Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235J158 + (ML20235J158)
- ML20235J159 + (ML20235J159)
- ML20235J160 + (ML20235J160)
- ML20235J165 + (ML20235J165)
- ML20235J168 + (ML20235J168)
- NLS8700318, Submits Status of Util Response to Insp Rept 50-298/86-03. Original Scope Security Lighting Upgrade Project Completed on 870630.Mercury Vapor Floodlights on turbine-generator Bldg Will Be Replaced W/High Pressure Sodium Lamps + (ML20235J171)
- ML20235J172 + (ML20235J172)
- ML20235J174 + (ML20235J174)
- 05000298/LER-1987-020, :on 870827,discovered That Annual Insps Performed in 1984 Not Accomplished within 15 Months.Caused by Misunderstanding of Term Annual. Definition of Testing Intervals & Procedural Changes Made + (ML20235J175)
- ML20235J176 + (ML20235J176)
- ML20235J177 + (ML20235J177)
- ML20235J178 + (ML20235J178)
- ML20235J179 + (ML20235J179)
- ML20235J180 + (ML20235J180)
- 05000482/LER-1989-001, :on 890120,discovered That Diesel Generator Not Tested at Least Once Every 7 Days Per Tech Specs.Testing Frequency Reduced to Once Per 31 Days Following 890106 Test. Caused by Personnel Error.Personnel Instructed + (ML20235J181)
- ML20235J182 + (ML20235J182)
- ML20235J184 + (ML20235J184)
- ML20235J185 + (ML20235J185)
- ML20235J186 + (ML20235J186)
- ML20235J187 + (ML20235J187)
- ML20235J188 + (ML20235J188)
- IR 05000336/1987014 + (ML20235J190)
- ML20235J191 + (ML20235J191)
- ML20235J192 + (ML20235J192)
- NLS8700330, Application for Amend to License DPR-46,consisting of Proposed Change 42,incorporating All Amends to OL Through Amend 108 Issued on 870420.Fee Paid + (ML20235J193)
- ML20235J194 + (ML20235J194)
- ML20235J197 + (ML20235J197)
- ML20235J198 + (ML20235J198)
- ML20235J199 + (ML20235J199)
- ML20235J201 + (ML20235J201)
- ML20235J202 + (ML20235J202)
- AECM-89-0035, Monthly Operating Rept for Jan 1989 for Grand Gulf Nuclear Station Unit 1 + (ML20235J205)
- ML20235J206 + (ML20235J206)
- ML20235J209 + (ML20235J209)
- ML20235J210 + (ML20235J210)
- ML20235J211 + (ML20235J211)
- ML20235J212 + (ML20235J212)
- RBG-26673, Forwards Rev 2 to Radwaste Processing Control Program, for Review & Approval,Per NUREG-0989 + (ML20235J215)
- ML20235J216 + (ML20235J216)
- ML20235J219 + (ML20235J219)
- ML20235J221 + (ML20235J221)
- ML20235J229 + (ML20235J229)
- ML20235J230 + (ML20235J230)
- ML20235J236 + (ML20235J236)
- ML20235J239 + (ML20235J239)
- ML20235J240 + (ML20235J240)
- ML20235J241 + (ML20235J241)
- ML20235J243 + (ML20235J243)
- ML20235J244 + (ML20235J244)
- SNRC-1552, Forwards Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Engineering Study Verified That Instrument Air Receivers & Accumulators Designed Per ANSI & ASME Codes + (ML20235J245)
- ML20235J247 + (ML20235J247)