Ro:On 860430,Unit 2 Diesel Generator 1B Required 12.5 to Reach Rated Conditions.Caused by Inadequate Prime in Fuel Oil Supply Line.Union Lightened
ML20195D100
Person / Time
Site: Byron 
Issue date: 05/19/1986
From: Querio R
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
BYRON-86-0495, BYRON-86-495, NUDOCS 8606020095
Download: ML20195D100 (2)


Text

4

, )[

Commonwealth E'ison N

e\\ Byron NucturSt tion y

(d v_

/ 4450 North Grrman Church Roid J Byron, Illinois 61010 N

4 May 19,1986 LTR:

BYRON 86-0495 FILE:

2.7.400 Mr. James G. Keppler Regional Adminstrator Region IH U. S. Nuclear Regulatory Commission 700 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Sir:

This special report is submitted in accordance with Byron Station Unit 1 Operating License NPF-37 Appendix A, Technical Specification 4.8.1.1.3, reporting of Diesel Generator Failures.

This report adoresses one valid test and failure experienced on the IB Diesel Generator.

The criteria to determine valid tests and failures is in accordance with Section C.2.c of Regulatory Guide 1.108.

On April 30,1986 at 1018 following a Unit 2 System Auxiliary Transformer failure, the IB Diesel Generator was started in accordance wnh Limiting Condition for Operation Action Requirement (LCOAR) IBOS 8.1.1-la for one offsite circuit inoperable. Per Technical Specification 4.8.1.1.2 the Diesel Generators are required to reaci rated speed, voltage, and frequency within ten seconds of the start signal. The IB Diesel Generator required 12.5 seconds to reach rated conditions. At 1021 the IB Diesel Generator was shutdown and LCOAR 8.1.1-la was initiated for one Offsite Circuit and one Emergency Diesel Generator inoperable. At 1028 the IB Diesel Generstor was restarted and reached rated conditions in 8.0 seconds. The Diesel was run (ontinuously until 1150 when corrective actions were complete. At 1430 LCOAR 8.1.1-la for one Offsite Circuit and one Diesel Generator inoperable was exited.

The intermediate cause for the slow start of the IB Diesel Generator was an inadequate prime in the fuel oil supply line. The root cause was a small fuel oilleak at the union of the fuel oil supply line and the fuel oil filter. The union was tightened, and the

)

Icak was stopped.

'\\

0606020095 860519 PDR ADOCK 05000455 g

PDR MAY 2 21986 \\

i-BYRON 86-0495 i

Page 2 The IB Diesel Generator was inoperable for four hnurs following this valid test and failure. This failure is the first failure within the last twenty valid tests, therefore the testing frequency of the IB Diesel Generator is not affected.

dew-R. E. Querio Station Manager Byron Nuclear Power Station j

REQ /JC/bf ec:

J. Ilinds, NRC Resident inspector U. S. NRC Document Control Desk, Washington D. C.