Submits Suppl to Summary Rept of Startup Test Program. Following Completion of Dynamic Response Test 1-600-06 Evaluation & Resolution of Perms Test 1-6SD-01 Open Items, Power Ascension Test Sequence Procedure Will Be Completed
ML20147F832
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/29/1988
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
0783M, 783M, SL-4154, NUDOCS 8803080051
Download: ML20147F832 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ __

's ,, "/

  • Att"nt3, Georgia 30308 Telephone 404 526026

. Of 545 Attanta. Georpa 30302 -

Georgia Power

. L T. Quews #4 * * " M ' W "

Manager Nudear Safety and Lmenseg SL-4154 0783m- t X7GJ17-V750 February 29, 1988 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C. 20555 PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 SUPPLEMENT TO

SUMMARY

REPORT OF STARTUP TEST PROGRAM Gentlemen:

Section 6.8.1.1 of the Vogtle Electric Generating Plant Unit -1 Technical Specifications requires Georgia P)wer Company (GPC) to submit a supplement to the summary report of plant startup and power escalation testing every three months until completion of the test program.

In our letter dated November 30, 1987 CPC identified three startup tests and the overall Power Ascension Test Sequence procedure (1-600-13) as outstanding. Since theti, the final thermal expansion measurements have been evaluated and found acceptable. All acceptance criteria for the Thermal Expansion Test (1-600-11) were met and plant response was determined to be within allowable tolerances. '

Data collected during the Dynamic Response Test (1-600-06) is undergoing final evaluation and will be reported in a later supplement to the startup report.

Testing of four radiation monitors within the Process anu Effluent Radiation Monitoring System (PERMS) remains open. Resolution of these open items is in progress to allow clost:re of the PERMS Test (1-050-01).

This will be reported in a later supplement to the startup report.

Following completion of the Dynamic Response Test (1-600-06) evaluation and resolution of PERMS Test (1-6SD-01) open items, the Power Ascension Test Sequence procedure will be completed, thus completing the startup test program for Vogtie Unit 1. t

pst6 8803080051 8B0229 ' l PDR ADOCK 05000424 P DCD

4

, + ,

GeorgiakwerA

'l U. S. Nuclear Regulatory Commission l February 29, 1988 Page Two Please contact this office if you have any questions.

Stricerely,

  1. ed$ m L. T. Gucwa EMB/im c: Georgia Power Co_mgtny Mr. P. D. Rice Mr. G. Bockhold, Jr.

GO-NORMS

~U. S. Nuclear Regulatory Commission Dr. J. N. Grace, Regional Administrator Mr. J. B. Hopkins, Licensing Project Manager, NRR (2 copies)-

Mr. J. F. Rogge Senior Resident Inspector-0perations, Vogtle 0783m i i

700775