Text
.
3 T
A_.
L eab k H 03874 Telephone (603)474 9521 Facsimile (603)474-2987
)
Energy Service Corporation Ted C. Feigenbaum J
Senior Vice President and E.
Chief Nuclear Officer NYN-92141
=
A October 14, 1992 United States Nuclear Regulatory Commission
{yl Washington, D.C.
10555 Attention:
Document Ct.. trol Desk
References:
(a)
Facility Operating License No. NPF-86, Docket No. 50-443 7
(b)
North Atlantic Letter NYN-92121 date I September 4,1992 " Licensee k
Event Report 9211; leaperable Cooling Tower Fans', T. C. Feigenbaum q
to USNRC
-W (c)
North Atlantic Letter NYN-92127 dated September 30,1992 ' Licensee Amendment Request 92-13; Mariual Operation of Cooling Tower Fans q
and Sprays", T. C. Feigenbaum to USNRC T
Subject:
License Amendment Request 92-13: Request for Additional Informatior.
Gentlemen:
North Atlaatic Energy Service Corporation (North Atlantic) submitted License
'mendment Request 92-13 [ Reference (b)] to revise the operation of the Seabrook Station j
cooling tower fans and sprays from automatic to manual, in the License Amendment M
Request, North Atlantic referred to an analysis of cooling tower basin heatup that was 3
available for NRC review at Seabrook Station.
]'i NRC Staff personnel have recaested that the analysis be made available for the
=
review.
In order to facilitate the r:: view of License Amendment Request 92-13, North j
Atlantic is providing the cooling tower basin heatup evaluation in Enclosure 1.
Shot.ld you have any questim.., :egardinb this matter please contact Mr. Terry L, Harpster, Director of Licensing Serv:ces at (603) 474 9521, extension 2765.
5 Very truly yours,
]!
bf b
Ted C. Feigenbaum I
--5 TCF:J M P/ss/ tad 5
4 Enclosure (s)
J 9
t
.A
.e n n es -
10U000 it a member of the Nor'heast Utilities system 9
]py 9210200320 921014 PDR ADOCK 05000443 g
p PDR
.H-g 3
3
United States Nuclear Regulatory Commission October 14, 1992 Attention:
Document Control Desk Page two ec:
hir Thomas T. Martin Regional Administrator U.S. Nuclear Regulatory Commission Region !
475 Allendale Road King of Prussia - PA 19406 Mr. Gordon. E. Edison, Sr. Project Manager Project Directorate.13 Division-of Reactor Projects U.S. Nucleat Rcg'.latory Commission j^
Washington, DC. 20555 Mr. Noel Dudley NRC Senior Resident inspector P.O. Box 1149 Seabrook,' NH 03874=
Mr, John Shediosky, Acting Section Chief
- Project Section 3B U.S. Nuclear. Regulatory Commissior.
Region I 475 Allendale Road King of Prussia, PA 19406 3..
1.
-North Atlantic
-i O ctobe r-- 14, 1992-
)
ENCLOSURE 1 TO NYN 92141 Evaluation of Ccoling Tower Basin Heatup Analysis With Sprays and Fans Manually Controlled"-
t Ah