ML20237H971

From kanterella
Jump to navigation Jump to search
Final Task List:Shift Technical Advisor
ML20237H971
Person / Time
Site: Rancho Seco
Issue date: 01/17/1986
From:
GENERAL PHYSICS CORP.
To:
Shared Package
ML20237H956 List:
References
NUDOCS 8708250231
Download: ML20237H971 (10)


Text

--

k PAGE 1 OF 10 t

1 FINAL TASK LIST:

l Shift Technical Advisor 1

l l

l l

I 1

\\

9 prepared for Rancho Seco Training r

l l

l I

l l

4 l

1 F

l

?

~___-

by General Physics f

t 8700250231 070810 PDR ADOCK 05000312 V

PDR O

l_

PAGE 2 0F 10-

~

.c NED - Name Editor / General Physics' Corporation i

RANCHO SECO SHIFT TECHNICAL ADVISOR' l

Survey sheet names / Page 1 / 01-17-1956 l

l 351 MONITOR PLANT EQUIPMENT OPERATIONS 352

-TRANSIENT AND ACCIDENT ASSESSMENT l

353 OPERATING EXPERIENCE ASSESSMENT 354 SHIFT TRAINING 355 ADMINISTRATION 356 OPERATIONAL' QUALITY CONTROL 357 PLANT / SYSTEM CONFIGURATION EVALUATION 35S MISCELLANEOUS 4

e, O

I t

a__--_-_:-_______-_____-____--.

PAGE 3 0F 10 SED - Survey Sheet Editor / General Physics Corporation Print Date: 01-17-1986 Eurvey sheet #351: MONITOR PLANT EQUIPMENT OPERATIONS 351/001/01/05/000 -- (DELETE) Observe.significant planned evolutions (e.g.,

taking the reactor critical) 351/002/01/05/000 -- Assist the Shift Supervisor in evaluating non-routine plant conditions 351/003/01/05/000 -- Review the shift's legs, turnover sheets and-chemistry data for plant status and trends 351/004/01/05/000 -- Make-daily plant inspection 351/005/01/05/000 -- Review the plant status and planned shift j

activities with the Shift Supervisor 351/006/01/05/000 -- Assist shift supervisor in evaluating the status tech spec time clock on saf ety-related equipment 351/008/01/05/000 -- Check systems governed by tech specs to ensure operability requirements are met 351/009/01/05/000 -~ Monitor indications for systems not governed by tech specs for proper operation 351/010/01/05/200 -- Review unit conditions to ensure compliance with tech specs during short outages 351/011/01/05/200 -- Provide tecnnical assistance in troubleshooting system malfunctions 351/101/01/05/000 -- (ADD) Observe plant startup 351/102/01/05/000 -- (ADD) Observe plant shutdown i

Number of tasks in this surveys 12 W

e

~

1 PAGE 4 0F 10 i

SED - Survey Sheet Editor / General Physics Corporation Print Date: 01-17-1986 j

l Survey sheet #352: TRANSIENT AND ACCIDENT ASSESSMENT I

352/001/01/05/000 -- (DELETE) Report to Control to provide tech assist to Shift Spvr during accidents or abnormal events I

352/002/01/05/200 -- Recommend actions to ensure that core cooling and l

J the subcooling margin are maintained 352/003/01/05/000 -- Independently verify the operating shift's identification of an event 352/004/01/05/000 -- Determine whether concurrent events are occurring 352/005/01/05/000 -- Evaluate the incident to determine that events are following the expected sequence 352/006/01/05/200 -- Integrate available information to maintain a broad perspective of the event 352/007/01/05/000 -- (DELETE) Observe the operating shift's response to the evsnt 052/008/01/05/000 -- Recommend actions to mitigate or terminate the event 352/009/01/05/000 -- Recommend the Shift Supervisor contact appropriate personnel for assistance, if needed 352/011/01/05/200 -- Determine if indications of core damage are present 352/012/01/05/000 -- Verif y plant indications to identif y conflicting or potentially inaccurate responses 352/015/01/05/000 -- Provide recommendations on classification of event in terms of levels of the Emergency Plan l

352/017/01/05/000 -- Analyze indications to determine the cause of the event 352/018/01/05/000 -- Recommend corrective action to mitigate the cause of the event 352/019/01/05/200 -- (DELETE) Identif y limiting conditions of remaining in post-accident condition during repairs 352/020/01/05/000 -- Clarify tech specs and application of actions statement requirements for the incident 350/021/01/05/000 -- Perform cales to determine plant status (e.g. fluid l

flow / heat balance, beric acid dilution, shutdown) 352/022/01/05/000 -- Make recommendations on restoration of the unit or l

l system to operation 352/02 /01/05/000 -- Write (Delete-inputs to) AP-22s, Plant Trip l

Reports (ADD-and STA Transient Assessment Reports) 352/024/01/05/000 -- Following an incident, review the af f ected system l

design / performance and recommend modifications 352/025/01/05/000 -- Following an incident, review procedures for l

l effectiveness and recommend revisions 352/101/01/05/000 -- (ADD) Verify operators perform all required actions of the Emergency Plan i

Number of tasks in this surveys 22 l

l L

PAGE.5 0F 10 4

! ~

SED - Survey Sheet Editor-/ General Physics Corporation Print Date: 01-17-1986 l

Survey sheet #353: OPERATING EXPERIENCE ASSESSMENT l

[

333/001/01/05/000 -- Independently review operations reports (e.g. LER) preped by station (and recommend) corrective action 13/002/01/05/000 -- Review station / agency reports (e.g.,

NRC,INPD) for applicability & det if' corrective action necessary 353/004/01/05/200 -- Transmit applicable (DEL - safety-related) info to Trai_ning Dept for inclusion in training programs

' 353/006/01/05/000 -- Evaluate the adequacy of operating procedures to assure safe, normal operations 353/007/01/05/000 -- Evaluate the adequacy of abnormal and emergency procedures for mitigation capabilities 353/008/01/05/000 -- Review the recommendations of operating personnel and id necessary (DEL-mods) ( ADD-corrective action) 353/012/01/05/000 -- Maintain knowledge of modifications to plant (DELETE - safety-related) equipment 353/013/01/05/000 -- Write Operational Assessment Reports 353/014/01/05/000 -- Mark up drawings to show as-built conditions 353/101/01/05/000 -- (ADD) Maintain knowledge of revisions to plant procedures Number of tasks in this surveys 10 s

t I

L

_2.

1.

PAGE 6 OE 10~.

h.

SED - Survey Sheet Editor / General. Physics Corporation Print Date: 01-17-1986 Eurvey sheet #354: SHIFT TRAINING 354/202/01/05/000 -- (DELETE) ' Answer technical questions f rom shif t operators Number of tasks in this: surveys 1 e

9 I

i l

l l

4 i

l t

t

'l i

+

i

1 PACE 7-0F 10 1

SED - Survey Sheet Editor / General Physics Corporation Print Date: 01-17-1986 Burvey sheet #!55: ADMINISTRATION 355/001/01/05/000 -- Write entries in the Shif t Technical Advisor (STA) log (plant status and important events) 355/002/01/05/000 -- (DELETE) Conduct a Shift Technical Advisor (STA) relief turnover 255/003/01/05/000 -- (DELETE) Road technical updates from NRC, l

contractor, other sources, etc.

j

!$5/004/01/05/000 -- (DELETE) Write operational. reports (AP-22s, Plant l

Trip Reports, STA Transient Assessment Reports) l 355/005/01/05/000 -- (DELETE) Read the Operations Department i

orders / memos (e.g.,

night orders) l 355/006/01/05/200 -- Write Work Requests 355/008/01/05/000 -- (DELETE) Report status of work progress 355/009/01/05/000 -- (DELETE) Complete standard Company forms (e.g.,

time sheets, etc.)

355/010/01/05/200 -- (DELETE) Plan own work activities 1

353/011/01/05/000 -- (DELETE) Coordinate work with other Departments l

355/012/01/05/200 -- (DELETE) Estimate completion time for work activities 355/013/01/05/000 -- (DELETE) Check completed work of others 353/101/01/05/200 -- (ADD) Write entries in Plant Daily Log i

Number of tasks in this survey: 13 l

l l

l k

e O

r-1 PAGE 8 0F 10 l

SED - Survey Sheet Editor / General Physics Corporation Print Date: 01-17-1986 Eurvey sheet #356: OPERATIONAL QUALITY CONTROL 356/001/01/05/000 -- Check status of plant equipment (e.g.,

val ve lineups, switch lineups, etc.)

356/002/01/05/000 -- Observe operators while they perform survei.11ance procedures 356/003/01/05/000 -- Observe that operators conform to shift administrative procedures and requirements 056/004/01/05/000 -- Observe that equipment is operated in accordance i

with operating procedures 356/005/01/05/000 -- (DELETE) Write Operational Quality Control Reports (i. e., individual task reports) 356/101/01/05/000 -- (ADD) Verify status of selected outstanding clearances Number of tasks in this survey: 6 I

t 4

e i

)

.PAGE 9'0F.10 5

SED - Survey Sheet Editor / General Physics. Corporation

~

Print-Date: 01-17-1986 Eurvey sheet #357: ' PLANT / SYSTEM CONFIGURATION EVALUATION

'357/001/02/05/000 -- Review requests for additional-information-on plant

.357/202/02/05/000 - Identify systems / components involved l

l 357/003/02/05/200 - Determine system / component operating constraints j

J ! 357/204/02/05/000 - Analyze system / component' to justify the answer to the request t'357/005/02/05/000 -- Write report in response to the request y

357/006/02/05/200 - ' Submit report for review / approval i

357/207/02/05/000 - (DELETE) Track report during review / approval l

process 357/008/02/05/000 - - Correct / revise. report as necessary

-}

Number of tasks in this survey: 8 l

l b

l L

6 l

L4 L

T-e n

i

(

(

U.x

(

4 e

PAGE 10 Of-10 i

SED - Survey Sheet Editor _/ General Ph'ysics Corporation Print Dates- 01-17-1986 Survey sheet b759: MISCELLANEOUS j

)

33B/001/02/05/000 -- Write new procedures a353/002/02/05/000 -- Revise current procedures 9 358/003/02/05/200 - (DELETE) Review procedures in review / approval

'l' process

!SB/004/02/05/000 - (DELETE) Attend off-site /vander training courses, workshops, seminars, etc.

1

'358/005/02/05/200 -' Conduct on-the-job training (DJT) for other Shift

.]

Technical Advisors (STAS)

.( ADD-& Plant Engineers) 058/006/02/05/200 - Use/ operate plant operations computer ( e..g.,

Bailey, ModComp) i 1

I Number of tasks in this survey: 6 i

-)

l

/

l l

f 1'

J

_ _3

.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _