Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20147F859 + (17:55:34, 11 December 2024)
- ML20147F856 + (17:55:35, 11 December 2024)
- B12836, Responds to NRC 870218 Request for Addl Info Re Physics Methodology for PWR Reload Design + (17:55:36, 11 December 2024)
- ML20147F854 + (17:55:36, 11 December 2024)
- ML20147F851 + (17:55:37, 11 December 2024)
- 05000328/LER-1988-003-02, :on 880119,discovered Ice Buildup in Flow Passages of Ice Condenser Due to Sublimation.Cause Not Determined.Ice Condenser Defrosted & Special Maint Instruction Performed + (17:55:39, 11 December 2024)
- ML20147F847 + (17:55:40, 11 December 2024)
- ML20147F845 + (17:55:41, 11 December 2024)
- ML20147F841 + (17:55:43, 11 December 2024)
- ML20147F838 + (17:55:43, 11 December 2024)
- ML20147F837 + (17:55:44, 11 December 2024)
- ML20147F835 + (17:55:45, 11 December 2024)
- ML20147F834 + (17:55:45, 11 December 2024)
- ML20147F832 + (17:55:46, 11 December 2024)
- 05000213/LER-1988-003, :on 880204,electric Fire Pump Declared Inoperable Due to High Amperage.Caused by Physical Damage to Stuffing Box Brass Bushing in Electric Driven Fire Pump. Repairs Initiated on Pump + (17:55:51, 11 December 2024)
- PY-CEI-NRR-0818, Suppls 880210 Tech Spec Change Request Re Turbine Valve Insp Deferrals.Asserts That Need Still Exists for Requested one-time Extension to First Refueling Outage,Scheduled for First Quarter 1989 + (17:55:52, 11 December 2024)
- ML20147F823 + (17:55:53, 11 December 2024)
- ML20147F824 + (17:55:53, 11 December 2024)
- ML20147F822 + (17:55:54, 11 December 2024)
- ML20147F813 + (17:55:55, 11 December 2024)
- ML20147F812 + (17:55:56, 11 December 2024)
- ML20147F811 + (17:55:56, 11 December 2024)
- ML20147F805 + (17:55:57, 11 December 2024)
- ML20147F807 + (17:55:57, 11 December 2024)
- ML20147F801 + (17:55:58, 11 December 2024)
- ML20147F799 + (17:55:59, 11 December 2024)
- ML20147F795 + (17:56:00, 11 December 2024)
- ML20147F796 + (17:56:00, 11 December 2024)
- ML20147F794 + (17:56:01, 11 December 2024)
- ML20147F789 + (17:56:01, 11 December 2024)
- ML20147F786 + (17:56:02, 11 December 2024)
- ML20147F782 + (17:56:03, 11 December 2024)
- ML20147F784 + (17:56:03, 11 December 2024)
- ML20147F781 + (17:56:05, 11 December 2024)
- ML20147F780 + (17:56:06, 11 December 2024)
- ML20147F776 + (17:56:06, 11 December 2024)
- ML20147F774 + (17:56:07, 11 December 2024)
- ML20147F771 + (17:56:08, 11 December 2024)
- ML20147F773 + (17:56:08, 11 December 2024)
- ML20147F768 + (17:56:09, 11 December 2024)
- ML20147F767 + (17:56:09, 11 December 2024)
- ML20147F762 + (17:56:10, 11 December 2024)
- ML20147F759 + (17:56:11, 11 December 2024)
- ML20147F760 + (17:56:11, 11 December 2024)
- ML20147F758 + (17:56:12, 11 December 2024)
- 05000263/LER-1987-023, :on 871125,crack in Pipe (Mfg by Sandvik,Inc) in Decontamination Connection on Reactor Recirculation Sys Loop a Found.Caused by High Cycle Fatigue.Decontamination Connection Modified + (17:56:14, 11 December 2024)
- ML20147F756 + (17:56:15, 11 December 2024)
- 0CAN028809, Forwards Response to Generic Ltr 88-02, Isap Ii. Program Suggested to Be Coordinated W/Resolution of Severe Accident Issues + (17:56:16, 11 December 2024)
- ML20147F752 + (17:56:16, 11 December 2024)
- ML20147F745 + (17:56:17, 11 December 2024)
- ML20147F743 + (17:56:18, 11 December 2024)
- ML20147F741 + (17:56:20, 11 December 2024)