J OPERATING. DATA REPORT 50-364 DOCKET NO.
DATE 10-?-85 COMPLETED BY T n t?nna,rd TELEPHONE (20s)899-5156 OPERATING STATUS Joseph M. Farlev Unit 2 Notes
- 1. Unit Name:
September, 1985
- 1) Cuniulative data since
- 2. Reportmg Period:
2652 7-30-81, date of
- 3. Licensed Thermal Power (MWt):
commercial operatfon.
860
- 4. Nameplate Rating (Gross MWe):
829
- 5. Desgn Electncal Rating (Net MWe):
850.2
- 6. Maximum Dependable Capaaty (Gross MWe):
807.2
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A N/A
- 9. Power Level To Wluch Restncted.lf Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
N/^
O This Month Yr.-to.Dete Cuniulative i
720 6,551 36,576
- 11. Hours la Reportmg Period
- 12. Number Of Hours Reactor Was Critical 720.0 4,679.1 31.597.6 0.0 0.0-138.0
- 13. Reactor Reserve Shutdown Hours
,w. o 4, m.a 31,ma.*
t
- 14. Hours Generator On.Line
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,867,238 11,637,710 78,490,458_
618,848 3,857,976 25,804,258
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electncst Energy Generated (MWH) 589,632 3,642,124 24,461,046 l
100.0 70.3 85.3 t
- 19. Unit Service Factor 100.0 70.3 85.3
- 20. Unit Availability Factor
- 21. Unit Capaaty Factor (Using MDC Net) 101.5 68.9 82.6 j
98.8 67.1 80.7
- 22. Unit Capacity Factor (Using DER Net) 0.0 3.2 5.1
- 23. Unic Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
i' N/A N/A
- 25. If Shur Down At End Of Report Period.Ecrimated Date of Startup:
- 26. U.iits In Test Status t Prior to Commercial Operation):
Forr. cast Achieved 05/06/81 05/08/81 INITIAL CRITICALITY 05/24/81 05/25/81 INITIAL ELECTRICITY I
COMMERCIAL OPERATION 08/01/81 07/30/81 /
l
{
8510220054 850930
\\
l PDR ADOCK 05000364
'I I
R PDR (9/~7i
,~.
^
'~
DOCKET NO. 50-364 2
UNIT DATE 10-2-85 COStPLETED BY 3 0 Wood'rd (205)899-5156 TELEPHONE i
510NTig Sep tc.nb er, 1985 l
DAY AVERACE DAILY F0WER LEVEL DAY AVERAGE DAILY POWER LEVEL (5lWe-Net)
(31We-Net) 800 828 g_
37 734 13 828 3
-- gjy g9, y,,,
4' 815 20 824 809 823 g
3 823 822 6
g 7
817 23 820 815 g
- 4 822 9
814 25-821 10 818 aj 822 11 823 27 All 827 12 3
834 4
13 824 3
82R 14 835 30 811 831 15 3g 16 830 I? G UCIONS I
On this form:r. list the 2venge dstly urut power !cvet in htWe Net for esch d:y in the reporung month. Compute to
, the ne:re:t whole me;swatt.
O
~
O O
O DOCKETNO. 50h64 UNITSilHTDOWNS AND POWER REDUCTIONS UNITNAME 1 M-W rlay - Uriit 2 DATE 10-2-85 COMPT.ETEll uY J. D. Woodard REPORT MONTil Sentember-1985 TEl.EPilONE (20s) 899-5156 "L
No.
Date
}
j _e.
j 7 Ey Elcensee 5%,
5*L t=5 c
r.
g Cause & Cusseclive g!
g e3x Event u3 o-3 Action to x
du u
o$
g j di g Repsu #
Picveni Recurrence b
TH ERE WERE NO U 4If S IUTDOWNS OR SI ;NIFICA1 IT POWER REDUCT IONS DI. RING THE M STH OF SEPTEMBER t
l l
2 3
4 F: Forced Reason:
Method:
Exhibis G Insieuctions S: Stheduled A Equipmeni Failure (E.splain) l Manual for Prepasation of Data B-Maintenance of res 2 Manual Scram.
Eatiny sliccis for 1.icensee C-Refocling 3 Automatic Scram.
Esent Repius (1.ER) file (NUREG-D-Regulatosy Renesiction 4 Othes (Emplain) 016in E-Opesator Tsaining & license Exandnation F-Adninistrative 5
G-Opcsalional Estor (Explin)
Eshibit i-Sanw Saura (9/77) ll Othes (Expl.in)
. _~. __
Mailing Address Attams Power Cornpany 600 North 18th Strert -
Post Othce Box 2641 Birmingham, Alabama 35291 Tetephone 205 783-6090 R. P. Mcdonald Senior Vice rresident Fhntridge Building Alabama Power n.+, :n r, n October 17, 1985 Docket No. 50-364 Director, Office of Resource Management U. -S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M.' Farley Nuclear Plant Unit 2 Monthly Operating Data Report
. Attached are two (2) copies of the September 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2,- required 'by Section
}
6.9.1.10 of Appendix A of the Technical Specifications.
If you have any questions, please advise.
Yours very truly, a >. 4. M A " p-R. P. Mcdonald RPM /SNK:nac/F-2 Enclosures xc: Director, IE (10 copies)
Director, RII (1 copy) v X
\\
\\
{
t r
e JOSEPH M. FARLEY NUCLEAd PLANT UNIT 2 NARRATIVE SlM4ARY OF OPERATIONS SEPTEMBER, 1985 I
There were no unit shutdowns or significant power reductions during the month of September, i
The following major safety-related maintenance was performed r
in the month of September:
1.
Miscellaneous corrective and preventive maintenance was performed on the diesel generators.