Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138R164 + (22:48:55, 11 December 2024)
- ML20138R162 + (22:48:55, 11 December 2024)
- ML20138R158 + (22:48:56, 11 December 2024)
- ML20138R157 + (22:48:57, 11 December 2024)
- ML20138R156 + (22:48:58, 11 December 2024)
- ML20138R155 + (22:48:58, 11 December 2024)
- RBG-22-514, Final Deficiency Rept DR-193 Re post-LOCA Passive Failure in ECCS Suction Line in Auxiliary Bldg Crescent Area.Initially Reported on 850114.Suppression Pool Pumpback Sys Intended to Mitigate post-LOCA Passive Failures + (22:48:59, 11 December 2024)
- ML20138R154 + (22:48:59, 11 December 2024)
- ML20138R152 + (22:49:00, 11 December 2024)
- ML20138R151 + (22:49:01, 11 December 2024)
- ML20138R150 + (22:49:02, 11 December 2024)
- ML20138R148 + (22:49:03, 11 December 2024)
- ML20138R147 + (22:49:04, 11 December 2024)
- ML20138R144 + (22:49:05, 11 December 2024)
- ML20138R146 + (22:49:05, 11 December 2024)
- BECO-85-135, Rept of Changes,Tests & Experiments Performed at Facility for 840122-850121 + (22:49:06, 11 December 2024)
- ML20138R136 + (22:49:07, 11 December 2024)
- ML20138R132 + (22:49:08, 11 December 2024)
- ML20138R133 + (22:49:08, 11 December 2024)
- B11864, Provides Status of Final tie-ins Re Degraded Grid Protection for Class 1E Power Sys.Redesign & Procurement Completed in Time to Support Final Implementation During 1987 Refueling outage.Mid-cycle Implementation Not Feasible + (22:49:10, 11 December 2024)
- ML20138R131 + (22:49:10, 11 December 2024)
- ML20138R128 + (22:49:11, 11 December 2024)
- U-600324, Notifies That Rev 0 to State of Il Plan for Radiological Accidents,Clinton Annex,Map E Includes List Entitled, Clinton Nuclear Power Station Medical Facility Identification List, Per NRC Response to Guard Remand + (22:49:12, 11 December 2024)
- ML20138R125 + (22:49:13, 11 December 2024)
- ML20138R124 + (22:49:13, 11 December 2024)
- ML20138R123 + (22:49:14, 11 December 2024)
- ML20138R120 + (22:49:15, 11 December 2024)
- ML20138R118 + (22:49:15, 11 December 2024)
- ML20138R116 + (22:49:16, 11 December 2024)
- ML20138R115 + (22:49:17, 11 December 2024)
- ML20138R114 + (22:49:17, 11 December 2024)
- 05000255/LER-1985-020, :on 851008,discovered That Scheduled Date for Main Steam & Feedwater Sys Hydrostatic Test Exceeded ASME Required Time Interval.Caused by Misinterpretation of Requirements.Review Performed + (22:49:19, 11 December 2024)
- ML20138R112 + (22:49:20, 11 December 2024)
- ML20138R110 + (22:49:21, 11 December 2024)
- ML20138R109 + (22:49:21, 11 December 2024)
- ML20138R106 + (22:49:22, 11 December 2024)
- ML20138R104 + (22:49:24, 11 December 2024)
- ML20138R105 + (22:49:24, 11 December 2024)
- ML20138R103 + (22:49:25, 11 December 2024)
- ML20138R102 + (22:49:25, 11 December 2024)
- ML20138R100 + (22:49:26, 11 December 2024)
- A05307, Responds to Violations Noted in Insp Rept 50-245/85-15. Corrective Actions:Written Procedures Specifying Calibr Requirements Developed,Reviewed & Approved for safety-related Feedwater Coolant Injection Sys + (22:49:27, 11 December 2024)
- ML20138R098 + (22:49:27, 11 December 2024)
- ML20138R097 + (22:49:28, 11 December 2024)
- ML20138R096 + (22:49:29, 11 December 2024)
- 05000325/LER-1985-056, :on 851010,surveillance Test to Verify Slope of APRM Flow Bias Thermal Trip & Upscale Alarm Deemed Inadequate.Caused by Inappropriate Procedural Rev in Oct. Revs for Proper Testing Planned + (22:49:30, 11 December 2024)
- ML20138R092 + (22:49:32, 11 December 2024)
- ML20138R089 + (22:49:32, 11 December 2024)
- ML20138R087 + (22:49:33, 11 December 2024)
- ML20138R086 + (22:49:34, 11 December 2024)
- ML20138R084 + (22:49:35, 11 December 2024)
- ML20138R085 + (22:49:35, 11 December 2024)