Proposed Tech Spec Allowing Insp of Low Pressure Turbine Discs at Insp Interval Not to Exceed 50,000 H of Operation
ML20138B870
Person / Time
Site: Grand Gulf 
Issue date: 11/01/1985
From:
MISSISSIPPI POWER & LIGHT CO.
To:
Shared Package
ML20138B837 List:
References
TAC-60085, NUDOCS 8512120400
Download: ML20138B870 (1)


Text

-

y 9-Final evaluations and reconnendations from the TDI Owners T-(b)

Group Program applicable to GGNS Unit 1, and MP&L's actions in response to this program for the standby diesel gener-ators shall be submitted for NRC review and approval prior to startup following the first refueling outage.

(26) Turbine Disc Integrity (Section 10.2.1, SER, SSER #1)

  • Iofwi"
fgioR to usu.l.h 54,000 houts Caring :::h refueling cet:;: MP&L shall ultrasonically inspect the bores and keyways of the low pressure turbine discs for indications of crackin g All unacceptable indications and their dispositions shall be reported prior to startup for the These inspections shall continue oa a secoo next cycle of operation.

until the potential for turbine disc cracking has been assessed Ao.4 cou4,,i and an acceptable alternate inspection schedule has been established.

(27) Circulatine Water System (Section 10.4.5, SER)

MP&L shals not fill the Unit 2 circulating water system (includ-ing the aatural draft cooling tower basin) until Unit I flooding concerns related to this system are resolved to the satisfaction of the NRC staff.

Advisor to Vice President (Section 13.1.1, SER, SSER #2, SSER #4, (28)

SSER f5)

MP&L shall provide one or more additional staff members, reporting directly to a Vice President principally in charge of nuclear operations, who have substantial cmmnercial nuclear power plant operating nanagement experience and who will act as advisors to the vice president on all decisions affecting safe operation of The additional staff members may be permanent the plant.

employees or contracted consultants, but they shall be retained in this advisory position until the plant has operated for at least 6 months at power levels above 90% of full power.

(29) Operating Shift Advisor '(Section 13.1.2 SER)

At least one individual on each operating shift shall have sub-stantive previous BWR operating experience, including startup and shutdown of a BWR and under conditions that one might expect to encounter during the initial startup and power escalation at the Grand Gulf plant. This individual is not required to be licensea on Grand Gulf Unit I and need not be an MP&L employee, but as a minimum shall be retained on a contract basis to act as a consultant or advisor to the GGNS Such an experienced person shall be assigned to shift crew.

each operating shift until the plant achieves and demonstrates full power operation.

051212o400 851210 PDR ADOCK 05000416 P