Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138B893 + (01:04:01, 12 December 2024)
- ML20138B891 + (01:04:02, 12 December 2024)
- ML20138B890 + (01:04:02, 12 December 2024)
- IR 05000801/2009008 + (01:04:03, 12 December 2024)
- ML20138B885 + (01:04:04, 12 December 2024)
- ML20138B878 + (01:04:05, 12 December 2024)
- ML20138B877 + (01:04:05, 12 December 2024)
- ML20138B876 + (01:04:06, 12 December 2024)
- ML20138B873 + (01:04:07, 12 December 2024)
- ML20138B870 + (01:04:08, 12 December 2024)
- ML20138B869 + (01:04:08, 12 December 2024)
- TXX-4588, Interim Deficiency Rept SDAR-200 Re Glastic Matl Separation Barriers Installed in Class 1E Maint Control Boards & Panels W/O Proper Design Basis Documentation.Initially Reported on 850918.Completion by 860305 Anticipated + (01:04:09, 12 December 2024)
- ML20138B863 + (01:04:10, 12 December 2024)
- ML20138B864 + (01:04:10, 12 December 2024)
- 3F0386-08, Informs That Trolley Bumpers for Auxiliary Bldg Crane Not Required Per Analysis to Determine Loads Resulting from Impacting Wheel Stops & Effects of Loads.Stops Adequate to Maintain Safety + (01:04:11, 12 December 2024)
- ML20138B861 + (01:04:11, 12 December 2024)
- ML20138B860 + (01:04:12, 12 December 2024)
- ML20138B858 + (01:04:13, 12 December 2024)
- ML20138B859 + (01:04:13, 12 December 2024)
- 05000368/LER-1985-006, :on 850221,fire Watch Door Found Open.Caused by Failure to Label Door,Per New Fire Barrier & Penetration Marking Program Requirements.Door Labeled & Closed. Surveillance Verified Proper Labeling + (01:04:15, 12 December 2024)
- 05000277/LER-1997-002-03, :on 970326,TS Violation Identified as Result of Reactor Operation Slightly in Excess of Licensed Thermal Power.Ctp Calculation Program Was Modified to Compensate for Recirculation Pump Motor Power Factor + (01:04:18, 12 December 2024)
- ML20138B853 + (01:04:19, 12 December 2024)
- ML20138B852 + (01:04:19, 12 December 2024)
- AECM-85-0333, Forwards Application for Amend to License NPF-29 Revising Tech Specs to Allow Insp of Low Pressure Turbine Discs at Insp Interval Not to Exceed 50,000 H of Operation + (01:04:20, 12 December 2024)
- ML20138B850 + (01:04:20, 12 December 2024)
- L-85-395, Monthly Operating Repts for Sept 1985 + (01:04:25, 12 December 2024)
- ML20138B845 + (01:04:26, 12 December 2024)
- ML20138B846 + (01:04:26, 12 December 2024)
- ML20138B843 + (01:04:27, 12 December 2024)
- ML20138B841 + (01:04:28, 12 December 2024)
- ML20138B840 + (01:04:28, 12 December 2024)
- ML20138B836 + (01:04:29, 12 December 2024)
- ML20138B834 + (01:04:30, 12 December 2024)
- ML20138B833 + (01:04:30, 12 December 2024)
- ML20138B831 + (01:04:31, 12 December 2024)
- 05000213/LER-1985-013, :on 850916,licensee Discovered Rod Misalignment Power Peaking Penalty Not Imposed on Fuel Cycle Design & Safety Analysis.Caused by Inadequacy of Design Requirements. Allowable Axial Offset Limit Reduced + (01:04:33, 12 December 2024)
- NSD-NRC-97-5081, Forwards Proprietary Presentation Matl from 970312 Meeting W/Staff Re Long Term Cooling.Proprietary Encl Withheld,Per 10CFR2.790.Nonproprietary Presentation Also Encl + (01:04:34, 12 December 2024)
- ML20138B826 + (01:04:35, 12 December 2024)
- 05000454/LER-1997-014, :on 960903,failure to Comply W/Design Basis Due to Degradation of Boraflex in Sf Racks Was Identified.Review of SFP Criticality Analysis & Addl Controls & Reviews of Externally Generated Calculations Established + (01:04:37, 12 December 2024)
- ML20138B822 + (01:04:38, 12 December 2024)
- ML20138B821 + (01:04:38, 12 December 2024)
- ML20138B820 + (01:04:39, 12 December 2024)
- AECM-86-0078, Withdraws 851011 Application for Amend to License NPF-29 Re Installation of Air Receiver Pressure Indication. Requirements of License Condition 2.c.(33)g Will Be Fulfilled Prior to Startup from First Refueling + (01:04:40, 12 December 2024)
- ML20138B818 + (01:04:40, 12 December 2024)
- ML20138B814 + (01:04:41, 12 December 2024)
- ML20138B813 + (01:04:42, 12 December 2024)
- NSD-NRC-97-5085, Submits Westinghouse Responses to NRC Questions & Comments Re AP600 Ts,For SSAR + (01:04:45, 12 December 2024)
- ML20138B809 + (01:04:48, 12 December 2024)
- 05000369/LER-1997-003-02, :on 970326,both Trains of Control Room Ventilation Sys Inoperable Due to Isolated Air Intake Valves.Radiation Monitor Will Be Evaluated to Determine If Changes Are Needed in Design or Maint + (01:04:50, 12 December 2024)
- ML20138B806 + (01:04:51, 12 December 2024)
- HL-5355, Informs That Review of Mods to Logic Circuits for Rps,Dg Loading Shedding & Load Sequencing & Actuation Logic for ECCS Was Completed on 970331,per GL 96-01 + (01:04:52, 12 December 2024)
- ML20138B805 + (01:04:52, 12 December 2024)