Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216J935 + (ML20216J935)
- ML20216J937 + (ML20216J937)
- ML20216J941 + (ML20216J941)
- ML20216J943 + (ML20216J943)
- ML20216J944 + (ML20216J944)
- ML20216J947 + (ML20216J947)
- L-98-070, Forwards BVPS Unit 1,Cycle 13 Startup Physics Test Rept. Rept Summarizes Applicable Physics Testing Performed to Verify Adequacy of Cycle 13 Reload Core Design + (ML20216J950)
- ML20216J951 + (ML20216J951)
- 05000416/LER-1990-019-01, :on 901014,during Refueling Outage Four,Three Events Occurred in Which Same Power Supply Breaker Inadvertently Opened + (ML20216J959)
- ML20216J962 + (ML20216J962)
- ML20216J963 + (ML20216J963)
- ML20216J965 + (ML20216J965)
- ML20216J970 + (ML20216J970)
- IR 05000334/1999005 + (ML20216J971)
- ML20216J972 + (ML20216J972)
- ML20216J974 + (ML20216J974)
- ML20216J977 + (ML20216J977)
- 05000373/LER-1990-012-04, :on 901016,automatic Start of Oa Control Room Emergency Makeup Fan Occurred Due to Procedural Deficiency + (ML20216J979)
- ML20216J980 + (ML20216J980)
- ML20216J981 + (ML20216J981)
- ML20216J984 + (ML20216J984)
- ML20216J986 + (ML20216J986)
- IR 05000146/1999202 + (ML20216J988)
- 05000369/LER-1990-026-01, :on 901012,determined That Both Trains of Annulus Ventilation Sys Rendered Inoperable & Judged to Be Unable to Create Required Negative Pressure in Annulus within Required Time + (ML20216J989)
- 05000321/LER-1990-021, :on 901015,unit Manually Scrammed Due to High Vibration of Main Turbine + (ML20216J992)
- ML20216J993 + (ML20216J993)
- W3P90-1532, Advises That DA Linders Left Employment W/Util & No Longer Requires Reactor Operator License + (ML20216J995)
- ML20216J996 + (ML20216J996)
- ML20216J997 + (ML20216J997)
- 05000341/LER-1998-002, :on 980220,inadvertent Load Shed of ESF Bus 72E During Performance of Surveillance Test Resulting in ESF Actuations Occurred.Caused by Inadequate Procedure Rev. Power Was Restored to Affected Loads by 1344 Hrs on 980220 + (ML20216J998)
- ML20216K000 + (ML20216K000)
- ML20216K001 + (ML20216K001)
- ML20216K007 + (ML20216K007)
- ML20216K008 + (ML20216K008)
- NG-98-0398, Monthly Operating Rept for Feb 1998 for DAEC + (ML20216K009)
- ML20216K010 + (ML20216K010)
- IR 05000313/1990030 + (ML20216K012)
- ML20216K013 + (ML20216K013)
- ML20216K015 + (ML20216K015)
- IR 05000346/1997201 + (ML20216K016)
- ML20216K018 + (ML20216K018)
- 05000409/LER-1990-004, :on 901013,diesel Generator 1A Failed to Successfully Complete 18-month Test + (ML20216K021)
- ML20216K022 + (ML20216K022)
- ML20216K023 + (ML20216K023)
- 05000339/LER-1989-003, Advises of Change in Reportability for LER 89-003-00 Re 10 Containment Isolation Valves W/Excessive Leak Rates + (ML20216K024)
- ML20216K027 + (ML20216K027)
- ML20216K028 + (ML20216K028)
- U-602829, Monthly Operating Rept for Aug 1997 for Clinton Power Station,Unit 1 + (ML20216K029)
- ML20216K032 + (ML20216K032)
- ML20216K034 + (ML20216K034)
- IR 05000482/1990026 + (ML20216K035)