attachments 25.
1/19/82 Memo to Members, etc. from Richard Eckert ref:
Proposal for Formation of a Nuclear Plant Construction (Quality) Management t
Evaluation Program w/ enclosure l
26.
1/25/82 Memo to All NPRDS Participants from Cathy Mosley ref:
NPRDS Input Data Error Analysis Report of January 18, 1982 w/ attachment 27.
2/2/82 Letter to R. Haueter from David Finnicum ref:
NPRDS Technical Advisory Committee meeting w/ attachments 28.
2/9/82 Memo to Data Reporting Working Group Members from R. Addy ref:
Meeting Notice 29.
Dupiicate El.iminated 30.
5/18/82 Memo to Data Reporting Group Members from R. Addy ref-NPRDS Failure Modes - Output Report w/attachrents
- 31.
5/4/82 Letter to John Collins from Donald Rueter ref:
Arkansas Nuclear One Units 1 & 2 32.
5/24/82 Letter to F. Hebdon from David Finnicum ref-Minutes of first meeting of NPRDS Engineering Data Working Group w/ enclosure 33.
5/26/82 Lette'r to R. Addy from J. Legg ref:
NPRDS Failure Modes and Definition 34.
4/19/82 Memo to Reportable Scope Working Group Members from Benjamin Tashjian ref:
NPRDS Reportable Systems and Component Scope Manual 35.
4/22/82 Letter to Arthur Weyrauch from David Finnicum ref:
NPRDS Engineerin, Data Working Group Meeting w/ attachments
- Withheld in Entirety
- Withheld in Part
f
~
'-e,
- F0!A-84-44 l'
36.
5/6/82 Report from M. Stewart to R. Dennig ref:
HPRDS Quality Assurance and Data Review 37.
6/3/82 Memo to Carlyle Michelson from S. Milam ref: A6290-l NPRDS Quality Assurance and Data Review w/ attachments
- 38.
6/4/82 Report from Carl Lovell to Robert Dennig ref:
NPRDS Quality Assurance and Data Review for Tasks 1 and 2, Phases lA and 2A 39.
6/29/82 Memo to Members of Engineering Data Working Group from D. Finnicum ref:
Second Working Group Meeting w/ enclosures 40.
7/9/82 Letter to Walter Sullivan from Cathy Mosley ref:
Request from nrc for NPRDS Updated Data Base Tape w/ enclosure 41.
9/17/82 Notegram to Bob Dennig from John Linebarger w/ enclosure 42.
9/3/82 Letter to Ben Cone from Peter Quittmeyer ref:
Employees '
Confidentiality Agreement w/ enclosure
- 43.
9/8/82 Notegram to Bob Dennig from Walt Sullivan ref:
Revised Phase 1B report.
44.
12/16/82 Letter to Ronald Simard from R. Addy ref:
NPRDS Users Group Meeting Information w/ attachment 45.
2/17/82 Letter to J. L. Crooks from J. R. Buchanan re:
INPO S0ER's.
46.
6/6/83 Memo to Clemens Heltemes from S. Milam ref:
A629D NPRDS QUALITY ASSURANCE AND DATA REVIEW - Revision 1 w/ attachment 47.
6/27/83 Letter to NPRDS Users Group from B. Logan ref:
August 9 and 10 Meeting at INPO w/ attachment
- 48.
10/83 Draft report Quality Assurance and Data Review of the Nuclear Plant Reliability Data System, Year Ending 7/31/83 49.' 11/3/83 Letter to B. Logan from Robert Addy ref:
Recomendations ccncerning component failure definition and failure report w/ attachment
- Withheld in Entirety t
APPEND 11 K s
NRC lilTERNAL 1979 1.
0/2/79
'teno from 11. *1orrison to L. Gossick
Subject:
Proposed Rulemaking Review Request w/ enclosure Advanced !!otice of Proposed Rulenaking (7 pages) 2.
3/9/79 fie.o f ror. ll. Thornburg to U. liorrisor. Sutject:
Review Of Advance Notice of Proposed Rulemaking (1 papei 3.
8/14/79 tiote from S. Ilanauer to ". fiorrison
Subject:
ilPRDS Rulenakina (1 page) 4.
8/29/79 Meno from Samuel Bryan to U. !)orrison
Subject:
Proposed Rulemaking Review Request w/ enclosure Coments on Advanced flotice of Proposed Rulemaking on Mandatory Participation in flPRDS (2 pages) 5.
8/29/79 Memo from Al Kenneke to T. Rehn
Subject:
Proposed Rulenaking l
Request (2-pages) 6.
8/30/79 lemo fron Saul Levine to Wilbur 'torrison
Subject:
Coments On The Proposed Rulcuking Procedure For fiPRDS (1 page) s 7.
3/31/79
!ieno from florm Haller to llilbur Morrison
Subject:
HPRDS Proposed Rulenaking Review Request w/ attachment Donestic Licensing Of Production and Utilization Facilities (17 pages) 3.
9/5/79~
& no from T. Rehm to Robert Minogue
Subject:
Pro. posed Rule-making Request (Advance Notice Of Proposed Rulenakin9, Operational Data Gathering,-'tandatory Reporting of HPRDS Data Systera (1 page) 9.
10/7/79 Meno fror. Hillian Russell to ti. Medeiros
Subject:
Proposed Rulenaking: !iandatory Reporting Of HPRDS Information w/ enclosure SD Resolution (7 pages) 10.
11/6/79 tiemo fron it. Medeiros for File
Subject:
Major Points Brounht Out In 10/31/79 tieeting With NSAC Director Ed Zebroski (3 pages',
_t**
g me l
l 1
^
APPEND 1X K IIRC IllTER:iAt 19T9 1.
5/16/80 Meno fro. Carl 'tichelson to Willia Direts Sub,1ect:
Propose::
Coope-ative Anree er.1 l!ith The Institute Of flutlea-rower 09erations (IllPO) Ans Tne flutiear Sa'ety Analysis Center ('45P.
w/ enclosure Prelir-i.a y Dra' (6 panes) 2.
5/29/83
'le.:. f ro- ". 'le ce i re s t o F.. 'S.t c A Su 2c:t:
Annual fiu-lea-Piar.t Rei:abili t y Da ta Sys te- (N::.Z ', fleetinn w/er.clesu es Prelimina y Surr.a ry o< 42 com.ent lette-s, May 30 meno te liinogue from fiedeiros, Repo-; cf Trip to Oconee (7 paces' 3.
6/4/80
!ieno fron C. Heltenes to M. :4edeiros
Subject:
NPRDS - Your
!ieetinn flenort To R. B. tiinogse, Dated iay 29,1980 (2 pages) 4 Duplicate Eliminated t
5.
6/26/81 fiemo fror Carlyle 'tichelson to ". Dircks
Subject:
Proposed Cooperative Ooerational Data Activities !!ith The Institute Of flutlear Power Operations (I!!PD) And The fluclear Safety Ar.alysis Center (: 5AC) w/ enclosure (7 panes) 6.
6/27/80 tiote fron Jack Heltemes to All AEOD Personnel re:
Infornal Organization Charts and Current Personnel Assignments w/ enclosure Charts 3 paces) 7.
7/8/80 Meno fron Carlyle fiichelson to llillian Dircks
Subject:
Propose:
lieetino liith !!!PO And itSAC On Potential Cocoerative Activities u/ enclosure Biographical Data IllPO Board of' Directors (8 panes' 3.
7/8/80
- leno fror K. Clari. to V. Steilo subject:
IfiPO Sriefine of President's I:uclear Safety Oversic".; Corr.ittee w/enciesure Re:: -
Of Conference By The Presider.'s fisciear Safety Oversight Corr.ittee At The Institute Of flutlear Power Operations June 3" At Atlanta (26 paces) 9.
7/9/80 tieno fron Frederick Hebdon to Eric !!e:ss
Subject:
HPRDS Rule-nakinn w/ enclosure 'iardatory !;PRDS Rule Questions (3 paces 10.
7/17/30 ticte fror. Ilillian Dircks to Carl Michelson re:
Review of Clipped Parts (1 pace) 11.
Duplicate Eliminated 12.
7/28/80 11eno fron Carlyle 'ticholson to 11tilian Dircks
Subject:
-INPO Briefing Of Presijent's fluclear Safety Oversight Cornittee (Your Hote Dated 7/17/80)(2pages)
13 8/4/80 Meno fror: Carlyle Michelson to 11. Dircks
Subject:
Proposed Cooperative Agreement llith The Institute Of Iduelear Power Operations And The fluclear Safety Ar.alysis Center e/ enclosure NSA" Rensed Draf t (4 panes) i t..
8/5/80 Meno fro-I!. Hartfield to C. Michelson
Subject:
NPRDS Data Usaae Meeting (
parte) 15.
Durlicate Elirr nate:
16.
S /15.' 3D
'te c f rc,. Carlyei w.ichelsor te Rete-t 'enep;e Sutject:
Input Tc, The Co r.issior. Parer Or IFTOS A".:: :iR:'s RE N rtinc Re;uire-per.ts w/ enclosure AEOD Repertine Rep re,er.ts - Need for fiPRDS Type Infornation (16 pages) 17.
9/23/89 Memo fron Carlyle Michelson to Edward Jordan
Subject:
Proposal For INPD To Support Utilities In Assessing Operational Data w/ enclosure Draft questions (3 pages) 18.
10/7/80 Memo from Carlyle Michelson to H. Dircks
Subject:
Proposed Cooperative Operational Data Activities 1lith The Institute Of fluclear Power Operations And The fluclea-Sa'ety Anslysis Cente w/ enclosures AEOD Coments on Proposed Agreement, Septenber 15, 1980 liiP0/IISAC letter (10 paces) 19.
10/7/80
!)emo from llilliam Dircks to liarold Denton
Subject:
Proposed li4P0/flSAC/IlRC Cooperative Acreement (2 oages) 20.
Duplicate Eliininated 21.
10/8/80
?iene fron Carlyle tiichelson to Robert Minocue
Subject:
Input For llPF.DS Corrission Pacer w/ enclosure Draf t paper (10 pages)
Meno fro-llilliar Dircks to Harold Denton
Subject:
Proposed 22.
10/16/80 IliPD/liSAC/flRC Cooperative Agreenent On Operational Data (2 cac+s' 23-Duplicate Eliminated 24.
10/23/80 Meno from E. Jordan to Carlyle !iichelson
Subject:
flotificatio-Of Significant Events (3 pages) 25.
10/24/80 !iemo from Carlyle Michelson to Robert Minogue
Subject:
Integrate Operational Experience Reporting) System w/ enclosure Draft Commission Paper (11 pages
26.
10/3')/83 Note from Fred Hebdon to File Sub.iect:
Revised Reportino Reauirenents (? pages) 27.
11/10/30 Meno fron Edward Halmar. to Milliar Dircks Subject-
'faiver Of Co rissior. Policy On Avoidance Of Contractor Orgar.izationa' Con'licts Of Intarest w/ enclosure Organizational Conflicts of Interest:
Weive- (18 oages) 2C.
11/2C'E Mem:. fror Carlyle 'tichelson to Edward Hai.an Sut;ect:
14iver Of Corrissior. Pciicy Or Ave.ic6nce O' Cor tra:ter Orcar.izatior.e' Conflicts Of Interest (1 page) 29.
12/16/03 Memt. f ror: Carlyle Michelsor. to Millian Dircis
Subject:
Continuation Of NRC Support Of The flPRD System (1 page) 9 g
l f
l I
l
1/13/81 Merc. f ro-Guy Cu r no$ae to Cariyle Micht isor.
Subject:
Apnli'c a-bility Of 10 CFR Part 21 Reporting Requirements lo INP0/NSA:
(4 pages) 2.
1/34/61 Note f ro-Fred Hebcon to file Sut:ie: :
NPRDS Sumcorrittee twetinc (2 ca;es' 3.
1/22/E1 Merc 'ro-Richa-c Ireland to Sternen Hanauee
Subject:
F ort nc or.i n; Meetin; With Institute Of Iduclear Power Operations w/ enclosure Agenda - INPD/DP.F5 Meeting January 27, 1981 (2 pages) t 4.
1/28/81 Note fror Frederick Hebdon to File
Subject:
NRR/INPO Coordination Meeting (2 pages) 5.
Duolicate Fliminated 6.
1/30/81 Meno fror Frederick Hebdon to Carlyle Michelson
Subject:
Forthcorir; '
Meeting With INPO 7.
2/9/81 Note frot Frederick Hebdon to E. Adensam, J. Knight, J. Roe, E. Jordan, G. Gower, E. Blackwood, R. Woodruff, R. Hartfield, E. Boyle, J. Crooks 8.
2/13/81 Memo from Carlyle Michelson to William Dircks
Subject:
Feedback of Doerating Experienge 9.
2/25/81 Memo from Fred Hebdon to C. Michelson
Subject:
Reportable Scope of NPRDS w/ enclosure Proposed Reportable Systems Lists 10.
Duplicate Eliminated Duplicate Elicinated 11.
12.
Duplicate Eliminated sw 13.
Duplicate Eliminated 14.
Doplicate Eliminated r
.---_+--.,,n,--.--+,,em.,
, - - -,--,, - -, - ~. - -. -,,,,. - -., - - - - - - - - -,
15.
Duplicate Eliminated 16.
3/20/8)
&nc f rom Norman Haller to William Dircks
Subject:
Meeting Witt INPD Representative 17 3/24/E' Me r. f ro-Ca rlyle Michelson to Williar Duc61 S utie c t :
Aviatioc Sa'ety Reoorting Syste- ( A5:5) Ane The hiertial Adootior. Of A Simila r Syster For The Nuclear ii.dustry 15.
Du;licate Eliminated 19.
4/20/81 Memo from Frederick Hebdon to Stuart Rubin
Subject:
Nuclear Plant Reliability Data 'Systerr {NPRDS) Reportable Scope 20.
4/24/81 Mem from R. Bernero to W. Vesely
Subject:
NPRDS Meeting on May 12,1951 e
21.
Duplicate Eliminated 22.
5/6/81 Memo from George Lanik to Fmderick Hebdon
Subject:
Nuclear Plant Reliability Data System (NPRDS) Reoortable Scope w/ enclosure Coments on NPRDS Reportable Scope 23.
5/8/81 Note from C. Heltemes to C. Michelson re:
Background to Monday Meeting with INP0/NSA; w/ enclosure Telecooy to Dircks
Subject:
Memorandum of Agreement Between INP0/NSAC and the U.S. NRC On A Cooperative Rclationship For The Collection and Feedback Of Operational Experience Information and Data for Nuclear Power Plae.
2A.
5/13/81 tie crandum from Carlyle Michelson to William Dircks
Subject:
Apc t:. t '
Of The Memorandum Of Agreement On A Cooserative Relationship For Ttt Collection And Feedback Of Operational Exoerience Information And Data for Nuclear Power Plants w/ enclosure Memorandum of Agree ent 25.
Duplicate Eliminated 26.
Duplicate Eliminated 27.
5/25/82 Memo from Narinder Treham to Fmderick Hebdon
Subject:
NPRDS l
Reportable Systems And Conponent Scope Manual l
28.
Duplicate Eliminated l
l
29.
6/1/81 Memo f rom Robert Dennig to The Files
Subject:
Trip Ret, ort - NPRD5 Workshop May 14-15 San Antonio Texas e/attachnents Slides for 10EP Presentation, lette rega ding DOI SuMort for NPP:'S 3D-Daplicate Eltrinated 31.
6/16/E:
Me-c., f ror. Williar Di rci s to Chai r,ar He'&.e, Gi linsi y, Brad'or d and Ahe arne Sutject :
Me.orancar fo Agie er t Wi th INPD Ar.:: NSA:
f/
A Cooperative Relations *ip For The Colle:tior. And Feedt,ach o' Operational Data w/ enclosure Ptnorandur of Ag terer.t INP0/N5AC-NE:
32.
6/22/81 Meno from Carlyle Michelson to Harc1d Denten
Subject:
Review of the INP0/NSAC See-In Program w/ enclosure Background Information Concern-ing Review of the INP0/NSAC Screening and Preliminary Evaluation Program 33.
Duplicate Eliminated 34.
7/21/81 Additional Agenda items for IN:0/NSAC/NE: Mee ting on Memorandum of Agreenent 35.
7/23/81 Routing Slip to All AEOD Members re:
Charts w/attachnent Analysis &
Special Projects Division Orginizational Chart 36.
7/29/81 Memo from C. Heltenes to Carlyle Michelson
Subject:
Distribution tc PDR of Correspondence and Reports Associated With Memorandum of Agreement With INP0/MSAC 37.
8/17/81 Memo from Don Beckham to Stephen Hanauer
Subject:
Forthcoming Meeting With INPO w/ enclosure Agenda INP0/NRC-DHFS Meeting 8/15/81 38.
8/24/81 Memorandum from Robert Minogue to Learned Barry
Subject:
Trans fer of Project From RES To AE0D 35.
8/24/81 Letter from Haueter to C. Michelson re: further funding for NPRDS in the future 40.
8/25/81 List of Attendees at INPO-NRC Meeting w/ enclosure NRC Research Update 41.
8/27/81 Memo from Robert Dennig to File
Subject:
INPD/NRR Technical Exchange on Human Factor Programs 42.
Duplicate Eliminated 43.
Duplicate Eliminated 44.
10/5/81 Note from Jack Heltemes to Ed Case, Dick Deyoung and Denny Ross re:
AEOD Studies w/ enclosures AE0D Case Studies, Reports Issuad by AEOD, INPO Special Interest Codes
4 5~.
10/13/81 Memo from R;bert Dennig to Files Subject-INPD-NRC/DHTS Meeting, October 7,1981 c/ attachments NRC Research Dodate, Agenda to INPD-NR; Meeting October 7, 1981 46.
10/15/81 Memo f rom Patrick Rows to Fre deric k Het cy Sut.iec t -
INr0 Reevest fc-Access to the NRC Document Control Syste- (D:5) w/at tachments Letter f rom Zebros6i to Dircks dic Oct. 5/ 19E;, Draf t Response 47.
10/21/21 Meno f ro-F re ce ri ck Hebdo-to file 5;t;e: 1 N::05 48.
Du;iitate Elicinatec 49.
10/29/81 Letter from C. Heiteres to Denny Roos
Subject:
Transmittal of INP0/NSAC Reports 50.
10/29/81 Note from C. Heltemes to Ed Case and Ed Jordan
Subject:
Trnasmi ttal of INP0/NSAC Reports 51.
Duplicate Eliminated 52.
12/2/81 Meno from William Dircks to C. Michelson, R. DeYoung, H. Denton, R. Minogue, and V. Stello
Subject:
lieeting to Discuss INPO Related Pktters 53.
Duplicate Eliminated 54.
12/11/81 Memo from Nornan Moseley to Richard DeYoung
Subject:
Acconpaniment of INPO Evaluation at Plant Hatch w/ enclosure Trip Report 55.
12/11/81 Memo from Carlyle Michelson to Richard DeYounc
Subject:
10 CFR 50.72, Notification of Significant Events w/er. closure Letter dated 11/10/81 from E. Zebreski to C. Michelson 56.
12/11/81 Note from C. Helteres to Ed Case, Dick DeYoung and Denny Ross re :
Memorandum of Understanding w/ enclosure Memorandum of Agreerent INP0/NSAC-NRC 57.
12/23/81 Memo from C. Helteres to Frank Rowsone
Subject:
Transfer of FIN l
A6293 From RES To AE03 For FY 1982 - Mccification w/attachrent Memo from C. Heltenes to Rowsome 58.
12/23/81 Memo from C. Helteres to Frank Rowsome
Subject:
Transfer of FIN A6290 From RES to AEOD For FY 1982 - Modification w/ attachment Memo from R. Minogue to L. Barry
Subject:
Transfer of Project From RES To AEOD
APPENDIX K NRC INi[RNAL 1982 1.
Undated TY 1982 Program Assunt tions w/ enclosure F) 198? Prograe Brief l
2.
1/18/82 Note from C. Helteres to Joe Lafleur Sutject:
Arrange ents For Inpo To Re:eive foreigr- 0?erating E xterien:e Gi ven To The NRC 3.
- /2 7/82 Nc; D'
- v:e E'*. Nc. 6 f ror hu*Jio Dalla:ino to All NF; Erricyees
Subject:
Policy and Flar.-in; Guica ce Do:urent w/ enclosure U.S. NR: Policy and Planning Guidance 1952 NUREG 08E5 issue 1 4,
2/ 11/82 Memo from Harold Dentor to William Dirck5
Subject:
Meeting With INPD - Radiation Protection Plans 5.
2/16/82 Memo from James Cumings to William Dircks
Subject:
Review of NRC's Efforts to Develop a Relationship With INPO 6.
2/22/81 Note from C. Heltenes to learned Barry
Subject:
Writeup On Cooperative Activities on Operational Experience w/ enclosures Brief writeu:: on scope and nature of Me 1orandu? of Agreement, Memorandum of Agreement ]NPD/NSAC-NRC 7.
2/23/82 Note from Frederick Hebdon to File
Subject:
Nuclear Plant Reliability Data System (NPRDS) w/ enclosure Thoughts and Observations from Meeting of the Technical Advisory Comittee at INPO 8.
3/1/82 Facsimile from H. Thonpson to J. Heltemes
Subject:
Connents on OlA Draft Report on NRC's Relationship With INPO 9.
3/2/82 Memo from R. DeYoung to C. Michelson
Subject:
Proposed NRC/INPO Memorandum of Agreemen't w/ enclosure 3/19/82 Itr. from E. Wilkinson to W. Dircks
Subject:
Progress on Memorandum of Agreenent and Supplements w/ attachment Memorandun of Agreenent IND0/NSAC-NRC 10.
3/ 3/82 INPD Review of 19E; SERs VS. Proposed LER Rule I
)).
3/ 3/82 Memo from C. Helteres to Edwin Triner
Subject:
Information Requested l
By Energy And Water Developnent Appropriations Subcornittee w/ enclosure i
Response to item 2 of the Comittee Requests l
12.
3/3/02 Memo from Carlyle Michelson to H. Denton, R. DeYoung and R. Monogue
Subject:
NRC Input To The NPRDS Under INPO w/enclosurt Ltr. dated 2/23/82 from C. Michelson to E. Wilkinson
Subject:
Participation on the NPRDS Technical Advisory Comittee 13.
Duplieate Eliminated l
14.
3/10/82 Memo from Darrell Eisenhut to All Licensees of Operating Plants, Applicants for Operating Licenses and Holders of Construction Permits
Subject:
Use of INPO See-In Program (Generic letter No. 82-04) 15.
3/12/82 Memo from R. DeYoung to W. Dircks
Subject:
Proposed Appendix No. S to Memorandum of Agreenent Between INPO And NRC-Utility Evaluations w/ enclosure Appendix Nunber Five r
i 16.
3/23/82 Memo from R. Scott to Valeria Wilson
Subject:
DCS Processing of INPD Re:)pr&$
17 3/24/8c Memo fror Darrell Eisenhut to All Licensees of Operating Plants, Ap:licar.ts for Operating Licenses and Holoees of Construct 1or. Pe nr. ts Subje:t; Use of INFO See-IN Prograr (Generic letter No. 82 04) 1~.
3/ 3D ' E.~-
4 r. frc
~ Heiteres to Wa rren e nne-s Sut.*ec t :
Re vie-cf ECCi A: tua ti or.s On U. S. PW.5 19.
Undatec Menorande of Agreement Betweer, The Institute of Nv: lear Power Operations and The U.S. NR; signed by Dircis and Wilkinson w/enclos.m Appendix Nunber One Exchange of Operational Experience Data 20.
4/6/82 Memo from Harold Denton to Carlyle Michelson
Subject:
AEOD hemorandum on NRC Input To The NPRDS Under INPO 21.
4/2 1/ 82 Memo from Frederick Hebdon to Carlyle Michelson
Subject:
PRAs And NPRDS 22, 041icate kliminated 23.
4/22/82 Memo from Robert Dennig to C. Helteres
Subject:
NPRDS Administratic-Under INPO 24.
5/ 3/82 Note from Frederick Hebdon to Hal Ornstein, Wayne Lanning and Gene Imbro
Subject:
NPRDS Reportable Systems And Conponent Scope Manual w/ enclosure Conrents On NPRDS Scope Manual 25.
5/4/ 82 Memo from Frederick Hebdon to Carlyle Michelson
Subject:
SCSS Syste s And Codes w/ enclosure ' Comments, Observations, and Reconvendations Concerning SCSS System Codes 26.
5/10/82 Note f a: Jack Heltenes to Joe Lafleur re:
INPO Response to Criteria for Safeguarding IRS Material 27.
5/14/82 Memo from Richard DeYoung to B. Grimes, E. Jordan, L. Cobb, R. Forty.a.
J. Lieberman and J. Blaha
Subject:
5/14/82 Memo from William Dircks to List of Add-esses
Subject:
TMI Actior.
Plan Iters Still Pending w/ enclosure Mere dated 5/14/82 from Dircks to Codssioner Ahearne
Subject:
Ac tior. Plan Tracking System 29.
5/17/82 Memo from John Pellet to Frederick Hebdon
Subject:
NPRDS Reportable Systers And Component Scope Manual w/enclosur1r Coments on NPRDS Scope Manual 30.
5/19/82 Memo from Frederick Hebdon to File
Subject:
NPRDS Engineering Data Working Group w/enclosurt! Dictionary of Corponent Codes, Generic Labels, and Descriptions i
31.
5/26/82 Memo from Robert Minogue to Carlyle Michelson Subjut:
NPRDS Program Plan And Technical Addsory Corrittee 3?.
6/7/82 Memo f rom Carlyle Michelson to H. Dentor., R. Deiounc, R. Minogue
Subject:
Program Plan For The Nuclear Plant Reliability Data Syste-32.
6/9/8?
Note frt-Jad Heltenes to Joe Lafleur rt; Revised INP Con fi de r,.
ti a li t.s Ag te e"t w/enclos u es AE r (cm trer is Coe.ce r mg ! AE L Establish e-t of National anc Intematic*.a1 Incide.t Re: ort ng Systems, Cor.ficentiality Agreerent 34 6/15/52 Memo from John Crooks to C. Heltemes
Subject:
Information Rec;uest 35.
6/15/82 Memo from C. Michelson to R. Haynes, J. O'Reilly, J. Keppler, J. Collins and R. Engelken
Subject:
Current Status of the Coopera-tive Relationship With INPO Recarding Operational Data w/ enclosures Memorandum of Agreement, Appendix Number One 3E.
6/18/82 Memo from C. liichelson to H. Denton, R. DeYoung, R. Minogue, R. Hayr,es.
J. O'Reilly, J. Keppler, J. Collins and R. Engelken
Subject:
Nuclea-'
Plant Reliability Data System w/ enclosure First Semi-Anr.ual Staff Evaluation of the Current Status of NPRDS 37.
Duplicate Elirtinated 38.
6/29/82 Memo from Robert Dennig to File
Subject:
June 4,1982 Telecon With INPP RE:
INEL NPRDS Rev 0 39' Duplicate Eliminated 40.
Unda ted Memo f rom Robert Dennig to Frederick Hebdon
Subject:
7/ 7/ 82 Memo from John Collins to Carlyle Michelson
Subject:
Current Status l
Of The Cooperative Relationship With INPO Regarding Operational Data 42.
7/8/B2 Note from Stuart Rubin to Reactor Operations Analysis Branch, AEOD
Subject:
INP0/AEOD Technical Information Exchange Meeting 43.
7/ 13/82 Memo from Robert l'inogue to Carlyle Michelson
Subject:
INPO Prograr l
Plan For the NPRDS w/ enclosure Items to Consider if the Program Plan is Revised and Reprinted 44.
7/16/82 Memo from Harold Denton to Carlyle Michelson
Subject:
Program Plan For Nuclear Plant Reliability Data System (NPRDS) 45.
7/21/82 Memo from Janes O'Reilly to Carlyle Michelson
Subject:
Di stribution Of INPO Reports
46.
7/27/82 Meno from William Dircks to Chairman Palladino, Gilinsky, Ahearne, Rot,erts and Asses 1 tine Subje:t Coordination With Ihr0 47.
8/13/82 Me o frorr Diane Dandois to F. Het, don Sutject:
Transmi t tal of Voucher for Services Rendered by DOE w/entlosure Voucher and Schedule of Withdrawals and Crecits Dd;I1Citt II1"in*IEC 48.
49.
8/ 31/ 82 Mere fror Re:>ert Dennig to file
Subject:
NPRDS Data Re;;orting Working Group Meeting On August 18-19, 1982 w/ enclosure NPRDS Plant Organization Reporting Guidelines 50.
9/1/92 Note from Frederick Habdon to File
Subject:
NPRDS Engineering Data Working Group 51.
9/2 3/82 Note from C. Helter:es to Joe Lafleur re:
INPO Confidentiality Staterrent w/ enclosure Letter frorr. Peter Quittmeyer to Ed Robeson dated 9/21/82 re:
Final Form of Encloyees' Confidentiality Agreere; 52.
9/28/82 Memo from Carlyle Michelson to Raymond Fraley
Subject:
Di s tributio-Of INPO Reports To ACRS 53.
10/1/82 Memo from C. Ptichelson to H. Denton, R. DeYoung, R. Minogue, R. Haynes, James O'Reilly, J. Keppler, J. Collins and R. Engelken
Subject:
HPRDS Documentation w/ enclosure NPRDS Workshop Agenda 54.
10/25/82 Memo from J. Gagliardo to Carlye Michelson
Subject:
NPRDS Documentation Duplicate Eliminated 56.
11/1/82 Heno from Frederick Hebdon to File
Subject:
NPRDS Users's Grou; w/ enclosure NPRDS Users' Group Meeting 57.
11/15/82 Memo from Harold Denton to Carlyle Michelson
Subject:
Nuclear Plant Reliability Data System Docurrentation 58.
12/6/82 Agenda For INP0/NRC Coordianting Meeting December 6,1982 59.
12/9/82 Memo fror Frederick Hebdon te C. Heltemes
Subject:
Meeting With INPO To Discuss NPRDS 60.
2/12/82 Paper, NPRDS QUALITY ASSURANCE AfiD DATA REVIEW, IrlTERIM REPOP.T 1
APPENDlX K NRC INTERNAL.
19El 1.
2/2/83 Memo from Robert Dennig to File Subje:t-January 17-18, 1953 Meeting Of The NPRDS Users Group At I'. Heac: artert in Atlanta w/ enclosures Agenda for January 17-18 lieeting of NPCS Users Group, NPRDS Transition Attitivies 2.
2/25/E3 Mer.o fro:- Roger Mattsen te ha-cid Dee::- 54.'e:t:
Staf f Re:on e 42-tion To Proceed Witn a Co:rdination F'.a fce Re:ielocical Activitie!
With Tne Institute Fo-Nucleae Power 0:e atier.s w/e. closures Meno from H. Denton to W. Dircks, Co:e:ir.ation Plan for NRC/INP0 3.
Duplicate Eliminated 4.
3/ 10/83 Memo from C. Heltemes to H. Denton, R. DeYoung, R. Minogue, and R. Fraley
Subject:
INPO "See-IN" Program Presentation 5.
3/10/83 Memo from P. Shewmon to ACRS Members
Subject:
Visit To INPO 6.
3/15/83 Memo from Richard DeYoung to R. Haynes, J. O'Reilly, J. Keppler, J. Collins and R. Engelken
Subject:
NPC-INPO Coordination Plans w/ enclosures INPO Letter of 3/3/83, 8/24/82 Plan 7.
Duplicate Eliminated 8.
3/31/83 Note from C. Heltenes to E. Case, E. Jordan, D. Ross, R. Haynes, J. O'Reilly, J. Keopler, J. Collins, R. Engelken re:
Documents Under Provisions of Memorandum of Agreenents with INPO w/ attachments Publications !.isting, INPO Publications Analysis & Engineering Division ec9.
4/1/83 Memo from C. Heltemes to E. Case, D. Ross, E. Jordan, R. Haynes, J. O'Reilly, J. Keppler, J. Collins and R. Engelken
Subject:
INPD SOERs/SERs 10.
4/1/83 Meme from C. Heltenes to E. Case, D. Ross, E. Jordan, R. Haynes, J. O'Reilly, J. Keppler, J. Collins and R. Engelken
Subject:
INPC SOERs/SERs w/ enclosure Keywords Index to 50ERs & SERs (through 2-26-E3) 11.
4/4/83 Memo from A. Davis to C. Norelius and R. Spessard
Subject:
INPO Report On Diesel Generator Failures 12.
4/13/83 Routing slip from Jack Heltenes to Bill Besaw re:
Contract Within NRC for INPO Documents 13.
4/13/83 Routing slip from J. Heltemes to T. Rehm re:
Draft letter w/ enclosure Draft from C. Heltemes to W. Besaw
Subject:
Receipt And Maintenance Of INOP Documents W ithheld in Part
1983 0
14, 4/21/83 NMe from Gina to CJ" re:
Audi t Reecrts that INPD Provides 15.
Oclicate Eliminttec 16.
Duilicate Elirrinatec 17.
4/22/E3 Me o f-t-C. Heite et t:. Patricia Ne-ry Sut;e:t; Re:e :,
a n r.
!!aintenance of IN:~ Dc:; e.ts w/en:ics um Me cranca, c' Agreenent, s
Apoencix Number One Excnange of Opera.ional Experience Oata 18.
4/27/83 Memo from Daniel Muller to C. Heltemes
Subject:
Receipt and Maintenance of INPO Documents 19.
Undated Handwritten note.from Jeannie to Fred Hebdon re:
Letter from INPO
.M 20.
5/3/83 Note from Robert Dennig to Files
Subject:
Potential Conflict of Interest at EG&G, Idaho re:
NPRDS 21.
5/5/83 Memo from C. Heltemes to H. Denton, R. DeYoung, R. Minogue.,
J. Davis, J. Allan, J. O' Reilly, J. Kecpler, J. Collins and R. Engelken
Subject:
Nuclear Plant Reliability Data System (NPRDS) Proposed Reportable Scope 22.
5/10/83 Memo from Patricia Norry to C. Heltemes
Subject:
Receipt and Maintenance of INPO Documents 23.
5/16/83 Memo from John Davis to C. Heltenes
Subject:
Nuclear Plant Reliability Data System Proposed Reportable Scope 24.
5/ 17/83 Letter from Jesse Ebersole to William Dircks subject:
ACRS Sub-committee Report on Control Room Habitability w/ enclosure Resoonse to NRC Staff Co rents on Centrol Room Habitability 25.
5/19/83 Meno from John Collins to C. Heltemes
Subject:
Nuclear Plant Reliability Data System (NPRDS) Proposed Reportable Scope 26.
5/20/83 tiemo from Jame's Allan to C. Heltemes
Subject:
Nuclear Plant Reliability Data System (NPRDS) Propcsed Reportable Scope 27, 5/24/83 Memo from W. Dircks to Office Directors and Regional Administrators
Subject:
Coordination With INPO w/ enclosure Letter dated 10/18/83 from E. Wilkinson to W. Dircks 28.
Duplicate Eliminated 29.
5/25/83 Memo from Richard DeYoung to Patricia Norry
Subject:
Receipt and Maintenance of INPO Documents w/ enclosure Letter from E. Wilkinson to W. Dircks and Letter from Patricia Norry to C. Heltemes
'30.
5/26/83 Memo from Janes Keppler to C. HelterTs
Subject:
Nuclear Plant Reliability Data Systee (NPRDS; Re::ortable Scope 31 5/27/83 Mene from Ja es O'Reilly to C. Heltenes
Subject:
huclear Plant Reliability Data Syster (NPRDS) Proposed Recortable Scose 32.
Duplicate Elieinated 33.
S/31/53 Mero fror C. Helteres to Jack Ro
Subject:
AIDD cint of Conta::
Wi tn INT-s 34 Duplicate Eliminated 35.
Duplicate Eliminated 36.
6/2/83 Memo from C. Heltemes to Raymond Fraley
Subject:
Nuclear Plant Reliability Data System (NPRDS) Proposed Reportable Scope e
37.
6/2/83 Memo from Edward Jordan to C Neltemes
Subject:
Nuclear Plant Reliatility Data System (NPRDST7roposed Reportable Scope 38.
Duplicate Eliminated 39.
6/2/83 Memo from James Shea to Jack Roe
Subject:
IP Contact For INPO Matters 40.
6/3/83 Memo from Harold Denton to C. Heltemes
Subject:
Nuclear Plant Reliability Data System (NPRDS) Proposed Reportable Scope 41.
6/6/83 Memo from Robert Minogue to C. Heltemes
Subject:
Nuclear Plant Reliability Data System (NPRDS) Proposed Reportable Scope 42.
6/7/83 Memo from William Dircks to Jesse Ebersole
Subject:
ACRS Subcom.ittee Report on Control Room Habitability 43.
6/14/83 Memo from Jack, Roe to EDO Office Directors and Regional Administrators
Subject:
Briefing on IND0/NRC Interactions w/attachrents INPO Contacts Memo from Jack Roe to EDO Office Directors re:
INPO Publications 44 Duelicate Eliminated 45.
6/16/83 Memo from Roger Mattson to K. Goller, J. Taylor, T. Martin, John Okshinski, C. Norelius, R. Bangart and R. Scran'o
Subject:
Developnient of a Program to Evaluate Industry Efforts to Achieve Successful Alara Integrated Radiation Protection Programs w/ enclosures Summary Criteria, Individual Criteria
1983 46.
6/20/83 Memo from R. Stephen to Janes Lundy Sub.i?:t:
INPO R; quest To Renew DC3 Agreement w/att6:n ent Note f rom Fred Hebdon to Steke Scott dated 6/17/83 47.
6/28/S3 Memo from Joseph Lafleur to William Besaw
Subject:
Comrents On Draf t Letter To INPO 48.
Du;1icate Eliminated 49, 6/29/83
'iemo from Richard Major to Frederick Hebdon
Subject:
Coments On The Nuclear Plant Reliability Data System Reportable System And Cosonent Scope Manual w/ attachment Letter from D. Hoeller to R. Major re :
Coiments on NPRDS Scope Manual dated June 24, 1983 50.
Duplicate Eliminated 51.
6/30/83 Memo from Frank Congel to Daniel Muller
Subject:
Review Of NRC/ INFO Radiation Protection /ALARA Guidance w/ enclosure General Radiation Protection /ALARA Program Guidance Chart 52.
7/22/83 Press Release No.83-113 For Release 7/22/83
Subject:
NRC Advisory Comittee on Reactor Safeguards to Meet in Washington, D.C.,
August 4-6 53.
7/27/83 Memo from Jack Roe to Attached List
Subject:
Coordination Meeting With The Institute of Nuclear Power Operations (IllPO) w/ enclosure Proposed Discussion Topics 54 Duplicate Eliminated 55.
8/4/83 Transcript from pages 125-208 re:
Advisory Committee on Reactor Safeguards 280th General Meeting 56.
8/5/83
' Note from C. Heltemes to E. Case, E. Jordan, D. Ross, T. Murley, J. O'Reilly, J. Keppler, J. Collins and J. Martin re:
INPO Documents 57.
Duplicate Eliminated
- 58.
8/15/83 Memo from Frederick Hebdon to C. Heltemes
Subject:
NPRDS Users Group Meeting w/ enclosures Observations and Corments, NPRDS Users Group Meeting List dated August 9-10, 1983 c* Withheld in Paht
59.
8/22/83 Note f rom C. Heltemes to E. Case, E. Jordan, D. Ross, T. Murley.
J. O'Reilly, J. Kepoler, J. Collins and J. Martin re:
INPO Docu ert*.
w/ attach ent I?PD Docu ents
$60.
9/28/83 Memo from C. Helteces to Jack Roe
Subject:
Public Access To NPRDS Information w/ enclosure Background notes on Public Access to NPRDS Information 61.
10/83 INOP CEO Meeting (EDO Re.arss at IfP3 CEO Meetino 10/83) 62.
10/3/83 Note fror Jack Heltenes to Jack Roe re:
NPRDS Confidentiality w/ enclosure Letter dated 4/2/82 from R. Haueter to C. Michelson 63.
10/14/83 Memo from R. Minogue to H. Denton
Subject:
Interim Research Infor-mation Letter 136 For The Accident Sequence Precursor Program w/enclos ures 1969-1979 Precursor Sequences, Attachnent to Interim Research Information Letter 136 For The Precursor Program 64.
10/17/83 Memo from James Partlow to Addressee List
Subject:
Sandia National Laboratories Report On Identifying Equipment Igortant To Safety In Nuclear Power Plants w/ enclosures NUREG/CR-2631 "A Logical Fracewerk,
for Identifying Equipnent Igortant to Safety in Nuclear Power Plants".
SNL FY 1983 Staterent of Work 65.
10/18/83 Note from Hugh Thogson to Harold Denton
Subject:
Summa y of MRC/INPO Coordination Meeting w/ enclosure Memo dated 9/19/83 from Dan Jones
Subject:
NRC/INPO Coordination Meeting, September 13, 1983 (Atlanta) 66.
Duplicate Eliminated 67.
11/7/83 Memo from James Keppler to C. Heltemes
Subject:
Public Access To NPRDS Data 68.
11/28/83 Memo from C. Helteres to H. Denton
Subject:
Public Access To NPRDS Data w/ enclosures Letter dated 9/29/83 from Michael Totten to Nunzio Palladino, NRC Needs With Regard To NPRDS 69.
Duplicate Eliminated 70.
12/2/83 Memo from C. Helteres to H. Denton, R. DeYoung, R. Minogue, R. Minogue
Subject:
Recuest for Conrents On List of Xey Cogonent Applications For The NPRD System w/ enclosure Initial Co@onent List 71.
12/7/83 Memo from R. DeYoung to C. Heltemes
Subject:
Public Access To Nuclear Plant Reliability Data System (NPRDS) Data
- WithhelJ in Entirety or
e 72.
12/7/83 Memo from John Collins to C. Heltenes
Subject:
Region IV Conrents Regarding Memo From C. Heltemes to Regional Administrators Dated November 28,19E3
Public Access To f6ED5" 73.
Duplicate Eliminated 74 Duplicate Eliminatec 75.
12/7/83 Memo from Thoras Murley to C. Heltemes
Subject:
Request For Comments On Public Access to NPRDS Data 76.
12/9/83 Memo from Janes O'Reilly to C. Heltemes
Subject:
Public Access To NPRDS Data w/ enclosure Connents on NRC NPRDS Needs 77.
12/14/83 Memo from Harold Denton to C. Heltemes
Subject:
Public Access To NPRDS Data f
78.
12/15/83 Memo frtm H. Alderman to C. Michelson
Subject:
NRC-INPO Coordination Meeting, December 13, 1983, Atlanta, Georgia w/attachnents Agenda, Performance based evaluations, INPO activities related to maintenance procedures, See-In Program Product 79.
12/19/83 Memo from Robert.Dennig to File
Subject:
NPRDS Users Group (NUG) feeting Decenber 13-14, 1983 80.
12/20/83 Memo from James Kappler to C. Heltemes
Subject:
Request For conenents On List of Key Conponent Applications for the flPRD System w/ enclosures Additional PWR Key Congonents for NPRDS, Additional BWR Key Conponents For NPRDS 81.
Duplicate Eliminated
'm, c82.
12/22/83 Note from Bill. Travers to Bill Dircks and Jack Roe
Subject:
In fo r-mation For Meeting With Zack Pate (INPO)
' 83.
12/29/83 Memo from J. Gagliardo to C. Heltemes
Subject:
Request For Corrents On List of Key Congonent Applications For The NPRD System
~
84
' Duplicate Eliminated 85.
12/30/83 Memo from Thomas Ippolito to William Russell
Subject:
NPRDS Data On Failures Due To Maintenance / Testing 86.
4/14/83 Note from J. Heltemes to F. Hebron re: NPRDS BRIEFING 87.
4/19/S3 NotefromC.d.HeltemestoE. Case co 88.
5/03/83 11emo from C.E. Norelius to J.G. Keppler; ItiP0 EVALUATI0flS
- Withheld in Entirety c* Withheld in Part
[
f APDEr.31I r.
- dt IreltR'4ti 1964 l
- 1.
1/3/E4 R
ting and Trans tite'. Slip to it.E.ci t tc.. Se.d r i t, h e; cor., a r.::
l Bl a t, b w/ attache: functional char t of INf *,
2 1/4 /El Me :. 10 C. J, Ht i t e el f ro: R;;.t ri M' nD; t s u!Je:I C 0""I 5 O!.
15: Or t.t ' ;0'*: ' '.I'.i M M l W '. 0* : F U
'-! t.M : l ' i'!'*
~.
1/ 6.'E '
Me ; tc Jo*.a. Ela. f rc-F recer.c h he:::
1;: e:t:
RI.l!
5:
Siti:5 ICAL ME; C i F0: NPRDS 4
1/6/6 Me : to Clerens Helte et fron Ja.et O'Resily sub]e:t:
RE D'.'E ST FOR COPENTS Oh Lisi 0F KEY COMPONENT APPultt.710N5 FOR THE NPRD SYSTEM w/ enclosures S.
1/9/84 Mr: to Guy Cunninghar fror C. J. Helte es subject:
PUBL]C ACCESS TO NPRDS DATA w/ enclosures 6.
1/22/64 Nctification of Contract Execution with Southwest Research Institute, Continue: Develop 4r.t anc Operation cf the Nsclear Plant Reliability Data Syste- (NPRDS) w/ contract 7.
1/16/S4 Me c to Cle ens Helter.es froe Richard De oung subje:t:
COMMENTS v
ON L]STS OF KEY COMPONENT APPLICATIONS FOR THE NPRD SYSTEtt w/ enclosures 8.
1/16/84 Memo to Minogue, Barry, Denton, DeYoung Davis, and Regional Administrators from. C. J. Nel temes subject:
NUCLEAR PLANT RELIABILITY DATA (NPRDS) SYSTEM SDt!ANNJAL EVALUATION REPORT
- Withheld in Part l
E:t IEfERNAL UNDATE D Undated NPR05 Quality Assurance and Data Revie., Idaho Falls, Idahe Uncated FY 1962 Progran Brief, Of fice of Nutlear Regulatory Researc h, Division of R1st Analysis Uncatec Draf t Letter to E.P. Wilkinson fror C. Michelson-, Access to Foreign Information Uncated Draf t Memorandum to C. J. Heltemes fror J. P. O'Reilly; NPRDS Proposed Reportable Scope t
G e
l i
F R3: F01A-84-44 APPENDIX I APPENDIX - 1981 1.
1/15/81 Memo for Members - AflS 58-20 Subcomittee from R. L. Haueter re: Actions on NRC Proposed Integrated Operational Experience Reporting System w/ attached letters dated 12/16/80 2.
2/13/81 Letter to W. J. Dircks from E. P. Wilkinson re: Safety in the Operations of Domestic Nuclear Power Plants 3.
5/20/81 Letter to C. Michelson from R. L. Haueter re: IflP0 Review of Integrated Operational Experience Reporting System Draft 4.
6/2/81 Letter to W. J. Dircks from M. B. Hobby re: IllP0/flSAC-flRC Memorandum of Agreement w/ enclosed Agreement 5.
7/9/81 Letter to W. J. Dircks from E. P. Wilkinson re: Supporting Operational Excellance 6.
7/29/81 Letter to C. Michelson from R. L. Haueter re: fleeting with HRC on Memorandum of Agreement 7.
8/6/81 Letter to H. R. Denton from E. P. Wilkinson re: SEE-Ifl Program Description w/ attached Significant Event Evaluation and Information lietwork dated 11/80 8.
8/20/81 flote to Carl from Bob re: Formal Transmittal of the SEE-Ifl Program Description w/ attachments 9.
8/24/81 Letter to C. Michelson from R. L. Haueter re: The fluclear Plant Reliability Data System
- 10. 8/28/81 Memo for ANS-58-20 Subcommittee from R. L. Haueter re: Attached Comission Paper on Deferring Action on 10ER 11.
9/18/81 Agenda for If4P0/flSAC/flRC Meeting w/ attachments 12.
9/23/81 Memo for ANS-58.20 Subcomittee Members from R. L. Haueter re: Tour of INP0 Computer and Records Management Facilities w/ attachments
- 13. 9/29/81 Memo for ANS-58-20 Subcommittee Members from R. L. Haueter re:
Subcomittee Meeting October 8 and 9,1981 w/ attachments 14.
10/1/81 Letter to E. L. Boyle from B. L. Cohn re: flumbering Scheme for Foreign fluclear Reactors w/ attachment 15.
10/5/81 Letter to W. J. Dircks from E. L. Zebroski re: flRC Document Control System w/ attachments i
A
Re: F0!A-84-44 APPENDIX - 1981 16.
11/6/81 Letter to C. Michelson frcm E. L. Zebroski re: INP0/NSAC
[
Significant Operating Experience Report (letter only) 17.
12/14/81 Letter to W. J. Dircks from E. P. Wilkinson re: Alternate f
Approach to NRC Rulemaking on Radiological Protection Plans 18.
12/21/81 Letter to C. Michelson from S. L. Roson re: Comments on Events Included in the Draft July-August 1981 Issue of Power Reactor Events w/ attachment 19.
3/20/81 Memorandum to C. Michelson from Zack Pate; Minutes of 3/17/81 Meeting at INP0 20.
5/1/81 Letter to W. J. Dircks from E. P. Wilkinson re:
Potential impact of rulemaking described in SECY 81-84 21.
5/20/81 Letter to W. J. Dircks from E. P. Wilkinson discussing the impacts of the educational requirements contemplated in SECY 81-84 22.
5/20/81 Letter to W. J. Dircks from E. P. Wilkinson; Personnel Development Program for the Nuclear Industry i
23.
6/3/81 Letter to S. Scott from S. L. Rosen; RAPICOM EQUIP-NUCLEAR INDUSTRY 24.
7/1/81 Memo to Messrs. Dircks Stello, Denton from E. P. Wilkinson INP0/NSAC Interface 25.
5/11/81 Letter to C. Michelson from R. L. Haueter acknowledging Eugenia Boyle as ANS-58.20 Subconmittee Member L
m
~
. Ft s
LIST OF NRC DOCUMENTS TO OTHER F0lb8444 ORGAN!ZATIONS REGARDING INP0 i
1.
11/23/79 Letter to Carol Poole fron C. J. Helteres re:
DISTR:EL'i!O': F O:
MONTHLY NSAC "lNDUSTRY REPOPi" 2.
3/?4/El Lette to E. W. Lope. fro-Fred Het;:tr rE:
REDO:' AE.E Sv5iEMS, INTEGRATED OPERaiiOW ExrERIENCE REPDF.il'iG SiSTEM wJenclosures 3.
6/61 NJCLEAR OPERATINS EXPERIENCE EVALUAil0h PROGE*M - Attach ent 6 4.
6/1 6/51 Letter to Bruce Babbitt from Carlyle Michelson re:
AGREEMENT WITH THE INSTITUTE OF NUCLEAR POWER OPERATIONS (INPO) w/ enclosure 5.
6/1 7/81 Letter to Rawley Johnson from Frederick'Hebdon re:
ENERGY INDUSTRY IDENTIFICATION SYSTEM w/o enclosure 6.
7/6/S1 Letter to Benjarin Tashjian from Frederick Hebdon re:
COMMENTS ON NPRDS SCOPING MANUAL w/ enclosure 7.
9/1 8/81 Letter to David Rossin from Carlyle Michelson rel RED}RECTION OF INTEGRATED OPERATIONAL EXPERIENCE REPORTING (10ER) SYSTEM w/ enclosure 8.
1 0/9/81 IPRDS IN PLANT RELIABIL}TY DATA SYSTEli BY:
DAVID PIKE
" 9.
12/18/81 Letter to C. E. Williams from Carlyle Michelson re:
STANDARD ORDER FOR DOE WORK (50EW) w/ enclosure
- 10. 3/1/82 Letter to C. E. Williars from Carlyle Michelson re:
STANDARD ORDER FOR WORK (DOE SOEW) w/ enclosure
- 11. 5/27/82 Letter to R. J. Addy from M. J. Logan re:
NPRDS FA] LURE MODES
- 12. Undated UPDATE OF JUNE 1982 PR03RESS REPORT 13.6[4/E2 Letter to Bruce Logar, fror. Frederick Hebdon re:
REVIEa' 0F DESCRIPTIONS AfC GENERIC DRAWINGS FOR (PWR)w/ enclosure
- 14. 6/25/82 Letter to David Finnicu-from Frederick Hebdon re:
PRO:0 SED EN31NEERING DATA SECTIONS FOR GENERIC CLASSES GENERA AZ PUMPXX w/ enclosure
- 15. 7/22/82
' Note to Bob from John Linebarger re:
COPY OF MONTHLY REPORT FOR A6290, NPRDS DATA ANALYSIS TASK w/ enclosure
- 16. 8/2/82 Letter to Robert Addy from Robert Dennig re:
SUGGESTED STRUCTURE FOR FAILURE MODE REPORTING w/ enclosure
- 17. 8/5/82 Letter to Richard Udell from J. M. Felton re:
F01A-82-261 ACCESS TO NINE1EEN CATEGORIES OF DOCUMENTS w/ enclosures
- 18. 1/10/83 Note to INP0 Data Users' Group from Bruce Logan re:
SCOPING WORKING GROUP REVIEW
- Withhc1d in Part
APPEN0lX L LISTING OF NRC DOCUMENTS TO OTHER ORGANIZATIONS REGARDING INPO 2
19.
1/;i/E2 Letter to J. Sele: L1 f ro-5. Sa'f ell re-NL L E AE PL M.
RELIAE:LITi DaiA SYSTEv (HrEDS) DAT A ANA* YS;5 ( A629;; - Saf f li-53./o enclosure 20.
1/18/E3 Letter to C. Williams from Carlyle Michelsea re:
STAN;AED ORDEP FDP DOE WDEL (50EW) w/ enclosure 21,
1/2S/83 AGENDA ITEMS FOR A6290 TECHNICAL DISCUSSIONS ON FRIDAY,1/28/83 l
w/ enclosures 22.
2/17/83 Letter to David Rossin from C. Heltemes re:
NSAC-54 "USING PRA TO ASSESS NUCLEAR POWER PLANT OPERATING EVENTS e
23, 4/13/83 Letter to Francois Motte from Joseph Lafleur re:
OPERATING AND INCIDENT INFORMATION SENT TO INPO 24 8/3/83 Letter to John Clewett from J. M. Felton re:
F01A-83-336 25.
10/18/83 Letter to Troy Wade fro-C. Heltemes re: STANDARD WORK ORDER FOR DOE (50EW)w/ enclosure 26.
10/18/83 Letter to Lelan Sillin from Thomas Roberts re:
TWO SECTIONS OF SECY-83-248 ]NPO EVALUATION PROGRAM AND GENERAL OPERATING CRITERI A 27.
10/10/80 Letter to C. Michelson from E. L. Zebroski.
28.
2/25/81 Letter to E. Zebroski from C. Michelson re:
Memo of Agreement 29.
5/11/81 Letter.to A. C. Millunzi from R. L. Haueter.
O e
i APPENDIX J 84-44 LISTING 0F NRC CORRESPONDENCE SENT TO INP0 1.
5/30/80 Letter from Carl Michelson to Randall Pack
Subject:
Discussions on Operational Data Analysis w/ enclosures AEOD Work Plan and Proposed Cooperative Agreement (18 pages) 2.
8/12/B0 Letter from Thomas Murley to Eugene Wilkinson re:
LOFT Division of EG&G (1 page) 3.
10/10/80 Letter from Carlyle Michelson to Stephen Rosen
Subject:
Paper On Operational Data Assessment To Be Presented In Stockholm, Sweden On October 20, 1980 w/ enclosure NRC Trends In The Evaluation And Implementation Of Safety-Related Operating Experience (24 pages)
D l
I e
l l
I i
84-44 APPENDIX J i
NRC TO INPD 1981 1.
1/22/81 Letter from Frederick Hebdon to Robert Haueter
Subject:
Integrated Operational Experience Reporting System w/ enclosure Collection of operating experience (10 pages) 2.
1/28/81 Letter from William Dircks to R. L. Haueter re:
Integrated Operational Experience Reporting System w/ enclosure E. P.
Wilkinson letter (3 pages) 3.
5/5/81 Letter from Carlyle Michelson to Robert L. Haueter re:
NPRDS Activities within the NRC (1 page) 4.
9/18/81 Letter from Carlyle Michelson to Eugene Wil kinson re:
Inte-grated Operational Experience Reporting System w/ enclosure Draf t to be reviewed (9 pages) 5.
10/29/81 Letter from William Dircks to E. L. Zebroski re: 'NRC Document Control System w/ enclosure INPO Access To NRC DCS Estimated Cost Reimbursement To NRC (2 pages) 6.
2/25/81 Letter from C. Michelson to E. P. Wilkinson re:
Hemorandum of Agreement (MOA) 7.
5/26/81 Letter from W. J. Dircks to E. P. Wilkinson re:
Changes to Memo of Agreement l
I l
l t
Se.ee APPENDIX J NRC TO INPO 1982 1.
1/11/82 Letter from Harold Denton to E. P. Wilkinson re:
Significant Event Evaluation and Information Network (1 page) 2.
2/22/82 Letter from C. J. Heltemes to Dr. Ed Zebroski re:
Need for Vic's office and the CRGR (1 page) 3.
2/23/82 Letter from Carlyle Michelson to E. P. Wilkinson
Subject:
Participation on the NPRDS Technical Advisory Comittee (lNPO letters dated December 30, 1981 and January 7,1982)
(1 page) 4.
3/17/82 Letter from Fred Hebdon to Art Weyrauch and John Parris
Subject:
Generic Systen Descriptions And Drawings w/ enclosure Sample of system description used in IE training courses 51 pages) 5.
4/29/82 Letter from Jack Heltemes to Ben Cohn re:
LER rul6 (1 page) l 6.
4/30/82 Letter from Carlyle Michelson to R. L. Haueter re:
Limitations l
on the use of NPRDS w/ enclosure Nuclear Plant Reliability l
System Quality Assurance and Data Review (8 pages)
I 7.
5/10/82 Letter from C. Heltemes to Robert Haveter re:
Draft Report j
on NPRDS (1 page) i 8.
5/19/82 Letter from Carlyle Michelson to Robert Smith re:
INPO's i
request for access to operating experience (1 page) 9.
5/26/82 Letter from Carlyle Michelson to Dr. Ed Zebroski re:
Nuclear j
Plant Reliability Data System (1 page) 10.
6/18/82 Letter from Robert L. Dennig to Art Weyrauch re:
Request for, a tape of the complete NPRDS (1 page) ~
11.
7 / 12 / 8 2 Letter from William Dircks to E. P. Wilkinson re:
Activities of INPO w/ enclosure 1tr. from Wilkinson to J. Collins (4 pages) 12.
8/24/82 Letter from William Dircks to E. Wilkinson re:
Coordination j
Plan for NRC/INPO Appraisal and Evaluation Activities" w/ enclosure Appendix No. 2 Coordination Plan for NRC/INPO Appraisal and Evaluation Activities (5 pages) 3 13.
9 /17/82 Letter from Carlyle Michelson to R. Haueter re:
NPRDS j
Audit Report (1 page)
~
14.
9/20/82 Letter from William Dircks to E. Wilkinson re:
Radiological l
Protection Activities Coordination Plan (1 page)
{
)
15.
9/28/82 Letter from Carlyle Michelson to E. Wilkinson re:
Distribution j
Of INPO Reports To ACRS (1 page) i
{
- ~ aw
. _ _, _ _ _.. _ _ - _, ~. _. _
APPENDIX J NRC TO INPO 1982 2
16.
10/1/82 Letter from C. Heltenes to Robert Haueter re:
NPRDS Program Plan (1 page) 17.
10/15/82 Letter from Eva Szent-Ivany to Stephen Rosen re:
INP0/NRC Agreenent on Operational Data (1 page) 18.
10/28/82 Letter fron Carlyle Michelson to E. Wilkinson re:
CEC Abnomal Occurrence Reporting System (1 page) 19.
11/9/82 Letter from Karl Seyfrit to Ben Cohn
Subject:
Tec5nical Discussions AEOD/INPD (2 pages) 20.
12/3/82 Letter from Eva Szent-Ivany to Stephen Rosen re:
INP0/NRC Agreement on Operational Data (1 page) 21.
8/4/82 Letter from R. L. Dennig from A. Weyrauch re:
fequest for a NPRDS tape through the 2nd quarter 22.
4/20/82 Letter from W. J. Dircks to E. P. Wilkinson re:
The Memorandum of Agreement 23.
8/82 Letter from W. J. Dircks to E. P. Wilkinson, enclosing signed copy of Appendix Two to the MOA 24.
7/23/82 Letter from Gina F. Thompson to R. Haueter documenting missing INP0 SER's 25.
12/15/82 Letter from C. Michelson to E. P. Wilkinson re:
Continued cooperation on infonnation exchange 26.
3/9/82 Letter from C. Michelson to R.S. Smith re: NEA abnonnal op'erating experience data (IRS reports) 27.
6/18/82 Letter from C. Nichelson to E.P. Wilkinson; Transmittal of Proposed Draft Regulatory Guide on Periodic Testing of Motor-Operated Valves 28.
6/30/82 Letter from J.G. Lafleur, Jr..te'.S.L. Rosen re copies of foreign experience reports received from OECD/HEA
~ - -, -
,v-
-,--...e-
- + - -u s
--n----
E2.Re APPE %]x 3 NRC TO INPO 1983 1.
1/5/83 Letter from Carlyle flichelson to Eugene Wilkinson
Subject:
Transnittal Of AEOD Engineering Evaluation And Case Study Reports To INPO (1 page) 2.
1/10/83 Letter from Carlyle flichelson to E. Wilkinson re:
HPRDS Report (1 page) 3.
2/10/03 Letter from Robert Dennis to Ron Simard re:
FG&G's Sumary of HPRDS (1 page) 4.
2/16/83 Letter from William Dircks to Eugene Ililkinson re:
Inpo Documents (1 page) 5.
3/3/83 Letter from William Dircks to E. Wilkinson re:
Radiological Protection Activities Coordination Plan w/ enclosure Coordina-tion Plan For NRC/INPO Radiological Protection Activities (3 pgs),
6.
3/31/83 Letter from C. Heltemes to E. Zebroski re:
INPO Reports Concerning Operational Experience w/ enclosure Missing Significant Event Reports (3 pages) 7.
4/5/83 Letter from William Dircks to E. Wilkinson re:
Coordination Plan for NRC/INPO Training Related Activities w/ enclosure Coordination Plan (12 pages) 8.
4/8/83 Letter from C. Heltemes to Eugene Wilkinson
Subject:
Access TO Foreign Infomation w/ enclosure Note to Michelson from J. Lafleur re: Draft Ltr. Michelson to Wilkinson (3 pages) 9-Dunlicate Fliminated 10.
5/24/83 Letter from William Dircks to E. Wilkinson re:
IHP0's effort (1 page) 11.
7/19/83 Letter from Frederick Hebdon to Ron Simard re:
HPRDS Audit Program (1page) 12.
7/19/83 Letter from C. Heltemes to Bruce Logan re:
Hebdon replacing Heltemes (1 page) 13.
7/26/83 Letter from C. Heltemes to Eugene Wilkinson
Subject:
Access To Foreign Infomation (2 pages) 14.
9/12/83 Letter from C. Heltemes to Steven Rosen re:
Power Reactor Events w/ enclosure ltr. from Heltemes to W. Layman (4 pages)
I l
15.
9/21/83 Letter from Robert Dennig to Ron Simard re:
EG&G Report On NPRDS (1 page) 16.
10/20/83 Letter from William Dircks to E. Wilkinson re:
Evaluations by INPO (1 page)
-- ~,
APPENDIX J NRC TO INP01983 84-44 17.
11/7/83 Letter f rom Eugenia Boyle to Daniel Reilly re:
LER Microfiche (1 page) 18.
11/23/83 Letter from !!illiam Dircks to E. Uilkinson re:
Coordination Plan for NRC/INPO Training-Related Activities w/ enclosure Coordination Plan (9 pages) 19.
12/19/83 Letter fron C. Heltenes to Eugene Wilkinson
Subject:
Public Access To NPRDS Data w/ enclosure NRC Needs liith Regard To NPRDS (9 pages) 20.
11/23/83 Letter fron William Dircks to E. Ili1kinson re:
Coordination Plan for NRC/lHP0 Training-Related Activities w/ enclosure Coordination Plan (8 pages) 21.
12/19/83 Letter from C. Heltemes to Eugene Wilkinson
Subject:
Public Access to NPRDS Data w/ enclosure NRC Heeds With Regard To NPRDS (5 pages) 22.
4/22/83 Letter from E. L. Boyle to R. Simard re:
Authorization to INPO to provide NPRDS data to NRC contractors 1
88-66
- v NRC TO ]NPO 1984 1.
1/25/04 Letter from C. Heltenes to Ron Simard re:
Instrunentation Reporting Problem (1 page) 2.
Duplicate Eliminated 3.
Undated Letter from C. iiichelson to E. Wilkinson re:
Proposed LER Rule (2 pages) t e
--w n----
-,,vm,-m.
r, r
-.---.,,w----
,--,w,----,
~
- - - - - - - - - - - - ~ - -
e J - agr
~
Re:
F0IA-84-44 APPEllDIX I APPENDIX - 1982 1.
1/5/82 Letter to C. Michelson from S. L. Rosen.re:
the IAEA Advisory Group 2.
1/7/82 Letter to C. Michelson from R. Simard re: NPRDG Technical Advisory Committee 3.
1/12/82 Memo to NPRDS Technical Advisory Committee from R. L. Haueter re: Technical Advisory Committee Meeting dated 2/4-5/82 w/ attached Agenda 4.
1/25/82 Letter to W. J. Dircks from E. P. Wilkinson re: Draft Modified Memorandum of Agreement w/ attachment 5.
3/19/82 INP0 Status and Evaluation Program by E. P. Wilkinson 6.
3/19/82 Letter to W. J. Dircks from E. P. Wilkinson re: Progress on Memorandum of Agreement and Supplements w/ attachment 7.
4/2/82 Letter to C. Michelson from R. L. Haueter re: Request for NPRDS Data Base Tape 8.
4/13/82 Memo to Members, NPRDS lisers Group from R. L. Haueter re:
Meeting of NPRDS Users Group 9.
4/15/82 Letter to James Taylor from R. K. Seiberling re: INP0 By-Laws and the INPO Certificate of Incorporation w/ attachments
- 10. 4/16/82 Letter to C. Michelson from C. J. Ver Steeg re: INP0's Confidentiality Statement and Access :to Foreign Operational Data ll.
5/3/82 Letter to C. J. Heltemes from S. L. Rosen re: Power Reactors Events, Vol. 4, No. 1 12.
5/19/82 Letter to E. L. Boyle from T. N. Branum re: Licensee Event Reports Received at INP0 During the First Quarter of 1982 13.
5/20/82 Letter to C. Michelson from R. L. Haueter re: NRC Representation on the NPRDS Users Group
- 14. 6/8/82 Letter to C. J. Heltemes, Jr., from S. L. Rosen re: Draft of Power Reactor Events, Vol. 4, No. 2
- 15. 6/10/82 Rapifax to J. Heltemes from B. L. Cohn re: Draft of INP0's NPRDS Progress Report w/ attachment
- 16. 6/29/82 Letter to R. L. Dennig from A. W. Weyrauch re: HPRDS Data Base Ib
.~ ' T Re:
F0/IA-84-44 APPENDIX - 1982
- 17. 7/15/82 Letter to C. Michelson from E. P. Wilkinson re: INP0 Significant Event Reports and Significant Operating Experience Reports w/ attachments
- 18. 7/23/82 Letter to C. Michelson from E. P. Wilkinson re: Freedom of Information Act Request No.82-261 w/ attachments
- 19.
8/2/82 Letter to James Taylor from Z. T. Pate re: Comparison Made of INP0 and PAT Reports w/ attachments 20.
Duplicate Eliminated
- 21. 8/5/82 Letter to C. J. Heltemes, Jr., from S. L. Rosen re: Draft of Power Reactor Events, Vol. 4, No. 3
- 22. 8/6/82 Letter to G. F. Thompson from R. L. Haueter re: INP0 SERs
- 23. 8/9/82 Letter to C. J. Heltemes from R. L. Haueter re: Users Group Charter w/ attachment l
- 24. 8/10/82 Letter to C. J. Heltemes from R. L. Haueter re: INP0 Progress Report on NPRDS
- 25. 8/12/82 Letter to R. L. Dennig from A. W. Weyrauch re: NPRDS Data Base 26.
9/13/82 Letter to C. J. Heltemes from R. L. Haueter re: NPRDS Program Plan l
27.
9/28/82 Letter to C. Michelson from E. L. Zebroski re: Release to INP0 NRC Foreign Operational Data w/ attachment 28.
10/14/82 Letter to C. J. Heltemes from 5. L. Rosen re: Comments on the Draft of Power Events May-June 1982, Vol. 4, No. 4 w/ attachment 29.
11/1/82 Letter to W. J. Dircks from E. P. Wilkinson re: Drug Awareness Policy in the Industry w/ attachment 30.
11/4/82 Letter to R. Dennig from R. Simard re: NPRDS Users Group and its
(
Membership Expansion 31.
12/6/82 Letter to H. L. Thompson, Jr., from Z. T. Pate re: Performance Objectives and Criteria for Corporate Evaluation and Assistance Visits
- Withheld in Entirety
C' A.#
Re:
F0IA-84-44 APPENDIX - 1982 32.
12/10/82 Letter to C. Michelson from E. L. Zebroski re: Request for Input from INP0 Relative on the Current Status of Utility Participation in NPDRS w/ attachments 33.
12/16/82 Letter to W. J. Dircks from E. P. Wilkinson re: Management of NPRDS 34.
12/17/82 AGENDA - NIP 0/SWRI/NRC/INEL Meeting 35.
12/20/82 Rapifax to C. J. Heltemes from R. Simard re: Management of NPRDS 36.
12/22/82 Letter to W. Dircks from E. P. Wilkinson re: INP0 Progress Since Assuming Management of the NPRDS 37.
12/28/82 Letter to C. Michelson from E..P. Wilkinson re: Expansion in the Flow of Information on Operational Data 38.
12/31/82 Letter to Members of the NPRDS Users Group from R. L. Simard re: Meeting of the NPRDS Users Group w/ attached Agenda 39.
2/18/82 Letter to C. Michelson from S. L. Rosen attaching draft technical items agenda for review and coment 40.
7/22/82 Letter to W. J. Dircks from E. P. Wilkinson re: Work on the memo of Agreement 41.
8/2/82 Letter to C. Michelson from R. L. Haueter; Access to Data Bases on INP0's Computer 42.
11/23/82 Letter to H. L. Thompson from E. P. Wilkinson; audit of the SEE-IN Program 43.
5/5/82 Lettar to C. Michelson from M. K. Dunkle enclosing profiles of INP0 member utilities
l Re: FOIA-84-44 APPENDIX I APPENDIX -1984 1.
1/5/84 Memo to NPRDS Users Group from R. L. Simard re: Followup Mailing - NUG Meeting No. 4 w/ attached Exclusion of Data Outside of the NPRDS Basic Reportable Scope During Normal Retrieval
- 2. -1/10/84 Letter to C. J. Heltemes, Jr., from S. L. Rosen re: Comments on Draft Power Reactor Events Vol. 5, No. 4 w/ attached Comments 3.
.1/11/84 Letter to C. J. Heltemes from S. L. Rosen forwarding 16 reports 1
i i
e
V"#
p 3
LISTING 0F IriP0 IllTERilAL RECORDS APPENDIX - 1980 1.
Undated INP0 Alternative to NRC Rulemaking on Radiological Protection Plans 2.
1/17-18 Agenda for Meeting of NPRDS Users Group 3.
3/31/80 Joint Memorandum on Processing of LER's and Significant Events by NSAC and INP0 - signed by E. P. Wilkinson and E. L. Zebroski w/ attached Chart
smoo. mneo.. a Re: F0IA-84-44 APPENDIX H APPENDIX - 1981 1.
7/15/81 "The Institute of Nuclear Power Operations an Update" by Dr. Zack T. Pate 2.
9/25/81 Memo for R. L. Haueter et. al. from B. L. Cohn re: Memorandum of Agreement Meeting Number 2 with NRC on September 18, 1981 3.
10/30/81 Letter from E. P. Wilkinson re: Status of the Industry's Nuclear Plant Reliability Data System 4.
11/9/81 Memo for R. L. Haueter from R. L. Simard re: WPPSS Report,
" Evaluation of GADS vs NPRDS" w/ attached letter dated 10/28/81 and Statistical Analysis of NPRDS Failure Data Involving Pumps or Valves dated 10/81 5.
11/19/81 Letter to R. L. Haueter from A. W. Weyrauch re: Nuclear Plant Reliability Data Minutes of ANS 58-20 Subcommittee fleeting Held on October 8-9, 1981 in Atlanta Georgia w/ enclosures s
I
~
Re:
F01A-84-44 APPENDIX H APPENDIX - 1982 l.
1/82 Institute of Nuclear Power Operations Evaluation Release Policy 2.
1/18/82 Memo to E. L. Zebroski and R. L. Haueter from R. L. Simard re: Update of 12/30/81 Memo on NPRDS Session at 9th Annual Reliability Conference 3.
1/20/82 Memo to Members of Data Usage Working Group from R. L. Simard re: NPRDS Technical Asvisory Committee Meeting at INP0 on 2/4-5/82 w/ attached Agenda
,,,,,(, 4.
1/25/82 Accreditation of Nuclear Utility Training Basic Concepts pe w t ~ 5.
1/83 INP0 Directory 6.
4/23/82 Letter to R. L. Haueter from A. Weyrauch; Meeting minutes for NPRDS User Group Meeting, Feb. 4-5, 1982 in Atlanta, GA.
w
- w. w
, -w m w-
= -
c
'i 1L Re: F01A-84-44 APPENDIX H APPENDIX - 1983
- l.
4/13/83 NPRDS Interactive Data Entry Users Guide (DRAFT) 2.
5/83 Institute of Nuclear Power Operations Evaluation Release Policy
- 3.
6-12/83 Evaluation Schedule W/ attachments 4.
8/12/83 Memo for NPRDS Users Group from R. L. Simard re: Meeting Minutes 5.
9/1/83 Memo for Z. T. Pate from P. M. Beard, Jr., re: E&A Status of SERSWG Recommendations w/ attachment 6.
9/15/83 Memo for S. L. Rosen from R. L. Simard re: Update of NPRDS Participation Statistics Used in the NRC Briefing w/ attachments 7.
10/12/83 Memo for S. L. Rosen from R. L. Simard re: NPRDS Data Processing Monthly Report for September 1983 w/ attached Monthly Report 8.
11/2/83 Memo for S. L. Rosen from R. L. Simard re: NPRDS Data Processing Monthly Report for October 1983 w/ attached Monthly Report
- 9.
12/28/83 Letter to Points of Contact from Z. T. Pate re: Improper Manipulations of Control Rods w/ attachments
- 10.
/83 Excerpt from report on San Onofre re: Radiological Protection (pages 29-37)
- 11.
Undated flPRDS Status
- Uithheld in Entirety 4
Re:
F01A-84-44 APPEllDIX H APPENDIX - 1984 1.
1/3/84 Memo signed by E. P. Wilkinson re: Classification and Distribution of INP0 Publications w/ attach Letter to Non-Member or Non-Participant Requesting INP0 Documents i
l t
l i
1 4
--,.--,-,--,--,~m-----e-~-,=--
,s
-~e---~e
- - ~--, - - ~ ~
8.
l APPENDIX G LISTI'ir, OF IflPO CORRESP0'4DENCE SENT TO If4DIVIDUALS AND ORGA'JIZATIONS OTHER THAN THE NRC 1981 1.
6/2/81 Letter to Mr R. Patrick Mcdonald from E, P. Wilkinson and E. L. ZebrosRi, (1 page) 2, 7/13/81 Letter to ANS 58,20 Subconnittee from R L. Haueter,
Subject:
Placement of Management and Funding Responsttd11 ties for NPRDS Within INPO, (3pages) 3.
12/11/21 Letter to Mr. L. J. Cooper from R. L. Haueter.
(2pages) 4.
12/30/81 Letter to Mr. Joseph M. Farley from E. P. Wilkinson, with attachment:
INPO Procedure For Evaluation Follow-Up.
(2pages) 1982 1.
2/17/82 Letter to Mr. John Parris from R. L. Siamrd with attachments:
Meeting Minutes IEEE/UIWG, INPO, NRC/AEOD Coordination Meeting No. 2, and Special Meeting With INP0/NRC/ DOE Personnel Coordinatten Meeting No. 2 Attendance List.
{3 pages) 2.
Duplicate Eliminated 3,
5/21/82 Letter to NPRDS Users Group from R. L. Haueter, (1 page) 4.
6/29/82 Letter to Benjamin M. Tashjian from Arthur W. Weyrauch with
Attachment:
Letter to Mr. Art Weyrauch from Robert L. Dennig.
(2pages) 5.
8/12/82 Letter to Benjamin M. Tashjfan from Arthur W. Weyrauch.
(1page) 6.
9/8/82 Letter to Robert J. Addy from Arthur W. Weyrauch with Attachments:- Letter to R. S Baker and J M. Huzdovich from A. W. Weyrauch, Letter to Mr. R. J. Addy from M, J. Logan, and Letter to R. J. Addy from J. K, Legg.
(5pages) 7.
12/22/82 Letter to NPRDS Users Group Members from R. L, Simard with
Attachment:
Minutes from NPRDS Users Group Meeting, October 26, 1982 (38 pages) 8.
12/31/82 Letter to Members of the NPRDS Users Group from R. L Simard, (1 page) 9.
2/9/82 Letter to F. Culler from E. P. Hilkinson re:
fm t,-
1983 l.
1/17-18/83 Minutes from NPRDS Users.Sroup Meeting No. 2.
(28pages) 2.
1/28/83 Letter to Mr. Joseph M Farley from E. P. Wilkinson.
(2 pages) 3.
2/1/83 Letter to NPRDS Users Group Members from R. L. Haueter with
Attachment:
Letter to Mr. Joseph M. Parley from E. P. Wilkinson.
(3 rages) 4.
Duplicate Eliminated 5.
4/28/83 Letter to Mr. L. T. Gordon from Ellen Smith. (1 page) 6.
7/21/83 Letter to Members of the NPRDS Users Group from R. L. Simard with
Attachment:
Agenda for NPRDS Users Group Meeting August 9-10, 1983 (3 pages) 7.
6/28/83 Letter to Richard Badalamente from Linda D. Yauch.
(1 page) 8.
8/18/83 Letter to Members of the NPRDS Users Group from R. L. Simard with
Attachment:
Letter dated 8/1/83.
(4 pages) 9 8/22/83 Letter to Mr. L~ lan R. Sillin, Jr. from E. P. Wilkinson e
with
Attachment:
Present and Planned INPO Activities That Duplicate or Overlap Proposed NRC General Operating Criteria.
(7 pages) 10.
12/14/83 Letter to Mr. George Murphy from R. L. Simard.
(1 page)
r y
'~
APPEi4 DIX I APPENDIX - 1983 1.
1/19/83 Letter to E. L. Boyle from T. N. Branum re: Microfiche Containing all Licenseo Event Reports Revieved by INP0 During the First Three Quarters of 1982 2.
1/31/83 Letter to C. J. Heltemes from S. L. Rosen re: Draft Power Reactor Events, Vol. 4, No. 5 w/ attachment 3.
2/16/83 Memo for J. Taylor and H. Thompson from Z. T. Pate re:
14RC/INP0 Coordination Plans w/ attachments 4.
2/22/83 Letter to Linda Stoloff from D. G. Smith re: NRC Briefing w/ attachments 5.
2/28/83 Letter to E. L. Boyle from T. N. Branum re: Microfilm of 1981 Licensee Event Reports Received by the Institute 6.
3/1/83 Letter to C. J. Heltemes, Jr., from S. L. Rosen re: Comments on Draft of Power Reactor Events, Vol. 4, No. 6 7.
3/10/83 Letter to W. J. Dircks from E. P. Wilkinson re: Copy of CRGR Agenda (letter only) e 8.
3/10/83 Letter to E. L. Boyle from T. N. Branum re: iticrofile Containing all of the Licensee Event Reports Received by INP0 During the Fourth Quarter of 19,82 9.
3/24/83 Letter to J. Heltemes from A. S. Howard re: INP0 SEE-IN Program Plan 10.
3/30/83 Significant Event Evaluation and Information Network (SEE-IN)
Presentation 11.
Duplicate Eliminated 12.
~~
Letter to C. J. Heltemes from S. L. Rosen transmitting SER 4/8/83
- 's 18-83, 20-83, 21-83, and 27. A3. (letter only) 13.
4/21/83.
Letter to W. J. Dircks from E. P. Wilkinson re: Proposed Cbuncil of Nuclear Inspection Organizations w/ attachments Duplicate Eliminated
- 14. 4/29/83 Letter to C. J. Heltemes, Jr., from S. L. Rosen re:-NRC Document Control System J
e.
c.
APPENDIX - 1983 15.
5/3/83 Letter to C. J. Heltemes, Jr., from E. P. Wilkinson re: Access to Foreign Information w/ attachment 16, 5/3/83 Letter to C. J. Heltemes, Jr., from S. L. Rosen re: SERs Released to the NRC 17.
5/11/83 Letter to R. L. Dennig from S. L. Rosen re: NPRDS Reportable System and Component Scope Manual 18, 5/20/83 Letter to W. J. Dircks from E. P. Wilkinson re: NPRDS Briefing to the Commissioners w/ attachment 19.
5/24/83 Letter to C. J. Heltemes, Jr., from S. L. Rosen re: Draft of Power Reactor Events, Vol. 4, No. 7 20.
5/27/83 Presentation by Representatives of the Institute of Nuclear Power Operations to the Commissioners, Nuclear Regulatory Comission on Nuclear Plant Reliability Data System 21.
6/2/83 Letter to W. J. Dircks from E. P. Wilkinson re: Fitness for Duty w/ attachment 22.
6/3/83 Letter to R. Fraley from E. P. Wilkinson re: Advisory Committee on Reactor Safeguards w/ attachment 23.
6/7/83 Letter to W. J. Dircks from E. P. Wilkinson re: Commitment to NPDRS on VEPCO's Part w/ attachment 24.
6/20/83 Letter to C. J. Heltemes from S. L. Rosen re: INPO Summarized Utility Commitments to Begin or Resume Participation in NPDRS w/a ttachment 25.
6/27/83 Letter to C. J. Heltemes from S. L. Rosen re: Proposed Semi-Annual NPRDS Progress Report to the Commissioners 26.
7/5/83 Letter to B. Jones from A. S. Howard re: INPO Evaluation Reports i
27.
Duplicate Eliminated l
28.
7/28/83 Letter to R. Major from S. J. Rosen re: Comments on the l
Draf t NPRDS Reportable Scope Manual w/ attachment j
29.
8/12/83 Memo. for NPRDS Users Group from R. L. Simard 're: L eing Minutes
.J
Re:
F01A-84-64 APPENDIX - 1983 30.
8/15/83 Letter to C. J. Heltemes, Jr., from S. L. Rosen re:
Draf t Power Reactor Events, Vol. 5, No.1 31.
8/16/83 Letter to E. Boyle from D. T. Reilly re: Microfiche of the Licensee Event Reports 32.
9/13/83 Letter to E. L. Boyle from J. T. Wheelock re: Printout of Foreign Dockets w/ attachment 33.
9/25/83 Memo for Jack Roe from Zack Pane re: INP0 Interactions with '
GA0 and OMB w/ attachment 34.
9/26/83 Letter to C. J. Heltemes from S. L. Rosen re: Draft " Power Reactor Events", Vol. 5, No. 2 35.
9/27/83 Letter to E. Boyle from T. N. Branum re: Licensee Event Report Microfiche 36.
10/18/83 Letter to W. J. Dircks from E. P. Wilkinson re: Replacement 37.
10/19/83 Letter to J. Ebersole from R. L. Simard re: Uncontrolled Set of the NPRDS Reportable System and Component Scope Manual (letter only) 38.
11/7/83 Letter to J. J. Ray from E. P. Wilkinson re: Presentation to the ACRS by INPO Representative 38 a.11/11/83 Letter to C. J. Heltemes, Jr., from S. L. Rosen re: Draft of Power Reactor Events 39.
11/15/83 Letter to W. J. Dircks from E. P. Wilkinson re: Coordination Plan for NRC/INP0 Training-Related Activities 40.
11/18/83 Letter to C. J. Heltemes, Jr., from S. L. Rosen re: Data Tapes ffetted Accoeg gying Documentation for the Complete NPRDS Record File g
41.
11/28/83 Letter to C. J. Heltemes, Jr., from Z. T. Pate re: Abnormal Occurrence Reporting System Reports Available to INP0 42.
12/13-14/ tJPRDS Users Group - Meeging Agenda w/ attachments 1983 43.
12/19/83 Memo for NPRDS Users Group from R. L. Simard re: Minutes -
NUG Meeting No. 4 44 12/19/83 Letter to C. J. Heltemes from S. L. Rosen re: INP0's Plans to Restore the Viability and Effectiveness of the NPRDS w/ attachments l
..w
APPENDIX - 1983 45.
12/29/83 Letter to C. J. Heltemes from E. P. Wilkinson re: Release of Nuclear Plant Reliability Data System Data w/ attachment 46.
3/3/83 Letter to W. J. Dircks from E. P. Nilkinson re:
Coordination Plans
-47.
5/20/83 Letter to J. Heltemes from S. L. Rosen attaching 2 copies of the INP0 briefing to the NRC Commissioners 48.
1/18/83 Letter to C. Michelson from E. P. Wilkinson re:
Release of International Experience to INPO 49.
7/29/83 Letter to C. J. Heltemes from S. L. Rosen forwarding SER's and 0&MR's (letter only) 50.
8/12/83 Letter to C. J. Heltemes from S. L. Rosen enclosing 1 SOER and an updated list of 50ER's issued in 1983 (letter only) 51.
1/12/83 Letter to W. J. Dircks from E. P. Wilkinson re:
the benefit of a central HRC point of contact for INP0 documents 52.
10/18/83 Letter to C. J. Heltemes from S. L. Rosen forwarding SER's 67-83, 68-83, and 70-83 (letter only) e i
i i
\\