Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20237H970 + (ML20237H970)
- ML20237H971 + (ML20237H971)
- ML20237H972 + (ML20237H972)
- ML20237H975 + (ML20237H975)
- ML20237H976 + (ML20237H976)
- ML20237H978 + (ML20237H978)
- ML20237H981 + (ML20237H981)
- IR 05000324/1987023 + (ML20237H983)
- ML20237H984 + (ML20237H984)
- ML20237H985 + (ML20237H985)
- ML20237H986 + (ML20237H986)
- ML20237H987 + (ML20237H987)
- IR 05000327/1987045 + (ML20237H989)
- ML20237H990 + (ML20237H990)
- ML20237H992 + (ML20237H992)
- ML20237H993 + (ML20237H993)
- ML20237H995 + (ML20237H995)
- ML20237H996 + (ML20237H996)
- A05929, Provides Fourth 90-day Update to 860821 Response to Violations Noted in Insp Repts 50-245/86-06 & 50-336/86-06 on 860324-27.Performance-based Training Program Completed on Schedule in Jul 1987 + (ML20237H997)
- ML20237H999 + (ML20237H999)
- ML20237J000 + (ML20237J000)
- ML20237J001 + (ML20237J001)
- ST-HL-AE-2321, Final Deficiency Rept Re Fgp Series Agastat Relays.Initially Reported on 870714.Qualified Relays & Sockets in Unit 2 Equipment Will Be Installed in Control Panels Prior to Diesel Start Testing + (ML20237J002)
- ML20237J003 + (ML20237J003)
- B12563, Forwards Summary of Consolidation Process Evaluation,Per NRC Request.Util Reviewed Hot Demonstration Consolidation Process & Determined That Project Safe & Technically Acceptable + (ML20237J005)
- ML20237J007 + (ML20237J007)
- ML20237J009 + (ML20237J009)
- ML20237J010 + (ML20237J010)
- B12652, Application for Amend to License DPR-65,per NRC 861208 SER Supporting Amend 113 to License,Changing Tech Specs to Provide Temporary Restrictions to Support Coastdown Operations.Fee Paid + (ML20237J012)
- ML20237J014 + (ML20237J014)
- ML20237J016 + (ML20237J016)
- ML20237J017 + (ML20237J017)
- ML20237J018 + (ML20237J018)
- IR 05000271/1987013 + (ML20237J021)
- ML20237J022 + (ML20237J022)
- ML20237J026 + (ML20237J026)
- 05000304/LER-1987-005-08, :on 870723,during Performance of Procedure PT-10,Nuclear Instrumentation Channel 43 Tripped Reactor Trip Breakers.Caused by Procedural Inadequacy.Procedure to Be Revised + (ML20237J027)
- ML20237J029 + (ML20237J029)
- ML20237J030 + (ML20237J030)
- 05000352/LER-1987-037, :on 870725,nuclear Steam Supply Shutoff Sys Inboard Isolation Occurred Due to Blown Fuse.Caused by Personnel Error.Fuse Replaced,Isolation Reset & Individual Counseled + (ML20237J031)
- ML20237J032 + (ML20237J032)
- TXX-6637, Interim Deficiency Rept CP-87-40 Re Electrical Isolation Between Class 1E Containment high-range Radiation Monitors & non-Class 1E Radiation Monitors.Initially Reported on 870715.Evaluation Continuing.Next Rept Expected by 871123 + (ML20237J033)
- 05000440/LER-1987-054, :on 870722,discovered That Suppression Pool Swell Deflector Shields Required by Design Not Installed for Six Limitorque Operators.Shields Installed & as-built Drawings Completed to Reflect Installation + (ML20237J034)
- ML20237J035 + (ML20237J035)
- ML20237J038 + (ML20237J038)
- ML20237J040 + (ML20237J040)
- ML20237J043 + (ML20237J043)
- ML20237J045 + (ML20237J045)
- NLS8700399, Forwards Revised Tech Spec Page 134 in Support of Util 861124 Proposed Change 37 to License DPR-46.Rev Addresses NRC Concerns Re Surveillance for Continuous Conductivity Monitor & Requirement for Reactor Coolant Sampling Analysis + (ML20237J046)
- DCL-85-333, Applicant Exhibit A-1,consisting of Forwarding Application for Amend to Licenses DPR-80 & DPR-82,changing Tech Specs to Limit Movement of Spent Fuel Shipping Cask in Fuel Handling Areas of Auxiliary Bldg + (ML20237J047)
- ML20237J048 + (ML20237J048)