Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195D140 + (00:18:01, 11 December 2024)
- ML20195D139 + (00:18:02, 11 December 2024)
- ML20195D138 + (00:18:04, 11 December 2024)
- ML20195D136 + (00:18:07, 11 December 2024)
- ML20195D134 + (00:18:10, 11 December 2024)
- 05000328/LER-1988-022, :on 880519,10CFR Unqualified Butt Splice Found on Steam Generator Level Transmitter Causing Condition Outside Plant Design Basis.Caused by Not Changing Splice When Specs Changed.Unqualified Splice Replaced + (00:18:12, 11 December 2024)
- ML20195D131 + (00:18:16, 11 December 2024)
- ML20195D127 + (00:18:34, 11 December 2024)
- IR 05000482/1988016 + (00:18:35, 11 December 2024)
- ML20195D123 + (00:18:36, 11 December 2024)
- ML20195D122 + (00:18:37, 11 December 2024)
- ML20195D120 + (00:18:37, 11 December 2024)
- ML20195D118 + (00:18:38, 11 December 2024)
- ML20195D119 + (00:18:38, 11 December 2024)
- ML20195D117 + (00:18:39, 11 December 2024)
- ML20195D116 + (00:18:40, 11 December 2024)
- ML20195D115 + (00:18:40, 11 December 2024)
- ML20195D114 + (00:18:41, 11 December 2024)
- IR 05000458/1986012 + (00:18:47, 11 December 2024)
- ML20195D112 + (00:18:47, 11 December 2024)
- ML20195D110 + (00:18:48, 11 December 2024)
- A98053, Forwards Change Instructions for Update to Zion UFSAR, Rewritten to Reflect Permanent Defueled Condition of Plant. & DSAR, + (00:18:49, 11 December 2024)
- U-600585, Documents Justification That Fire in Vicinity of Valves Listed in Section 3.5.1.2,Paragraph 2 of Safe Shutdown Analysis Will Not Prevent Plant Shutdown + (00:18:49, 11 December 2024)
- PNO-II-86-035, on 860511,partial Loss of Power & Initiation of Train B Safety Injection Occurred When Station Battery 1-B Removed from Svc.Caused by Failure of Adjusted Battery Chargers to Pick Up Load.Power Restored + (00:18:51, 11 December 2024)
- ML20195D107 + (00:18:51, 11 December 2024)
- ML20195D103 + (00:18:52, 11 December 2024)
- ML20195D101 + (00:18:53, 11 December 2024)
- ML20195D100 + (00:18:53, 11 December 2024)
- B17491, Submits Revised Response to Violations Noted in Insp Rept 50-336/98-202.Corrective Actions:Test Plan for Pdcr 2-065-95 Was Revised to Incorporate Design Requirements + (00:18:54, 11 December 2024)
- ML20195D097 + (00:18:56, 11 December 2024)
- ML20195D090 + (00:18:58, 11 December 2024)
- ML20195D093 + (00:18:58, 11 December 2024)
- ML20195D089 + (00:18:59, 11 December 2024)
- ML20195D084 + (00:19:00, 11 December 2024)
- ML20195D087 + (00:19:00, 11 December 2024)
- ML20195D083 + (00:19:01, 11 December 2024)
- IR 05000275/1970001 + (00:19:02, 11 December 2024)
- ML20195D081 + (00:19:03, 11 December 2024)
- ML20195D079 + (00:19:04, 11 December 2024)
- RBG-44690, Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment + (00:19:04, 11 December 2024)
- 05000327/LER-1988-019, :on 880424,reactor Trip Signal Generated from Electromagnetic Interference.Caused by Welding Machine Operating at High Frequency Near Source Range Nuclear Instrument Cabling.Signals Can Be Bypassed + (00:19:12, 11 December 2024)
- ML20195D076 + (00:19:13, 11 December 2024)
- ML20195D071 + (00:19:14, 11 December 2024)
- ML20195D074 + (00:19:14, 11 December 2024)
- ML20195D069 + (00:19:15, 11 December 2024)
- ML20195D068 + (00:19:15, 11 December 2024)
- ML20195D067 + (00:19:16, 11 December 2024)
- IR 05000482/1988012 + (00:19:24, 11 December 2024)
- ML20195D061 + (00:19:25, 11 December 2024)
- ML20195D063 + (00:19:25, 11 December 2024)
- ML20195D060 + (00:19:26, 11 December 2024)